HomeMy WebLinkAbout1.0 Kalaloch Project DescriptionKalaloch Cabins Project
Project Description
Background
Project Location
The property is currently known as SeaCrest and is developed with 2 cabins currently used as
vacation rentals. The property is approximately 23.52 acres and split into 5 separate parcels
(APN: 413273006, 413273002, 413273007, 413273004, and 413273005.) The property is
located within the Undesignated Rural Residential zone within Jefferson County’s West End
Planning Area (WEPA) and within the Quinault Indian Nation’s reservation. The property is just
North of the Queets River and approximately one half mile South of the Olympic National Park
boundary. The property is also bordered by the Pacific Ocean to the West. Highway 101 runs
North and South and bisects the property.
Existing site conditions
East of Highway 101
The portion of the property East of Highway 101 is approximately 4.11 acres and is relatively flat
at approximately the same elevation as the highway. The site is mostly cleared with gravel
placed over most of the property. The property is accessed directly from Highway 101 at its
North end.
West of Highway 101
The western portion of the property is split into 3 unique areas. 1) The portion furthest to the
West is along the ocean and relatively flat and rocky with a significant amount of ocean debris
such as logs. Within this area there is a relatively large wetland. 2) On the eastern boundary of
the wetland there is a steep, treed slope that extends North and South from one end of the
property to the other. 3) The top of the slope is approximately 80 ft in elevation. The portion of
the property between the top of slope and Highway 101 is relatively long (North and South) and
narrow (East and West). See the site plan in Appendix A.
The portion of the property between the top of the slope and the highway is partially developed
with 2 small cabins (one cabins is 702 square feet and the other cabin is 600 square feet). The
cabins each have dedicated septic tank (2 total) and a shared leach field. There is also a shared
propane tank for heating and cooking. Access to the existing cabins is off Highway 101 towards
the North end of the property. A private gravel drive provides internal circulation.
Previous Development Efforts
. At one point there was an effort made to develop the site into an RV park or camp ground.
Portions of the property were partially cleared for camp sites and access to the sites. The
existing well and electrical infrastructure seems to have been sized to meet the demand of the
full build out of the property.
Proposed Project
Overview
The goal of the proposed project is to build 24 additional 1 bedroom luxury cabins for public use
as short term rentals. The cabins will be built off site and set on the bluff between the top of
slope and Highway 101. A preliminary site plan has been created with a goal of providing the
best view possible from each cabin while impacting the property as little as possible. Existing
conditions have been thoughtfully considered in the site plan development.
Zoning
The proposed project will still be zoned Rural Residential with a designation as a small-scale
recreational and tourist uses per JCC section 18.20.350.1q.
Parking and Access
The natural topography of the site and the locations of the existing access roads were
considered when determining the locations of the proposed access roads and parking areas.
The existing roads and clearings will continue to be used for vehicle access. Instead of
providing vehicle access at each cabin, there is a paved pedestrian path that connects clustered
parking areas and the proposed cabins. The path also connects each cabin and provides
access to each fire pit.
The existing access point from Highway 101 is paved and provides for 2way traffic. The
asphalt entrance transitions into a single lane, private gravel drive with turnouts and additional
driveways approximately 150 ft apart. The existing gravel roads will be utilized to minimize the
impacts to the property and minimize the total impervious area required for the proposed
project.
Parking spaces for the proposed cabins will be provided in or adjacent to existing clearings and
along the existing gravel private drive. There is a ratio of 1 parking spot per cabin (assigning
parking spaces is under consideration by the applicant) and will be located along the driveways
with additional overflow parking spaces along the main drive. The additional overflow parking
spaces increase the total parking ratio to 1.5 parking spaces per cabin.
Cabins
The proposed cabins are all 1-bedroomenergy-efficient luxury cabins. To minimize construction
impacts, the cabins will be built-off site and placed onto foundations. Each cabin will also have
a bathroom, small kitchen and a small living space. There will be two types of cabins. One type
of cabin will be slightly larger and will be at grade with a 10 foot deck extending into the slope
setback. The other type of cabin will be smaller and some will be elevated up to 5 feet off the
ground to provide a “tree house” feel and maximize the view potential. These cabins will also
have decks. The total cabin square footage (existing and proposed cabins combined will
remain under the 12,000 square foot threshold imposed by the code.).
The cabins have been placed in a way to minimize the clearing of mature trees and placed
within existing clearings, when possible. The use of pier foundations will also minimize the
impact to trees and other vegetation by reducing the required earthwork. Pier foundations will
be drilled with an auger. The hole for each pier will be approximately 16 inches in diameter and
5 feet deep.
Utilities
Underground utilities will be installed within the limits of the existing private gravel drives and
driveways and new pedestrian path whenever possible and will comply with separation
standards set by the IBC, State of Washington and Jefferson County. Existing utilities will be
utilized as much as possible to minimize construction impacts and ground and vegetation
disturbance.
Electrical
Electrical infrastructure has already been installed for the site and it is believed the electrical
infrastructure is adequate for the proposed project. This assumption will require verification
through the design process. Each cabin will receive electrical power through underground
trenching and conduits.
Water
The water quality and quantity produced by the existing well was tested and the results show
the well is adequate for the project. A report has been prepared showing the findings of the well
test and establishes that the project will remain below the 5,000 gallons per-day maximum
usage threshold. (The report is attached as Appendix E). A water storage tank will be required
for fire storage and water quality reasons and to provide a buffer for any peak demands
(ensuring that the project will stay below a 5,000 gallon maximum draw in any given day). Each
cabin will have a dedicated water service.
Sewer
A site investigation was conducted by Zenovic and Associates. It was determined by their team
of engineers that a series of septic tanks and a common leach field is the best option for this
property and project. The entire bluff section has approximately 6 feet of a top layer that is
unsuitable for a leach field; accordingly, the southern portion of the property is the best location
for the leach field. In this area, the applicant proposes to remove the top 6 feet of soil and
replace with sand. (A narrative has been supplied by the septic designer, Zenovic and
Associates, and included in Appendix F).
Gas
It is the applicant’s understanding the current cabins use propane as the primary source for
heating and cooking. The applicant proposes to continue to use propane for heating and
cooking in the existing cabins. The applicant is considering propane for the remaining cabins as
well and will be compared to electrical heat and cooking options.
Storm Water
Added impervious area has been minimized through use of the existing private gravel drive and
driveways. New impervious area will include the additional cabins and gravel parking stalls, the
pedestrian path. Additionally, each cabin will include a splash pad to minimize erosion. A
preliminary grading and drainage plan has been prepared as part of the preliminary site plan.
The preliminary plan (Sheet 4 in Appendix A) shows 8,500 cubic feet of additional storage will
be required to contain a 2 year, twenty-four hour rain event. The applicant plans to contain this
additional runoff in swales adjacent to the access roads. (Additional storm water information can
be found in Appendix H.)