HomeMy WebLinkAboutBLD1995-00063 `� _—. Jefferson County Pen it Center October 17, 1994
621 Sheridan
Port Townsend WA 98368
(206) 385-4463
FINDINGS AND CONDITIONS OF APPROVAL
AS REQUIRED UNDER THE
JEFFERSON COUNTY INTERIM CRITICAL AREAS ORDINANCE
Critical Area Review Case No: CAR94-0120
Date Received: 09/16/94
j Applicant : BOB & NORA MILLS
`t Mailing Addr: 7381 OAK BAY RD
I PORT LUDLOW WA 98376
Project Description: Septic
Site Address: 124 VAN TROJAN RD
CHIMACUM, WA
Legal Description: Subdivision
Block Lot
S-T"R: 15-29-01 W Parcel # 901154011
FINDINGS^
In accor ace with the authority provided under subsection
4. 101 and he requirement contained in Subsection 5. 402 of the
Jefferson ounty Interim Critical Areas Ordinance, the Critical
Areas Admi istrator enters the following findings of fact
relating to the referenced application:
1) The application was reviewed by Jefferson County Permit
Center staff on 9/26/94 for the potential presence of critical
areas regulated under the provisions of the Ordinance, and the
following critical areas were confirmed as potentially present
on the subject property: fish and wildlife habitat area.
2) Acting upon the above information, Jefferson County staff
conducted a site inspection of the subject property on 9/26/94
and confirmed the existence of the following critical areas
and/or their associated buffers on the property: fish and
wildlife habitat area (Type 3 fish bearing stream) .
3) Staff visit to site on 9/26/94 found that a Type 3 stream
does exist on subject property. Stream remains heavily
vegetated with overstory of mature trees. Applicant's proposed
septic project lies well outside of the required 25 foot buffer
along a Type 3 stream.
This waiver from the provisions of the Jefferson County
Interim Critical Areas Ordinance is granted subject to the
applicant complying with the following conditions. Any
deviation from these conditions shall result in this waiver
CAR94-0120
- being revoked by the Critical Area Administrator and the
application becoming subject to further review under the
Interim Critical Areas Ordinance. Please sign and return to
the Permit Center.
•
•
CAR94-0120
Page: 3 _
• CAR94-0120
BOB & NORA MILLS
CONDITIONS OF APPROVAL
1 ) Fish and wildlife habitat area buffers shall remain
Vegetated. Should buffer disturbance occur during construction,
replanting with native vegetation shall be re naturally
Area Administrator.
required by the Critical
2) No alteration shall be made to the fish and wildlife
area buffer (measured perpendicularly habitatn
feet on each side) without from the
Administrator. prior by authorization top of the bank - 25
the Critical Area
3) The proposed development shall be located on the subject
property exactly as identified on the Universal Plot Plan,
Site Plan, approved by
application. the County as part of the triggering opermitr
s
K n An rso , Criti Areas Administrator D 0 � `
at
I understand that the granting of the above waiver from the
provisions of the Jefferson County Interim Critical Areas
Ordinance is made s
conditions, and that bany tviolao tionmofy said ing wcoh the above listed
result in revocation of thepermit or approval
and conditions shall
review t.q pproval and further
� 9444eg,project under the
it cent6r4)
t�' , . 4sz @ ,, itical, Areas Ordinance.
Applicant 57'
Date
CAR94-0120