HomeMy WebLinkAbout121415_cabs01Department of Public Works
O Afternoon Workshop
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, Public Works Director
Agenda Date: December 14, 2015, 1:30pm
Subject: Briefing for Parks and Recreation Advisory Board Capital Plan
Statement of Issue: The Jefferson County Parks and Recreation Advisory Board
(JCPRAB) has completed and unanimously recommended a prioritized capital
improvement plan (CIP). The JCPRAB seeks to present the plan and discuss
implementation and funding with the BoCC in a workshop format.
Analysis/Strategic Goals/Pro's Et Con's: The prioritized CIP was based primarily on
the Parks, Recreation and Open Space Comprehensive Plan. The JCPRAB held a
retreat, and worked on the CIP for over a year. The CIP was field checked through a
parks tour.
Fiscal Impact/Cost Benefit Analysis: The CIP provides detailed information regarding
the capital maintenance backlog in the parks.
Recommendation: Hold the workshop and discuss the CIP.
Department Contact: Matt Tyler. 385-9129
Reviewed By:
f
slip Mori ,y, ounty dmini rator Date
Jefferson County Parks and
Recreation Advisory Board
Capita
Improvement Plan
Planning in the Interest of the Community
14 December 2015
Parks, Recreation and Open Space Plan
(PROS Plan)
• Major findings were incorporated from public input as documented in
ERPRC Recommendations:
• Parks & Recreation are important
• Save what you have
• Updated plan completed in Dec 2014 and adopted by Jefferson County
in early 2015
• Approved by the RCO in mid 2015
• Strong public process with input by JCPRAB and BoCC
• Fast approval, (submitted June 24, 2015, approved June 30, 2015)
• CIP represents the "marching orders" of the plan
• Challenge then was how to implement the CIP
JCPRAB Retreat Winter 2015
• The JCPRAB held a retreat in March, 2015
• Purposes of the retreat were to:
• Introduce the newer members to the JCPRAB
• Update and refresh the JCPRAB Goals and Objectives
• Strategize how to implement the PROS plan
• To develop and prioritize the CIP
• To 'get stuff done, check it off' — by board and volunteers
• To promote and participate in larger projects
Capital Improvement Plan
Prioritization Process
• There are roughly 90 items on the CIP
• Needed a way to "eat the elephant"
• Adopted a Portfolio Management approach commonly used in industry
• Formulated nine (9) quantitative evaluation criteria tied directly to our
goals and findings in PROS plan.
• The JCPRAB brainstormed to develop and assign relative weighting factors to each
item.
• Created quantitative scoring descriptors for each evaluation factor
• Criteria were unanimously supported by board.
• Each project/work item was rated against the criteria (not each other)
• Entire CIP list was then sorted by the overall Benefit/Effort score
Result — ranked priorities, unanimously supported
Quantitative, fair, and balanced
The CIP listing will be reviewed and updated regularly
Capital Improvement Plan
Evaluation Factor Descriptors
Process
Weight Evaluation Factor Descriptors
Benefits
1=Nice to hale
Saves what we have
3 -Needed to present minor deterioration
40%
(factororin grant potential)
9=Mandatory or required to present significant
deterioration
1=Minimal impact
Improves what we hose
3=Moderate impact on utilization or accessibility
20 o %
Complexity and timeline
9=Mandatory(ADA), significant impact on utilization
20%
or accessibility or satisfies a major unmet need
1=Phmady Local Use, limited flexibility
3=Regional attraction, multiple uses
Level and Equity of use
9=Draws out of area users, multiple uses, significant
20%
Human resource needs
improvement of demographic or geographic equity
20%
1=Minimal impact
Ecomomic Benefit
3=Modest impact on local economy
10%
Sustainability
9=Significant economic benefits to local or regional
10%
economy
Health and Safety
1=Minimal impact
(People, Community,
3=Moderate impact to 1 category
10%
Environment)
g=Significant impact to 1 category or moderate
limpact
to 2 or more
Weight
Effort
1=<$15000
OverallNet Project Cost
3=$15000 - $150.000
50%
(factororin grant potential)
9=>$150,000
1=Less than 30 days, no acceptance or permit
obstacles
Complexity and timeline
3=Less than 12 months, minor permit or acceptance
20%
obstacles
9=Greater than 12 months, significant challenges
likely
1=No staff req'd, wlunleer labor secured
Human resource needs
3=Minimal staff req'd, wlunteer labor likely
20%
9=Si nificant staff, volunteer labor unknown
1=08M can be done with volunteer labor and
Sustainability
donations
10%
3=08M less than $500/yr
9=0045001 r, chronic problem
Used objective criteria based on our goals and public input.
Each project was scored against these criteria independently to
derive B/E ratio prioritization.
JCPRAB Parks Tour
• Field check CIP and
riorities and projects
(pboots on the ground)
• Two full days in
September
• Documented and
photographed
• Resulted in minor re-
shuffling
• Additional items were
identified
• Noxious weeds
identified
Unmet Need — Bike Skills Course
• Existing BMX track at HJ Carroll is well used and
needs repair. There is no public skills course in the
area.
• Enterprising teenagers have built a make -shift skills
course in the woods at Chimacum County Park
• Possible volunteer project
• AT has also found a BMX on their property (removed)
I
''Kf �• • .
lip
. _.' k �� ,�� •� � . l!`_9 `...tri
i
4t v �40'
r
-z,Y.- �f • tel`'.
CIP Matrix Summary
The Prioritized CIP Matrix:
• Adds specificity and priorities to the PROS Plan
• Fosters veracity and validity (objective and unbiased)
• Represents unanimous voice of the JCPRAB
• Focuses on importance to community
• Promotes mobilization of staff and volunteers
• Execution is critical to sustainability — Many of the items
are deferred maintenance and repair
Seeking your support, suggestions, participation
and resources
Prioritized CI P —Short Term
Sample of CIP showing the short term efforts for the next 12 months
Location Item Notes I' scope BE Rat Comments' I Timing/Urgenc=r
Quilcene
Shelter
URGENT Roof Leaking,
Replace Roof, Treat
3.14
Request GF Budget Extension
Campground
cavingin
Beetles
Irondale
Toilet
Vol unteer or staff
Pa i nt, re pa i r door
2.75
Community Park
H1 Ca rrol Park
BMX Track
Ideal forvolunteer
Rebuild and or
2.46
Ideal Community Project -facilitate
roup
reconfigure
Possible community workday, Rotary
Chimacum Park
Shelter
Clean, replace roof
2.44
or High School project
orial Field
Quincy St Fence
Friends Project
Replace
2.20
Facilitate the Project with Friends
i
z.1a
Lake Leland
Dock
URGENT
Replace
1.87
Pursue with F&W
Memorial Field
Stadium
Spalling Repair
1.79
Games Room/Rest
Farmers Ma rket rel is nce
Paint, floor, RR
PT Rec Center
1.71
Room
on RR
Dividers,re airs
Quilcene
Safety Light
Contractor
1.60
Campground
12 months
12 months
12 months
12 months
12 months
12 months
12 months
12 months
12 months
12 months
otal of 30 project items in 12 month pan. Most are deferred
repair/maintenance items. Rough cost estimate $780K.
Memorial Field projects account for $615K and PT Rec Center $16K
Repair
Repair
Repair
Repair
Repair
Repair
Repair
Repair
Repair
Improve
ment
10
t
I �\
IIA
r �
Nei
� f - �� f • `Ply -,_. J ` i � �/�/ I
Y
Prioritized CI P — Mid - Term
Sample of CIP showing the mid-term efforts for 2 - 4 years
Location - Item - Notes I - scope BE Ra - Comments � Timing/Urgenc-t:
2-4years
2-4years
2-4years
2 - 4 years
2-4years
2 - 4 years
2-4years
Repair
Improve
ment
Improve
ment
Improve
ment
Improve
ment
Improve
ment
Improve
ment
11
Maybe 4years left on
North Beach
Shelter repair
Replace Roof, Post
4.71
old roof
I rondale Beach
Loop Path
Build and improve
3.71
Apply toRCD in 2016
Pak
park Loop path
Park Partitions and
Replace with Rocks,
North Beach
Parking Lot
Grade and Parking
3.43
Improvements
Stops
Gibbs Lake
Park Specific Signage
Great opportunity
Comprehensiveupdate
2.56
Gibbs Lake
Mountain Bike Park
Mainly OTA, with some
MTB Park in Clear
2,43
JCPRAB Finalize Planning
RCO or other $
Cut Areas
Hl Carrot Park
Playground
Can wait
Replace olderelements
2.14
Indian Island Park
Replace Shelter
SEMI URGENT
Replace
1.86
2-4years
2-4years
2-4years
2 - 4 years
2-4years
2 - 4 years
2-4years
Repair
Improve
ment
Improve
ment
Improve
ment
Improve
ment
Improve
ment
Improve
ment
11
Prioritized CI P — Longer Term
Sample of CIP showing the long-term efforts of > 4 years
Location - Item
Notes - I Scone - BE Rat -
Comments Timing/Urgen
>4 years
Repair
Not Urgent -This Shelter
Replace entire
2.36
North Beach
Sheller
is relatively strong
structure
ment
Improve
>4 years
Install N. Perimeter
This ranking assumes the JEA is
Equestrian Park
Fencing and Trails
JEA
1.77
ment
Improve
>4 years
-Trails
completing the project.
Quilcene
Campground Utilities
Revenue enhancer
Water and Power
1.19
Campground
Equestrian Park
Event Ring and Toilet
JEA
Install
1.14
Postpone until more information
Equestrian Park
Trails
JEA Volunteers needed
Improve existing
1.14
Postpone until more information
Trailhead Park
Single Track
Hikers, Bikers and
1.11
Pursued by Backcountry Horsemen
Improvements
lHorses
>4 years
• Need JEA to take the lead on Equestrian Park projects
• Quilcene Campground upgrade and expansion presents a good RCO Grant
possibility
JEA Project
14
Repair
Improve
>4 years
ment
>4yearsImprove
ment
Improve
>4 years
ment
Improve
>4 years
ment
Improve
>4 years
ment
Improve
ment
• Need JEA to take the lead on Equestrian Park projects
• Quilcene Campground upgrade and expansion presents a good RCO Grant
possibility
JEA Project
14
JCPRAB Priorities
• Short Term Projects
• Quilcene Roof — urgent
• Lake Leland Dock
• Facilitate completion of miscellaneous repair projects
throughout the Park system
• Longer Term Capital Projects
• Quilcene Campground upgrade and expansion
• Irondale Beach Park development
Unanimously approved by the JCPRAB at Nov Meeting
Still need to secure funding
Background Funding Information
• Recession ended the capital improvement program for
parks and recreation and prompted significant cuts to
operating budget. No new grant applications have been
submitted as no match money was available
• Increased reliance on volunteerism (adopt -a -park,
Friends of Jefferson County Parks) and donations
• ERPRC study and subsequent MPD Committee sought
to develop a stable funding source
• Adequate funding is a continuing struggle
-----------------The New Normal------------------
Impact on Parks and Recreation Capital
Improvement Program
• Parks Improvement funds transferred to M and O
• HJ Carroll Park Third Field project canceled, grant money
forfeited, matching funds were utilized for maintenance and
operations
• Staff "Maintenance Improvement Projects" discontinued.
Historical examples:
• Salvaged playground from Indian Island and built new playgrounds
at Quilcene and Irondale Community Parks
• Athletic field treatments incl. heavy sanding and aerating
• Painting and roofing of toilets and picnic shelters
• Annual campground preparations at Quilcene and Lake Leland
• Repairs: fencing, courts, docks, park furniture, soccer and B -Ball
goals
• Assistance in construction of HJ Carroll Park
• Brushing and tree work —all parks
• Surfacing, grading, partitioning parking lots, and trails — all parks
$22000.000
$21 ,000 000
$20.000,000
S19.000000
$18000000
$17000000
$16000000
$15000000
$14,000000
$13000000
yob
a
do ,
P
Historical County Revenue and
Expenditures
GENERAL FUND REVENUES & EXPENDITURES (base budget)
2006 through 2019 (12-1-14)
NOTE: EXCLUDES large extraordinary and one-time revenues and expenditures for years 2009 to 2015
� `C'^ � 'N- 'Y�,o �y,• �„'L ��•`'' �,A �1b �,0 �`'t X10 �^0
Q�d
-MeaRevenup—Expe11WdfM"sessus quo tete to 2019) —Sblue pue from 2a9t1
From Jefferson County Budget Hearing Dec 1, 2014
Revenue and expenses growing at 3% since 2012
Roughly the same as rate of inflation
is
VON
Y 600
500
c
Q. 400
X
W
300
a�
f° 200
11'
7
Parks & Recreation History
Staffing down
33% since
2008
am .-i m Lr)
0 0 .- I ,--I ,--I
0 0 0 0 0
N N N N N
Total Expense Total FTE
109
Foi
W
7
Li -
6 e
m
4"
5 v^
U
4 W
CO
3
Y
L
2 a
Volunteers stepping up to fill the void
• Lagoon Beach toilet repaired and repainted
• New picnic tables at Indian Island — Portage shelter
• Improved drainage and crushed rock on Portage Trail
• New "bumper" logs at Lagoon Beach parking lot
• Improved line of sight at Indian Island entrances
• Mowing at Indian Island, Irondale Beach and Riverside
• Noxious weed removal at Irondale Beach and Riverside
• Expanded trail network at Gibbs Lake
• Preservation of closed toilets at Chimacum and North Beach
• Ongoing trail cleanup and improvement at Indian Island
• Ongoing improvement of Disc Golf course at HJ Carroll
Volunteer work will continue and even expand
but they can't do it all.
Capital Improvements - Grant Funding
Opportunities
• Consultation with AJO Consulting and RCO grant
manager indicated that many projects on our CIP
are too small to successfully compete for RCO
grants.
• RCO recommended that individual work elements
at a common location should be aggregated into a
larger scope project
Quilcene Campground Improvements
Potential RCO Grant Application
• An established and revenue producing campground
• $5K through Nov 2015 ($2,700 over budget)
• Over 400 campsite nights
• Open year around , often full during summer
• Strong demand for campsites in the area
• Adjacent tennis/basketball court currently undergoing a major
improvement through efforts of Quilcene residents
• As envisioned, project would include
• Additional campsites with paved pads
• Power and water hookups to selected campsites
• New septic system and functional bathrooms
• RV dump
• ADA upgrades
May also qualify for rural development assistance
Irondale Beach Park Development
Potential RCO Grant Application
• Currently undergoing a major effort to remove noxious weeds and
restore native plants throughout park
• Proposed project would:
• Implement some of the improvements found in the Master Plan and
Cultural Resources Management Plan to:
• Showcase Native American activity and historical smelter ruins
• Provide Safe and expanded path and trails
• Create and maintain quality beach access
• Improve the user experience through additional park structures and furniture,
and in-depth historical interpretive signage
• Improve compliance with environmental, health and safety standards
• Functional vault toilet or restroom
• Upgraded parking lot and formalized area for hand boat launching to preclude
ancillary beach damage (berms, eel grass)
• Locate and eliminate pollution in Otter Creek which flows through the park
• Pollution coming from outside park boundary
• Possible separate grant with joint submission with County Health
Department
Implementation
• Secure funding for new roof at Quilcene Campground
shelter and other needed maintenance and repairs
• Support staff to pursue Lake Leland Dock with WDFW (Goal
- 100% WDFW funded)
• Continue to foster and grow donors and volunteers
• Research and develop RCO grant application for Quilcene
Campground Expansion
• Research and develop grant application to refurbish
Irondale Beach Park after the Urban Forestry work is
completed in January 2016
This
is
how the
JCPRAB
will
work
to execute
the
plan
Grant
applications
to
be
developed
by
board
members
What we ask of you
• Allocation to partially fund 12 month plan — $50K?
• New roof at Quilcene Campground shelter (^$12K)
• Removal of derelict buildings at Gibbs Lake - $25K
• Remainder for other priority repairs
• Pledge for 10% cash match for Quilcene and
Irondale RCO grants (spending would not occur
until 2017 — 2018)
• Continued support as we work the Implementation
Plan
Need to restore limited but predictable financial support
for parks capital maintenance and improvement