Loading...
HomeMy WebLinkAboutMLA16-00029-FPA16-00002 Jablonski Release of FPA Moratorium ApplicationgON COG'L DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 sonFax.wa.usLco 491 f r� -� $ Web:www.cooJeffesonmus/communlwdevelGoment -�L� ��� LE .q p E-mail: dcdraco.iefferson.wa.us 1 � D SHI NG't RELEASE OF MORATORIUM FOR A SINGLE-FAMII ,Y MJI! 2016 (Subject to Forest Practices Act) -- r�.re9;U: auNtt r n r„ .nP.• art F �r. lx Purpose --= A property owner subject to the 6-year moratorium provisions of the Forest Practices Act can wait until the required time period expires for the forest conversion application, or apply to have the development moratorium released. The moratorium may be lifted only if the person requesting the release did not attempt to avoid County review or restrictions of a conversion forest practices application as evidenced by a transfer of property. The Administrator of the Jefferson County Department of Community Development may 'Release" the Development Moratorium for the construction of one (1) single -family residence (including an accessory dwelling unit, where allowed) and related accessory buildings on a legal lot of record. Applicants for a 'Release" from the moratorium must fill out a Master Permit Application form in addition to the supplemental moratorium release application form in this handout. The Jefferson County Code can be accessed at www.co.jeffemon.wa.us/cemmdevelopment. Process At least ten (10) days prior to taking action on an application for Release from Moratorium, and following a Type II procedure, the Administrator shall solicit comments from the following: a. Property owners of record within three hundred (300) feet of the subject property within an urban growth area or within five hundred (500) feet of the subject property if outside of an urban growth area; It. Appropriate state departments such as Ecology, Natural Resources and Fish and Wildlife; and C. Appropriate tribal governments; and d. Other interested parties requesting such permit information. Criteria The Administrator may authorize, conditionally authorize, or deny a release application. A Release of a Development Moratorium is subject to the following findings: The person requesting the release did not attempt to avoid the County review or restrictions of a conversion forest practices application; Environmentally sensitive areas and their buffers, and shoreline area as set forth in the Jefferson County Jefferson County Code (JCC) and Shoreline Master Program were not damaged in the forest practice operation, or that any such damage is repairable with restoration; and Corrective action can be undertaken to provide for compliance with applicable conversion standards established by the JCC. Upon request of the property owner, the moratorium may be rescinded by the Administrator if an approved forest practices application has been either withdrawn or expired, and no harvest in reliance upon such approval has taken place. Evidence that the harvest has not taken place, in the form of a letter from the Department of Natural Resources, shall be submitted by the applicant before release of moratorium G\P—,C..ORMSW RMT. PermilaMwetonun e,FINALtloc REV 1'=Y 015 4goN cow°� DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.44501 Fax: 360.379.4451 Web: www co leffemon wa us/comm nitvd looment gsxt E-mail: dcdOco.iefferson wa us NG Supplemental Application for FPA Release of Moratorium for A Single -Family Home MiA#�14—UlJO4� PROJECT/APPLICANT NAME: ��LLN5KI �,tnda�Ro hoW The following questions must be answered completely. If additional space is needed, attach extra pages to the application. (Refer to 18.20.160(5)(c) of the Jefferson County Code for the release of moratorium findings that apply.) 1. Describe the sequence of events leading up to and including the issuance of the forest practices permit. Please note when you acquired the property. UtCWbe'x.015 gold f44" 7tus#- saki ipo� N h (Marland Rcsourtcs wL �� wv, CWflard Rcwoccs bloWt ad ferm i- I lcrjycd rroll 3-16 1olb Rltn.In j Ran &bWr'iKi FW"Sul r"ftCltl ko, C40Lr104,d l4soura5 2. Describe any harvest activities and that occurred within Environmentally Sensitive Areas (such as wetlands and steep slopes) or within 200 feet of a shoreline area. NOhV 3. Indicate what types of mitigation is planned for each Environmentally Sensitive Area, Shoreline Area and their buffers which have been damaged in the forest practice operation. MIA 4. Describe any other measures which will be taken to comply with the conversion standards contained in J( 18.20.160(7)(c). Cedaxland Re%uras dear/,{- +lW 5-wm foufiA wi+i oto 4, bcnO4 of c� CVHP, tkus pb49 4{ o rf ntU in a 6-4w dwlopmmn tnoroaibrl(,tvh jf is aur in} jop fib Coh4rtuCf- 0. S11f- iavnilU YGSiGkncG an One, aCrY a roflau% +hG rcwlaininq � 0.cro5 in native -Hm6cr ffc6es. G W"mdc6nreM1 0RMSWDRDWM P«ItMmo�wm �_rlNAL don Rev.+arznaou Page Vicinity Maq. %,'/ Locate the property on alarge-scale map or the appropriate page or portion of a county map. HarvestedA Map (APPLICMTTO CHECK OFFAS COMPLETED) �ch orth arrow. ben Pity feet to the (�eH l t two hundred (200) feet to the ap scale which shall an (50) ch and interval aetieyaCttlYYh}an pv using a standard engineer scale. �8,.t�r )tp I KGII. 'sting forested areas and areas harvested. / A A Areas which were stumped and graded. Existing roads, proposed roads and landings, and any structures. ,/ ry 11 Forested blocks for future harvest(s) or conversions. n. ❑ Environmentally Sensitive Areas (i.e., wetlands, ponds, streams, seasonal drainages, steep slopes, marine bluffs, lw ❑ 14 and special habitats). Shoreline Areas (i.e., within 200 feet of a marine or river shoreline). IVA ❑/ Contiguous property also owned by the property owner or applicant. Lines shall be drawn with a straightedge and features shall be to scale. Drawing shall be sufficiently clear to see footprint of structures and other features described above. MAR 2 4 2016 J e%PmmltC teN ORMa ORDrTMe Permits\mo nomepp_riRAr.dmo REV iMrz 15 Paget m