HomeMy WebLinkAbout011916_ca02Department of Public Works
O Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, Public Works Director/County Engineer
Agenda Date: January 19, 2016 �I
Subject: Project Prospectus for the Washington State Dept. of
Transportation (WSDOT), Access Preservation: Upper Hoh Road MP
6.95, Olympic National Park, CR1896, Federal Aid Project No.
PLH-A160(001)
Statement of Issue: The attached Project Prospectus update is necessary in order to
proceed with construction of the Access Preservation: Upper Hoh Road MP 6.95
Culvert Replacement.
Analysis/Strategic Goals/Pro's Et Con's: Jefferson County has been awarded Federal
funding through the Public Lands Highways Discretionary (PLHD) Program. The
proposed culvert replacement project at Upper Hoh Road MP 6.95 is necessary to
maintain reliable access for resident, business and Olympic National Park visitor use.
The culvert will be replaced with a 20 ft. span three -sided concrete box culvert.
Work will also include raising and reconstructing 800 lineal feet of the roadway over
the new culvert.
Fiscal Impact/Cost Benefit Analysis: There is no fiscal impact associated with this
Project Prospectus. This project is funded at 100% by the Federal Highway
Administration.
Recommendation: The Board is requested to sign the three originals of the Project
Prospectus, and return to Public Works.
Department Contact: Mark Thurston, P.E., Project Manager, 385-9160.
vi By,
Philip MoI , Cou Admin' for Date
��state
wI/ of ThilwnpoKaition
Local AgenUtTederal Aid
Project Prospectus
DOT Form 140-101 ♦ Previous Editions Obsolete
Revised 04/2015 Page 1
Date
1/11/2016
Prefix Route
Federal Aid
PromectNumberPLH-A160(001)
A160
DUNS Number
179278197
Local Agency
WSDOT
Federal Employer
Pro'ect Number
18018960
(use Only)
Tax ID Number
91-6001322
Agency
CA Agency
Federal Program Title
Jefferson County Public Works
® Yes ❑ No
® 20.205 ❑ Other
Project Title
Start Latitude N47-49-26
Start Longitude W124-12-20
Access Preservation: Hoh Rain Forest, Olympic National Park
End Latitude N47-49-00
End Lo798331-9454 de W124-07-45
Project Termini From - To
Nearest City Name
Project Zip Code (+ 4)
Upper Hoh Rd MP 3.2 Upper Hoh Rd MP 6.95
Forks
Begin Mile Post
End Mile Post
Length of Project
Award Type
MP 3.2
MP 6.95
3.75
® Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
1
914207
MP 3.2
MP 6.95
N/A
16
Jefferson
WSDOT Region
Legislative District(s)
1
Congressional District(s)
Urban Area Number
1
Olympic Re ion
24
6
N/A
Phase
Total
Estimated Cost
Local Agency
Funding
Federal Funds
Phase Start
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
$690,799
$690,799
10/2011
R/W
$35,000
$35,000
8/2013
Const.
$1,714908
$1,714,908
3/2016
Total
$2 40,707
$35000
$2,405,707
Description of Existing Facility (Existing Design and Present Condition
Roadway Width
Number of Lanes
22 feet
2
The existing roadway is a paved, two-lane major collector with 35 mph posted speed. The project is separated into three project
sites, Upper Hoh Rd MP 3.338, MP 4.38, and MP 6.95. Culvert replacement at Upper Hoh Rd MP 3.338 was completed in 2015.
Substandard culverts at MP 4.38 and MP 6.95 perennially cause road damage and are in need of replacement.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Culvert replacement at Upper Hoh Rd MP 3.338 was completed in 2015. Preliminary Engineering previously obligated for all
three sites under one project. The project is now separated into three project sites, with separate STIP ID#s for RW and CN only.
Remaining work consists of culvert replacements at Upper Hoh Road MP 4.38 and MP 6.95.
This update reflects Phase 2 construction at MP 6.95. The estimated ad date is February 22, 2016. The estimated construction
amount for this phase is $981,343.
Local Agency Contact Person
Title
Phone
Monte Reinders P.E.
Public Works Director/Cour Engineer
360-385-9160
Mailing Address I
City
State
Zip Code
623 Sheridan Street
ownse
WA
98368
By
Project Prospectus Approval l ApprO11
Title Public Works Director/County Engineer Date I-// (,
DOT Form 140-101 ♦ Previous Editions Obsolete
Revised 04/2015 Page 1
Agency Project Title Date
Jefferson County Public Works Access Preservation: Hoh Rain Forest, Olympic 1/11/2016
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width Number of Lanes
❑ New Construction ❑ Path / Trail ❑ 3-R
Consultant/Agency
❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R
22 feet 2
❑ Railroad ❑ Parking ❑ Other
Contract I Agency
® Bridge
Federal
Functional
Classification
Geometric Design Data
Preliminary Engineering Will Be Performed By
Others
Agency
Consultant/Agency
Description
25 %
Through Route
Contract I Agency
Crossroad
Federal
Functional
Classification
❑ Urban
® Rural
El
❑ Principal Arterial
❑ Minor Arterial
❑ Collector
® Major Collector
El Minor Collector
❑ Local Access
❑ Urban
❑ Rural
NHS
❑ Principal Arterial
❑ Minor Arterial
❑ Collector
[I Major Collector
❑ Minor Collector
❑ Local Access
Terrain
❑ Flat
35
® Roll ❑ Mountain
❑ Flat
❑ Roll ❑ Mountain
Posted Speed
Design Speed
35
Existing ADT
550
Design Year ADT
675
Design Year
2032
Design Hourly Volume (DHV)
70
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
Consultant/Agency
75 %
25 %
Construction Will Be Performed By
Contract I Agency
Contractor
100 % %
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ® Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ® Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
Environmental Considerations
No comments
DOT Form 140 ♦ Previous Editions Obsolete ♦ Page 2
Revised 04/24/2015
Agency
Jefferson County Public Works
Project Title Date
Access Preservation: Hoh Rain Forest, Olympic 1/11/2016
Right of Way
❑ No Right of Way Needed ® Right of Way Needed
' All construction required by the ® No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities Railroad
❑ No utility work required ❑ No railroad work required
® All utility work will be completed prior to the start of the ❑ All railroad work will be completed prior to the start of the
construction contract construction contract
❑ All utility work will be completed in coordination with the ❑ All railroad work will be completed in coordination with the
construction contract construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Temporary relocation of utilities prior to construction, and reinstallation following construction may be necessary.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ® No
Remarks
No comments
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and
is not inconsistent with the agency's comprehensive plan for community development.
Date
Agency
By
Mayor/Chairperson
DOT Form 140-101 EF
Revised 04/2015 ♦ Previous Editions Obsolete ♦ Page 3