Loading...
HomeMy WebLinkAbout001 16cc ted I'ilu. In the matter of: Temporary Closure of Undie Road, County Road 150009. STATE OF WASHINGTON COUNTY OF JEFFERSON RESOLUTION NO. 01-16 WHEREAS, slide activity has severely damaged the Culvert at MP 1.052, on Undie Road, County Road No. 150009, and WHEREAS, as a potential hazard exists to the motoring public and the construction workers, and WHEREAS, Chapter 47.48 R.C.W. authorizes closure of roads, IT IS HEREBY RESOLVED that said Undie Road be temporarily closed between milepost 1.0 and milepost 1.25 to all traffic, commencing on January 4, 2016 and ceasing on, or before, January 5, 2016. PASSED AND ADOPTED THIS ? DAYOFL &MU / SE z s� ATTEST: �,A*i, Aleh",-,2 Carolyn Avgy Deputy Clerk of the Board JEFFERSON COUNTY =BOARDOFMISSIONERS David Sul an, Chjdr rfMIL6— Phil Johnson, ember Kathleen Kler, Member Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator r From: _ Monte Reinders, Public Works Director / County Engineer Agenda Date: January 4, 2016 Subject: Resolution for Temporary Closure of Undie Road, MP 1.0, County Road No. 150009 Statement of Issue: An emergency repair requires the temporary closure of Undie Road. Analysis/Strategic Goals/Pro's & Con's: Slide activity has severely damaged the roadway and culvert at Undie Road approx. MP 1.1. The culvert is separating at a joint and causing a reoccurring sinkhole in the roadway which requires county road maintenance personnel to monitor and perform daily maintenance to keep it from becoming a hazard to motorists. In a continued effort to keep the road open, Public Works will remove the existing culvert and replace it with a continuous, solid steel pipe which will not separate or deform under the landslide forces. The installation will require temporary closure of the road. There are 16 private parcels beyond the culvert and no alternative access. The road will be closed to vehicular traffic from approximately 8:00 am, January 4, 2016 until approximately 5:00 pm, January 5, 2016 but will reopen sooner if work is completed. Pedestrian access will be provided through the site. Advanced notification signs were installed 5 days in advance. Fiscal Impact/Cost Benefit Analysis: The passing of a Resolution for Temporary Road Closure does not in itself require spending of funds above the costs included in the project. Recommendation: The Board is requested to execute the attached Resolution for Temporary Road Closure and return a copy to Public Works for further processing. Department Contact: Eric Kuzma, Engineering Services Manager, (360) 385-9167 Reviewed By: —hi lip Morle lo u n t yAdmints6ator Date