HomeMy WebLinkAbout041816_ca07Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engine Agenda Date: April 18, 2016 Subject: Change Order No. 2 with Bruch and Bruch Construction, Inc. Undie Road MP 1.1 Emergency Repair, County Project No. X01990 County Road No.150009 Statement of Issue: Change Order No. 2 with Bruch and Bruch Construction, Inc. of Port Angeles, Washington for the above referenced project. Analysis/Strategic Goals/Pro's 8t Con's: Slide activity continues to cause damage to Undie Road in the vicinity of milepost 1.1. Emergency repairs were completed in January and February to replace two culverts and perform road realignment. The road has continued to settle and crack, requiring daily monitoring and maintenance to preserve access through the site. This contract is for additional road realignment work, necessitated by the ongoing slide activity. Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 2 is $35,000, which will increase the total contract amount to $144,000. This will be funded by the County Road Fund, with the possibility of funding assistance from FEMA (75%) and Washington State (12.5%). Recommendation: Public Works recommends that the Board execute all three originals of Change Order No. 2 with Bruch and Bruch Construction, Inc. and return two originals to Public Works. Department Contact: Mark Thurston, P.E., Project Manager, 385-9217. Reviewed By: Hip 0r y, Cdunt inistrator � - 11-4 4e Date JEFFERSON COUNTY Sheet 1 of 1 DEPARTMENT OF PUBLIC WORKS Date: 4/5/2016 CHANGE ORDER NO.2 Ordered by County Engineer under terms of aSection I - 04. 4 of the Standard Specifications Change proposed by Contractor To: Bruch & Bruch Construction, Inc. 1706 W. Highway 101 Endorsed by: Bruch & Bruch Construction, Inc. Port Angeles, WA. 98363 Conlraelor Firm Name IISignature ' ^ A U V 1 Project Title: Dtle Consent given by Surety: (when required) Contract No. X01990 By: Undie Road, M.P. 1.1 Emergency Repair Attorney-in fact This Change Order adds an amount for additional vertical and horizontal realignment of Undie Road in response to ongoing landslide activity at Undie Road MP 1.1. This contract is revised as follows: • This Change Order adds $35,000 to the contract amount for additional road repair work completed 3/29/2016 through 4/1/2016. Proj. Manager ORIGINAL CURRENT Approval required CONTRACT CONTRACT ESTIMATED NET ESTIMATED CONTRACT AMOUNT AMOUNT CHANGE THIS ORDER TOTAL AFTER CHANGE IA I County Engineer $55,000.00 5109,000.00 $35,000.00 $144,000.00 Approval Required ORIGINAL CURRENT Change in contract time New Contract time CONTRACT TIME CONTRACT TIME this Change Order (Working days) (Working Days) (Working Days) (Working Days) N/A N/A N/A N/A APPROVAL RECOMMENDED APPROV Project Manager Date County Engineer Date AP O L RECOMMENDED At APPROVED 4 01� I Engi eri Services Manager Date Chair, Jefferson County Commissioners Date FIELD NOTE RECORD ! ! UNDIE ROAD MP 1.1 - -' PROJECT NO. X01990 Date Prepared: 4/5/16 Prepared by: Mark Thurston QUANTITY! UNIT RATE ! TOTAL -- 29 -Marl 30 -Marl 31 -Mar 1-Aprl EQUIPMENT #26 Kobelco 150 Excavator j 1 5 1 j 7.00 HR $118.00 $826.00 Truck and trailer/Sidedump 81 40I 32 251 105.00 I HR I $120.00 1 $12,600.00 Truck and trailer/Sidedump (O.T.) 10.51 5.51 2 18.00 1 HR $140.00 $2,520.00 Solo Dump 0.00 1 HR 1 $105.00 $0.00 Solo Dump (O.T.) 0.00 1 HR $120.00 $0.00 #7L Lowboy 1 ! 0.00 HR j $145:00 $0.00 #25 Cat 330 BL Excavator j 0.00 HR $145.00 $0.00 #44 JD750 Dozer 81 3 41 15.00 HR 1 $115.00 1 $1,725.00 #44 JD750 Dozer (O.T.) I 1.51 2.51 4.00 HR 1 $140.00 1 $560.00 Cat CS -563 Roller 0.00 HR 1 $98.00 $0.00 Operator (Rental Machine) 1 1 0.00 HR r $69.00 $0:00 Shop Truck w/ mechanic 1 1 0.00 HR $115.00 1 $0.00 Pilot Car 1 0.00 HR $75.00 I $0.00 Self loader 1 I 0.00 HR $135.00 $0:00 Shop Labor/Shop Truck 1 0.00 HR $125.00 $0.00 Total Equipmentl $18,231.00 I I I I I I I I LABOR Foreman 1 11 1.00 HR $95.00 $95.00 Foreman (O.T.) _ 0.00 HR 1 $125.00 $0.00 General Labor 8; 61 1 14.00 1 HR 1 $56.00 1 $784.00 General Labor (O.T.) 1 1 2.5' 1 1 2.50 1 HR $77.50 1 $193.75 I l Total Laborl $1,072.75 I CONTRACTOR -SUPPLIED MATERIALS I 1 2" minus (Snider Quart') 624.49' 367.061 305.981 1,297.53 1 TON $8.00 $10,380.24 Quarry Spalls (Snider Quarry) 1 187.55, 249.121 1 436.67 j TON 1 $9.00 1 $3,930.03 1 1 1 1 1 Subtotal 1 $14,310.27 Tax @ 9.01Y, Total Contractor -Supplied Materialsl $15,598.19 _- I OTHER �I I I I I I I I I GRAND TOTAL= $34,901.94 I I I I ! I I I