Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2006-00322
!JILDING PERMIT APPLICAT N MRLevypiewT01 Type0 : I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD06-00322 Received Date: 6/8/2006 SITE ADDRESS: 42 E SNOW CREEK WAY QUILCENE, 98376 OWNER: JOHN T JENKINS PHONE: (360)457-6246 403 S LINCOLN ST STE 4 PORT ANGELES WA 98362-3025 SNOW CREEK RANCH SUBDIVISION: Block: Lot: 12 PARCEL NUMBER: 995400011 Section: 12 Township: 28 N Range: 02 W CONTRACTOR: OWNER/BUILDER PHONE: REPRESENTATIVE: PHONE: PROJECT DESCRIPTIO/ REMODEL SFR - ADD BATHROOM, CHANGE OUT WINDOWS, NEW ROOF, CONVERT BONUS RM TO BEDROOM AND ADD 2 PORCHES TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP ALT MAIN: VALUATION 35,000.00 ADD'L: HEAT TYPE: CODE EDITION: 2003 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: SHORELINE: CONST TYPE: DECK: 377 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: ALT WATER SYSTEM: PUD BEDROOMS: BATHROOMS: Exist: 1 Exist: 1 Prop: 1 Prop: 1 Total: 2 Total: 2 Routing Date: Slog@ Type Amount Paid By: Date: Receipt: ® Permit $492.25 KAS 06/08/06 83435 !'"l a ' ' D State Building Code $4.50 KAS 06/08/06 83435 JUL 1 2006 Plan Check $319.97 KAS 06/08/06 83435 Total: $816.72 Jefferson County Planning &Building Department esoN (be._ DEPARTMENT OF COMMUNITY DEVELOPMENT 4. 2a 621 Sheridan Street,Port Townsend,WA 98368 't 1 Tel:360.379.4450 Fax:360.379.4451 Web:www.co.jefferson.wa.us/communitydevelopment 9,gy0 E-mail:dcd@co.jefferson.wa.us CERTIFICATE OF OCCUPANCY PERMIT#: BLD06-00322 APPLICANT: MARK GORDON PHONE: PO BOX 121 QUILCENE WA 98376 SITE ADDRESS: 42 E SNOW CREEK WAY Issue Date: 07/7/2006 QUILCENE, 98376 Final Date: 11/30/2015 SUBDIVISION: 9954 - SNOW CREEK RANCH Block: Lot: PARCEL NUMBER: 995400011 Section: 12 Township: 28 N Range: 2W PROJECT DESCRIPTION: REMODEL SFR -ADD BATHROOM, CHANGE OUT WINDOWS, NEW ROOF, CONVERT BONUS RM TO BEDROOM AND ADD 2 PORCHES THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2003 EDITION. OCCUPANCY GROUP: TYPE OF CONSTRUCTION: SPRINKLER SYSTEM yes no THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 11/30/2015 Building Official, \\tidem ark\data\forms\F_BLD_Occu pancy.rpt 12/1/2015 • BUILDER STATEMENT 4111 The signer of this tatement does h y certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be amu n the responsi• 1 the General Contractor for the proposed project / ]� Signature: C.f ,u +✓♦ Date: ! 4,,/,Z 11�.c Ea 11-R 7E GENERAL CONTRACTOR OR MANUFAC RED HOME INSTALLER: PHONE: FAX: ( ) atilt — 612i/Od MAILING ADDRESS: EMAIL: { CONTRACTOR'S LICENSE WAINS PRP ��'�'�l-r i n( NUMBER: NUMBER V i pI ARCHITECT/ENGINEER: PHONE ( ) FAX: (' L'u ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: ❑ New A Wood Existing: � ❑ Sewer Addition ❑ Steel Proposed: Bank Height: ❑ Community System . Alteration/Remodel ❑ Concrete Total: I 'Individual System /4 SEP Permit# US--`-rill O Repair ❑ Masonry 0 O Demolition ❑ Other: Bedrooms: Water Supply: Existing: Setback: 0 Private well ❑ Two Party Type of Heat: Proposed: ' Public Y I R c Total: 42 kVA Name of SystemTPOD*1 If this is a Commercial Protect you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: ❑ Underground Tank 0 Above ground Tank Size of Propane Tank: NV ❑ Heat Stove 0 Cook Stove 0 Woodstove CI Fireplace Insert CI Hot Water Tank 0 Pellet Stove ❑ Other Is this appliance being installed in a Manufactured 1 Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. Square Footage Current Proposed !A-E ' ' 1 :1 .- ;a=1 ,,. . _ .1 Main Floor Heated g6 D i,;~, EH Bld App Review: �}tii?' . V o 2"°Floor Heated f1 _} Consistency Review: Other Heated . ,,- ` Base fee: 4q a. a5 Mezzanine ` ';0� ' Additional Section: �te : . at Heated Basement ,, - Plan Check fee: 2✓� ::5,,M.:,-.1„0": ,;,;:' 3/9q71 Unheated Basement 4,1:'g:11„--d,,'!12-..; Surcharge fee: ',0 ',�{ 4. 5D Other Unheated -. , ,' Pot Water Review fee: Garage/Carport . SUBTOTAL 1 A 4 7a Decks ', 911/Rd Approach fee: !�s r I Other I lJll �i?j��` `� 77 13-00TOTAL: $ i 0314,--/;,-, -;!4.41;:,4,':. ;: Receipt Number: ( � ' 4- Cash/Check Number: f ESTIM TED COST(REQUIRED) Date: f f g / � air et value of all labor and aterials foundatio to finish (p V! Initials: (KZ G:\PeunitCentel\FORMS\DR'b FO' 1 c vast ' Ap lication 12-3 .doc 5,tsoo • BUILDER STATEMENT 1111 The signer of this tatement does h y certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be a f ng the responsi. the General Contractor for the proposed proje/pt + Signature: A A Date: G / t'/4Z R1(�. C Et y GENERAL CONTRACTOR OR MANUFAC RED HOME INSTALLER: PHONE: FAX: 9 ( ) Jilt MAILING ADDRESS: EMAIL: "�� CONTRACTOR'S LICENSE WAINS [ NUMBER: NUMBER Ert g N rt(11ill(Y (TRo ARCHITECT/ENGINEER: PHONE ( ) FAX: (it'', ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: ❑ New Al Wood Existing: � ❑ Sewer A.Addition ❑ Steel Proposed: Bank Height: u Community System A Alteration/Remodel ❑ Concrete Total: 'Individual System o Repair 0 Masonry 0/(-1SEP Permit# U5-`aril Bedrooms: o Demolition 0 Other: Water Supply: Existing: Setback: 0 Private well ❑ Two Party Type of Meat: • Proposed: litsPublic Y` -fir Total: c=2 /14 Name of System7: OD*1 If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy:ik IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: El Underground Tank ❑ Above ground Tank Size of Propane Tank: 0 Heat Stove ❑ Cook Stove 0 Woodstove ❑ Fireplace Insert ❑ Hot Water Tank 0 Pellet Stove 0 Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size,distances from the propane tank to all properly lines,buildings and septic system components, including the reserve area. 1' t : ,? zn.r .a [z #x % "G*rsF" '. 3 ,r k A z xr"tt° a24 -n: ,,,,..v.,.-...11,4c4 l-astl"' P'I {t HY.. 1-y.,,ft,-v -, T}� ,4 yN - # .a.5 Y fF.. Square Footage Current Pro osed " �: V WOnly n �- " ` ,Agiszbil,.it ,° ,4� ,` Main Floor Heated41 EH Bld App Review: 2' Floor Heated ? k,r •is Consistency Review: Z 133. 00 Other Heated ' '_ Base fee: 461a. aS f. Mezzanine ,'4.!';'--07,','. Additional Section: U '3F Heated Basement -. Plan Check fee: gt , 3/94q7 . Unheated Basement ,14;=> 1-'7,-- State Surcharge fee: Other Unheated p r ' Pot Water Review fee: 4i:,; Garage/Carport E/j�/�� , SUBTOTAL 2]' �/ 34 fAd x , 0L 4,73\ Decks Z.=lam 911/Rd Approach fee: €)(45+- )/ q Other yUUI��;ii1 povi -'g77 TOTAL: $ /D 3q,-7, ^{-„ Receipt Number 'S 4 Cash/Check Number: 1 ESTIMATED COST(REQUIRED) .---- - , Date: /g /D/ aif et value of all labor and aterials foundatio to finish ( ! h ]Vl , Initials: olci/ce,:) 6<ti) G:\PermitCente/\FORMS\DR'6 PO., . 'ast ' Ap lication 12-3 .doc 5, aoo • 41 ..i"). Ecif 111-4-4,• ' D ati -.I sea JEFFERSON COON-111ED 1•40.11111,011,......014.4011 '.,, c:•" . -....4.- N # .... c. _-. .# AI — — — — — — — — — I ' ....... _ i --- \ / 1 •-•-__1 11. .1 : -•,. F.) 1 / • --, ko• ii• t # rii- I •-, !i 1..?_ . 0 f 1 i•-, A'-, ) I I J1 1 4 4 .,-.0)Eassomtm. 1r, i , v• -a ! . z)r..--) I N.I . . I •-, .: , ill .i. • , 5: t ! .. A #-- — 1- ili • 1 : -.:1 A . CI - 1 ii,, . , • 1,3 i •! ' i-L-1 to 111 , _ ..... ....., _..... ..... _ _ . . _...... . . .. . - a • 1 A $ Q Iii 0 i ••""7",7 \J < tj -- I ! 4) 41:). 0 I 1 a`-'1 .A. . I li .,..J.,..-•:- /. il4 6 LI ..... _ _ _ _ _ _ _ ilc..1. _ , - 1 i-- P. _ ..: ,,D '..-- . i it i r • 7 It I 3 . --- li Ilf-4 AN 210'05 Lt frke/ 4ilh 4 r .. , S IA —1.q —3 p11. 11\ a c 6 _ . . 2 -1- W c1µ 4.43‘ l CS- c=:, U cc i• a . 1 L_._ lg. 4, ,....1 9 x , c /.1 'l 0 i�f. �_ IIT # 6[D 032 2 \ , r 4 -',,� JEFf�RSON COUNTY ° . I D—`�1 *0 S A V _ -4,, 'KS ' } N. rR 1;5set . g1 N A q 7ry`,° N M / / ce—4 o� I Q w _ _^ / r1 z Y Fill - 1jI N I -4 ,, i / W �- i IL' .,,8 _ _J -SN / 4,3" / g ;II ill a"' / ,silf / r:61 E 4 = -"..a. 1Y+ zeeN7/ e4 I.. .o 1 < . 6 1 z z Ii i i a / _ z / t/� # - ii; IN " t10 �'y � IK 4 / , /4 , W i� , �� oo� o� 1 ...... ._ O z / L u, c4 <I 'Al- ,-1&I fL 1� O O ' �`J 3p ry .--,,� cry 1 cz Cj 44,, 1 / Q N g-. {I ti%m o �F% 0 0 • 0 --)11 2+1 ILXE C WED .re71141% JEFFERSON COUNTY 4 b DEPARTMENT OF COMMUNITY DEVELOPMENT 4 ` " a A,. 621 Sheridan Street• Port Townsend •Washington 98368 360/379-4450.360/379-4451 Fax JEFFERSON COUNTY UCO `z ##1" http://www.co.jefferson.wa.us/oommdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMPLATE MUd . oto - 30 1 ."--- NAME: 3o0-{k. I; ‘,„.. E.-Al gdALS Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land UseApfl ication or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. b S rrE.. 'F07, FSr IS ExLSTtFJ Existing Conditions Summary [[C ® G 2. Describe the existing topography. Indicate contours on the site map. JE SU�COUNTY D C!I►11 is V 1-47- • 555L-t6r-- SL 0 &: "t�YJpd S ; L AS-7 4,07 rz�) ? 4`iiE `N� 1 .j E F&5r DYEt -A —t Oi - (zit;;✓s i_. 7zoiu, ,t,i;d'y 1.--eD -; Vtt r Oct. Ct?r.i. 1 ' el-ETA-71W �• S rE 3. Dpscribe the existing vegetation. Indicate native vegetation areas on the site map. MOST- TP eF Cpl? E.1. L ..4 Vcc. -`C 11, .S (-OF-ASS . ©ASF: t., JAS I iiNICCII't..: rA S:)c AAA? • 4. Describe the existing sods; Indicate soil type on thehsite map. J t J, t VE L.S ,4g ! ' it PiEsx ::7 /L� -I f��l>-. 1-. ,1, ,, / PE;tzi'2D IN Sc;iLS fe- S VP StL( L-oPdM FISx't �) v nc_.) ME C 04 r.i�I c txcr --6?Is'L sCR.1E6a 5. Describe the existing site hydrology(i.e.,drainage;behavior of water do the site—above,below,and on the ground). Indicate mt existing stowater drainage" to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. i{1.4..- J C DE-5 To 1t "D iZtL.°r-Ll/ Viz- f nit!C T . c-t�' 'T C. ICRTT- AT Tt ." S eir . MOS 8DWe 9F /DIE " fi e NE& Atm A S C om' Ev D ABX.' -_ -T5 ClLAK-E- 6. Describe y excess levels of noise generated by the proposed use or activity: APPROVED Mt)kir S I ORM WATER PLAN IIIStormw, =ii JUN 2 0 2006 stomerater site pan template_rev.1dV2003 Require At.l .�. JEF - . . to ® e DEPT.OF ' p 1 P E SIGNAT - II or VII • I 7. Describe significant geographic features and critical areas (Le., environmentally sensitive areas such as wetlands, streams, steep slopes,pttcc.)Qn the site. Indicate location on the site map. 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads,and sensitive/critical areas (streams,wetlands,lakes,steep slopes,etc.. LAO-r-> b -141-Lt st� IS eta i Gle °r} . W This tkA t-JETID.- -Ta ' 'E 51 )77 tJ � ra j- 1$ Mf.i/ j ?z ,zDENT Permanent Stormwater Control Plan This portion of the Stormwater Site Plan consists of the selection and installation.of the appropriate stormwater control BMPs and facilities to remain in place after construction of the project is completed. "Medium"size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facilities are not exceeded. g_ Describe the developed site hydrology, as proposed. Indicate whether stonnwater will be fully dispersed(i.e., per BMP 15.30 in the Manual)or,if not,what types of stormwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. 10. If the project requires the use of stormwater treatment facilities,descrbe the types of stormwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This Is normally for large"projects or projects that involve the potential for dispersion of contaminants.] 11. Describe theperformance RECEIVED VED goals and standards applicable to the project. ea;ut. .44445 JEFFERSON COUNTY DCII 12. Describe the flow control system. • 6 stecrewater site pan template—rev.ionaoce 1 13. Describe the water quality system. tit ECEIVE f 14. Describe the conveyance system analysis and design. j ”„" JEp1EesGJ COUNTY r,",. 15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material. 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. 17. Describe the proposed surfacing material. 18. Describe methods for restoration of the site. 19. An Operation and Maintenance Manual is required for each flow control and treatment facfiity. [This is normally required for large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. • 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. sto �water site plan template—rev.1(/1/2003 7 m • • CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentally sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet for guidance, particularly with rural residential development. SECTION I—CONSTRUCTION SWPPP NARRATIVE 1. Construction Stonnwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal,justify in writing. Descriptions of the 12 Elements are found at section 2.5.2 of the Manual(beginning on page 2-15). 12 Required Elements—Construction SWPPP 1. Mark Clearing Limits. 2. Establish Construction Access. 3. Control Flow Rates. 4. Install Sediment Controls_ 5. Stabilize Soils. 6. Protect Slopes. RECEIVEP 7. Protect Drain Inlets. r' • • . l� f G storrrwater site plan template-rev-7 b1l2003 8 • 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. 9. Control Pollutants. REC FAVED 1 10. Control De-Watering(the act of pumping groundwater or stormwater away frojgTilagi3l 4tan13w. 11. Maintain Best Management Practices(SMPs). 12. Manage the Project. 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas,roads). b. Description of the downstream drainage path leafing from the site to the yards). receiving body of water(minimum distance of 400 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. stonrmater site plan template—rev.10/112000 9 • • b. Description of special requirements for working in or near environmentally sensitive areas. 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils(e.g.,erodibility,settleability,permeability,depth,texture,soil structure). 5. Construction Phasing. a. Construction sequence b. Construction phasing Cif proposed) 6. Construction Schedule. Wet season is October 1 through April 30(page 2-21 of the Manual). i. Provide a proposed construction schedule. II. Wet Season Construction Activities. a. Proposed wet season construction activities. b. Proposed wet season construction activities for environmentally sensitive areas. 7. F'manciaVOwnership Responsibilities. a Identify the property owner responsible for the initiation of bonds and/or other financial securities. b. Descnbe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. RECErvED 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following,if applicable. 170r a. Sediment Ponds/Traps. b. Diversions. c. Waterways. d. Runoff/Stormwater Detention Calculations UEI FCHON C6LNTY �U stormwater s"rte plan template-rer.10!12003 10 • • Stormwater Site Plan Changes If the designer wishes to make changes or revisions to the originally approved Stormwater Site Plan,the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include alt proposed changes, revised drawings showing any structural changes,and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems,treatment facilities,flow control facilities,or structural source control BMPs (not standard on-site stormwater management BMPs),the applicant shall submit a final corrected plan('as-builts')when the project is completed. These should be engineering drawings (stamped by a licensed civil engineer) that accurately represent the project as constructed. APPUCANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the . • t of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the a ect . property. 1l �L. ' ► ( ..A" a• ,�` (t"S'. •••..�.REPRESEHTATIVESICGWTURE) (DATE) THIS SPACE MAY BE USED FOR ADDI11ONAL NOTES,IF NEEDED: Lt' F tb 'l'iEJ[_) v 9 1066 AffERSON COUIftY DCJ 12 stomaler site ptemplate—rev.,0'12003 mplan BUILDING PERMIT 411 Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD06-00322 Received Date 06/8/2006 SITE ADDRESS: 42 E SNOW CREEK WAY Issue Date 07/7/2006 QUILCENE, 98376 APPLICANT: JOHN T JENKINS PHONE: (360) 457-6246 403 S LINCOLN ST STE 4 PORT ANGELES WA 98362-3025 SUBDIVISION: SNOW CREEK RANCH Block: Lot: 12 PARCEL NUMBER: 995400011 Section: 12 Township: 28 N Range: 02 W CONTRACTOR: OWNER/BUILDER PHONE: PROJECT DESCRIPTION: REMODEL SFR-ADD BATHROOM, CHANGE OUT WINDOWS, NEW ROOF, CONVERT BONUS RM TO BEDROOM AND ADD 2 PORCHES CAL • I - - - -* IRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: UFFER: S TEi?.i-W1' -# OLD O5- Dc41.915 Footing: •undation: Stormwater FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : Sheathing: Framing: IV( 1//17/44 Plumbing: OK Rh7/oG Propane Tank/Lines: Insulation: A2 5 DK N /746 Sheetrock: Qy /„1/410‘ Septic Sytem Finalva UST be obtained before final of structure can be attempted. Road Approach Final Approval: Zoning Final Approval: Final/ Occupancy Approval: // /1�� ,p HEALTH DEPARTMENT AND PU IC W KS APPR6VAL REP I IRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE • SPECIAL CONDITIONS FOR CASE # BLD06-00322 1.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 2.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 3.) A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 4.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 5.) Not more than two(2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 6.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 7.) Minimum setback from East and West Snow Creek Way rights-of-ways shall be 20 feet. Minimum setback from SR 101 right-of-way shall be 50 feet. 8.) Exterior lighting for residential uses shall not exceed twenty feet(20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 9.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 10.) The building height is not to exceed 35 feet. I:\F_BLD_Permit_Buildng.rpt 10/29/1999