Loading...
HomeMy WebLinkAbout052316_ca03Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E4,L-- Public Works Direct / County Engineer Agenda Date: May 23, 2016 Subject: Supplemental Agreement for Consultant Services with Shearer Design LLC for Salmon Creek Bridge Construction, West Uncas Road, County Project No. 18019341 Statement of Issue: Public Works requests a modification of the scope of work, budget, and time for completion in the agreement with Shearer Design, LLC. Analysis/Strategic Goals/Pro's Et Con's: The culvert at West Uncas Road MP 0.804 has been a chronic fish passage problem requiring yearly maintenance for over 5 years. Should this culvert fail it will significantly impact the substantial restoration work that has been completed to the north where Salmon Creek joins South Discovery Bay. This supplement to the agreement with Shearer Design LLC is for design modifications required by the Washington State Dept. of Fish and Wildlife. Fiscal Impact/Cost Benefit Analysis: The maximum amount payable for this supplement is $26,739. The maximum amount payable for the Shearer Design agreement will increase from $76,241 to $102,980. This project is funded at 85% by a Recreation and Conservation Office (RCO) Salmon Recovery Funding Board grant. Remaining funding will be through a combination of a U.S. Fish and Wildlife Service National Fish Passage Program grant, and local funds. Recommendation: The Board is asked to execute the three (3) originals of the Supplemental Agreement with Shearer Design, and return (2) signed originals to Public Works. Department Contact: Mark Thurston, P. E., Project Manager, (360) 385-9210. Reviewe rediiPhilip Moly,CoAmnstr Date The County of Jefferson, State of Washington, desires to supplement the agreement entered into with Shearer Design LLC and executed on October 27, 2014 and identified as: 14-1021P All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: II Section II, SCOPE OF WORK, shall be amended by supplementing Task No. 2 — PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E), Task No. 4 — HYDRAULIC ANALYSIS, and Task No. 6 — LOAD RATING. The revised scope of work under Task Numbers 2, 4, and 6 are set forth in the attached Exhibit A, and by this reference made a part of this supplement. IV Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended to establish a new contract completion date. The previous contract completion date was 12/31/16. The new contract completion date is 12/31/18. 11 Section V, PAYMENT, shall be amended as follows: Task No. 2, PLANS, SPECIFICATIONS, AND ESTIMATE will have a new maximum amount payable of $48,909. Task No. 4, HYDRAULIC ANALYSIS will have a new maximum amount payable of $20,847. Task No. 6, LOAD RATING will have a new maximum amount payable of $12,799. The new, total maximum amount payable for the Agreement will be $102,980, as shown below. West Uncas Road Page 1 of 3 Revised 1/2016 Supplemental Agreement No. 1 Organization and Address: Supplemental Agreement Shearer Design LLC Number 1 613 Phinney Ave N. #A Seattle, WA 98103 hone: (206) 781-7830 Agreement Number: 14-1021P Project Number: 18019341 Execution Date: Completion Date: October 27, 2014 December 31, 2018 Project Title: New Maximum Amount Payable: Salmon Creek Bridge Construction, West Uncas Road $102,980 Description of Work: Amend the current PS&E per the RCO technical review panel comments so as to accommodate a 24 ft natural ankfull width. Supplement also establishes a new contract completion date due to a delay attributable to the gency. The County of Jefferson, State of Washington, desires to supplement the agreement entered into with Shearer Design LLC and executed on October 27, 2014 and identified as: 14-1021P All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: II Section II, SCOPE OF WORK, shall be amended by supplementing Task No. 2 — PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E), Task No. 4 — HYDRAULIC ANALYSIS, and Task No. 6 — LOAD RATING. The revised scope of work under Task Numbers 2, 4, and 6 are set forth in the attached Exhibit A, and by this reference made a part of this supplement. IV Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended to establish a new contract completion date. The previous contract completion date was 12/31/16. The new contract completion date is 12/31/18. 11 Section V, PAYMENT, shall be amended as follows: Task No. 2, PLANS, SPECIFICATIONS, AND ESTIMATE will have a new maximum amount payable of $48,909. Task No. 4, HYDRAULIC ANALYSIS will have a new maximum amount payable of $20,847. Task No. 6, LOAD RATING will have a new maximum amount payable of $12,799. The new, total maximum amount payable for the Agreement will be $102,980, as shown below. West Uncas Road Page 1 of 3 Revised 1/2016 Supplemental Agreement No. 1 Task No. Task Description Original Maximum Amount Payable Supplement #1 New Maximum Amount Payable 1 Project Management $5,948.00 $0.00 $5,948.00 2 Plans, Specifications, & Est. $29,919.00 $18,990.00 $48,909.00 3 Environmental Services $0.00 $0.00 $0.00 4 Hydraulic Analysis $17,898.00 $2,949.00 $20,847.00 5 Geotechnical Analysis $14,477.00 $0.00 $14,477.00 6 Load Rating $7,999.00 $4,800.00 $12,799.00 TOTAL $76,241.00 $26,739.00 $102,980.00 West Uncas Road Page 2 of 3 Revised 1/2016 Supplemental Agreement No. 1 If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. 4OKLIM2.11), �DF S%6p Consultant Consultant's Signature 51�1r� Date COUNTY OF JEFFERSON BOARD OF COMMISSIONERS Kathleen Kler, Chair Phil Johnson, Member David W. Sullivan, Member pproved as to fVrm only: David Alvarez 0 Date Deputy Prosecuting Attorney E. at Public Works Director/County Engineer West Uncas Road Page 3 of 3 Revised 1/2016 Supplemental Agreement No. 1 EXHIBIT A SUPPLEMENT NO. 1 -- SCOPE OF WORK Salmon Creek Bridge West Uncas Road, Milepost 0.804 The objective of this Agreement is to provide professional services necessary for the preparation of reports, plans, specifications, and estimates (PS&E) for the construction of replacement of the culvert at West Uncas Road milepost 0.804, in unincorporated Jefferson County, Washington. The current PS&E set will be modified via this supplement to redesign the channel bed width under the bridge to a 24 ft natural bankfull width for permit submission and implementation. TASK 2 - PLANS. SPECIFICATIONS AND ESTIMATE (PS&E) The focus of this task will be modification of the current PS&E to provide a 24 foot natural bankfull stream width. Several options will be evaluated to arrive at the best solution in regards to project overall cost, impact to adjacent properties, constructability and habitat impacts. A summary letter stating the preferred option will be provided to the County. 2.1 Structural Design This scope of work is based on the CONSULTANT performing the structural engineering analysis necessary to provide road and structure plans for the modified stream width. Deliverables: A. Revised PS&E for the West Uncas Road, Salmon Creek Bridge B. Preferred option summary letter. TASK 4 - HYDRAULIC ANALYSIS The general focus of this task will be to modify and reissue the existing hydraulic report for the project to reflect comments provided by the RCO Salmon Recovery Funding Board. Deliverables: A. Revised Hydraulic Report TASK 6 — LOAD RATING Replenish funds for this task, used as previously documented to cover coordination with the RCO Salmon Recovery Funding Board review. Page 1 of 1 Project Consultant Date COMPENSATION West Uncas Road / Salmon Creek Culvert Replacement .Shearer Design LLC $18,984.60 $26,733.40 COMPENSATION Project Consultant Date COMPENSATION West Uncas Road / Salmon Creek Culvert Replacement Shearer Design LLC 11/11/15' — — Principal Proi. Engineer Cad Clerical Shearer, S.E. Pruitt Task 4 Hydraulic Analysis Stream Width Review 1 4� -------- - ---------- ------ - �. Sub Totals 1 4' Billing Rates $132.00 $79.20 $7S 132.00 316.80 ( Indirect Cost Mileage 0 0.54 $ Expense Total $ Subconsultant Watershed Science $2,500.00 oum totals uirect baiary cost $448.80 -- 1 Sub Total Labor A $448.80 Expenses P I _ _ _ B $0.00 Subconsultants C $2,500.00 Total A+B+C12,948.80