Loading...
HomeMy WebLinkAboutBLD2006-00411 - CANCELLED „„ • BUILDING PERMIT • Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD06-00411 Received Date 07/18/2006 SITE ADDRESS: 694 SUGAR HILL RD Issue Date 08/29/2006 CHIMACUM, 98325 APPLICANT: JODY MAGER RODERICK MAGER PHONE: 360-344-3105 PO BOX 985 CHIMACUM WA 98325 SUBDIVISION: SUGAR HILL ESTATES Block: PARCEL NUMBER: 901135003 Section: 13 Township: Lot: 3-4+ 29 N Range: 01 W CONTRACTOR: OWNER/BUILDER PHONE: — 'fie PROJECT DESCRIPTION: CONVERT EXIST SFR BLD05-332 TO SATELLITE BDRM/OFFICE - ADDING ADDITIONAL COVERED PATIO - REMOVING 1 BDRM CALL IN FOR THE REQUIRED INSPECTIONS THAT APPLY TO YOUR PROJECT. SETBACKS: UFFER: 1 / Footing: 6eXAP .7Ul.)/J 3A07 Ar” Foundation: Stormwater FINAL Approval: Underground Plumbing: Underground Insulation: Shear Wall : Sheathing: Framing: Plumbing: Propane Tank/ Lines: Insulation: Sheetrock: Septic Sytem Final Approval MUST be obtained before final of structure can be attempted. Road Approach Final Approval: Zoning Final Approval: Final/Occupancy Approval: HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY - SEE REVERSE • • BUILDING PERMIT APPLICATION MLA06-00400 Jefferson County Department of Community Development Review Type: I 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD06-00411 Received Date: 7/18/2006 SITE ADDRESS: 694 SUGAR HILL RD CHIMACUM, 98325 OWNER: JODY MAGER PHONE: 360-344-3105 RODERICK MAGER PO BOX 985 CHIMACUM WA 98325 SUGAR HILL ESTATES SUBDIVISION: Block: PARCEL NUMBER: 901135003 Section: 13 Township: 29 N Range: 01 W t: 3 4+ CONTRACTOR: OWNER/BUILDER PHONE: REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOt CONVERT EXIST SFR BLD05-332 TO SATELLITE BDRM/OFFICE - ADDING ADDITIONAL COVERED PATIO - REMOVING 1 BDRM TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP ALT VALUATION 8,485.00 MAIN: CODE EDITION: 2003 ADD'L: HEAT TYPE: OCCUPANCY: R_3 HEAT BASE: HEAT TYPE: OCCUPANCY UNHEATED: #OF STORIES: CONST TYPE 5N OTHER: CONST TYPE: GARAGE: SHORELINE: DECK: 360 SETBACK: SEWAGE DISPOSAL: ALT BANK HEIGHT: WATER SYSTEM: 2WELL BEDROOMS: BATHROOMS: Exist: 2 Exist: 1 Prop: -1 Prop: 0 Total: 1 Total: 1 Routing Date: H /` /1 Type Amount Paid By: Date: Receipt: Approved/Date Permit $167.25 LYK 07/18/06 83778 Plan Check $108.71 LYK 07/18/06 83778 State Building Code $4.50 LYK 07/18/06 83778 AUG 2 Total: $280.46 Jefterson County Planning & Buiiti;ng Department • SPECIAL CONDITIONS FOR CASE # BLD06-00411 • 1.) All kitchen appliances, range and refridgeration shall be removed from the structure prior to final approval. Written verification shall be provided to the Environmental Health Division by the Building Official. 2.) A vegetative buffer of 15-feet shall be permanently maintained from the top or edge of the Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area. 3.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC)Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator. 4.) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter Existing Vegetation." 5.) All construction activities shall not encroach upon the landslide hazard area buffer. This includes the storage or preparation of materials. 6.) The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder of the subject property through installing logs, trees, a hedge row, or any other prominent physical marking approved by the UDC Administrator. 7.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 8.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 9.) An Engineered Stormwater Management Plan dated July 12, 2006 prepared by Brostrom Engineering has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 10.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 11.) Not more than 2 unlicensed or inoperable vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area. 12.) Maximum lot coverage is not to exceed 10%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc. 13.) Minimum setback from Sugar Hill Road right-of-way shall be 20 feet. Minimum north property setback shall be 5 feet. Minimum south property setback shall be 5 feet. Minimum west property setback shall be 5 feet from the top of slope. • 14.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height/il'om the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 15.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way. 16.) The building height is not to exceed 35 feet. 17.) A minimum of two (2) on-site parking spaces shall be provided for the single family residence. 18.) The subdivision lots are subject to a Geotechnical Report that was recorded under AFN 446841. 19.) PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT A WRITTEN LETTER FROM LARUA PARSONS, P.E. STATING THAT THE STORMWATER FACILITY HAS BEEN CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE "STORMWATER MANAGMENT PLAN" DATED JULY 12, 2006. I:\F_B LD_Perm it_Buildng.rpt 10/29/19 • ON C, • O6 JEFFERSON COUNTY 4 �� } DEPARTMENT OF COMMUNITY DEVELOPMENT _� y 'd 621 Sheridan Street • Port Townsend • hi t n ••" ,sue 360/379-4450 • 360/379-4451 Fax " $ II, �a, NO,sp www.co.jefferson.wa.us/commdevelopment j Master Permit Application ;t:VELOF 11f• 06- '\Od Project Description(include separate sheets as necessary): 34.3 V eaSI OrJ OF t✓ <' i. s- 12 -CC 'T r ? c yC « + eov0660 Porto Tax Parcel Property Number: '9o1- 135 003 Size: 5,13 I P.N. S (acres/square feet) `14 suenA.¢. to 1, f2 D,} C 14 wt-t 4 cvc-vk - ego go U i nor CA-�,w� Site Address and/or Directions to Property: ��alEK2 y �s cti Ota) °�-+tom' 1'-o, ro".O LEFT Tug" le--flRowl t l czc _Ez,� Property Owner(s)of Record: �17�To coo up �'"-�-� FoLww �6 C`�, Cl� 8�en� Wf AgErZ, RFjAO"(C� � TUaN T• VP oral V� (094 S►cN Telephone: 344- 31 o S Fax: 344.31 v email: Ie w139Pr elW PS+,V?e f Mailing Address: O,e0c 1.0769 y 6121--nw,igter..tpr NiceAc. 9034,6 Applicant/Agent(if different from owner): Telephone: Fax: email: Mailing Address: What kind of Permit?(Check each box that applies) lilBuilding ❑Variance(Minor,Major or Reasonable Economic Use) [j Demolition Permit ❑Conditional Use C a C d or C]** Single Family ( ) ( ) iill Garage Attached/Detached °Discretionary"D"or Unnamed Use Classification Q Manufactured Home Special Use(Essential Public Facilities)** El Modular °Boundary Line Adjustment 0 Commercial* °Short Plat** El Change of Use °Binding Site Plan** °Long Plat** El El Address I Road Approach []Planned Rural Residential Development(PRRD)/Amendments** Propane ❑Plat Vacation/Alteration** ❑Allowed"Yes"Use Consistency Analysis ❑Shoreline Master Program Exemption/Permit Revisions** ❑Stormwater Management ❑Shoreline Management Substantial Development** OSite Plan Approval Advance Determination(SPAAD)* ❑Shoreline Management Variance OTemporary Use ❑Comprehensive Plan/UDC/Land Use District Map Amendment OWireless Telecommunication* °Jefferson County Shoreline Master Program Amendment ❑Forest Practices Act/Release of Six-Year Moratorium *May require a Pre—Application Conference **Requires a Pre-Application Conference Please identify any other local,state or federal permits required for this proposal, if known: DESIGNATION OF AGENT I hereby designate to act as my agent in matters relating to this application for permit(s). OWNER SIGNATURE Date: By signing this application form,the owner/agent attests that the information provided herein,and in any attachments,is true and correct to the best of his,her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees,representatives or agents for the sole purpose of application review and any required later inspections. Staffs access and right of entry will be assumed unless the applicant informs the County in writing at the time of the ap ' lion tha he•r she wants prior notice. Signature: .49 Date: O7 I$-C The action or actions Applican 'll undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential"take"of an endangered species as those terms are defined in the federal law known as the "Endangered Species Act"or"ESA."Jefferson County makes no assurances to the applicant that the actions that will be undertaken because this permit has been issued will not violate the ESA. Any individual,group or agency can file a lawsuit on behalf of an endangered species regarding your action(s)even if you are in compliance with the Jefferson County development code.The Applicant acknowledges that he,she or it holds individual and non-transf rable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer and signs and dates it below. Signature: )-52------- .;,. , , - 4.,., Date: 07- 1$-Ph, i" D:\PermitCenter\FORMS\DRD FORMS\Master Permit Application 12-30-05-2.doc MIL BUILDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein,that they are not licensed contractors and that they will be t-suming the responsibility of the General Contractor for the proposed project. Signature: /.0.. Date: 0'(b Oje GENERAL CONTRACTOR ' ANUFACTURED HOME INSTALLER: PHONE: FAX: ( ) ( ) MAILING ADDRESS: EMAIL: CONTRACTOR'S LICENSE WAINS NUMBER: NUMBER ARCHITECT/ENGINEER: PHONE ( ) FAX:( ) MAILING ADDRESS: EMAIL Project Type: Frame Type: Bathrooms: Shoreline: Type of Sewage Disposal: ❑ New 121 Wood Existing: ) ❑Sewer ❑ Addition 0 Steel Proposed: 0 Bank 0 Community System Alteration/Remodel 0 Concrete Total: ) Height: TAIndividual System ❑ Repair ❑ Masonry SEP Permit# OS-17fv ❑ Demolition ❑ Other: Bedrooms: Water Supply: Existing: 2 Setback: ❑ Private well g Two Party Type of Heat: Proposed: I 0 Public Total: i Name of System: CI If this is a Commercial Project you must answer the following: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants(includes owners,tenants,employees,etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes / No If this is a Propane Tank and/or Appliance Installation permit,mark all items below that apply: E1 Underground Tank 0 Above ground Tank Size of Propane Tank: ❑Heat Stove 0 Cook Stove 0 Woodstove ❑Fireplace Insert 0 Hot Water Tank Cl Pellet Stove In Other Is this appliance being installed in a Manufactured/Mobile Home? Yes / No When applying for a permit to install a propane tank you must also submit a site plan showing all of the buildings,all property lines, tank location and size,distances from the propane tank to all property lines,buildings and septic system components, including the reserve area. : Square Footage Current Proposed ff A -rOfice Us ray4.,.� A Main Floor Heated .7 EH Bld App Review: 2"0 Floor Heated Consistency Review: ` �s r..�, Other Heated Base fee: 1/ —t .a l Mezzanine Additional Section: ____.----- Heated Basement 672 Plan Check fee: 1 Op . I ,�O � Unheated Basement State Surcharge fee: Other Unheated Pot Water Review fee: Garage/Carport SUBTOTAL a80 •A� Decks 911/Rd Approach fee: - Other 2 , G TOTAL: $ v,[�,q� PO fie-( �a ii NK/M.IGy ... 7 ecei r 433i Ts Cash/Check tuber: --- 1 '15 33 ESTIMATED COST(REQUIRED) Date: 7118 G .Fair market value of all labor anr/materials foundation to fiAishC t" 4 a,�o JlInifial, 8 UU: D:\PermitCenter\FORMS\DRD FORMS\Master Permit Application'12-30-05-2.doe----- t JPf,j NT 411 • et, JEFFERSON COUNT DEPARTMENT ENT OF COMMUNITY DEVELOPMENT .1 frkireAii 621 Sheridan Street.Port Townsend•Washington < 360/379-4450.360 1 Fax 98368 http://www.cojefferson.wa.us/commdevebpment/ Stonmwater Calculation Wo rlcsheet MLA PREVECT/APPUCANTNAME FaCa fora t DETERMINING STORMWATER as REQUIREMENTS:This r . 7CA awvJ be completed fist to "or O The size datemines whether l�Site Plan is required redwith andaon � apP tion,bucfig permit land use in conjunction approval tFathles a - leranagement asic irionnation q�also be helpful for a Stomrwater Plan, PARCELSm= LE Size of parcel La_® ( acres An acre contains 43,560 square feet. Multiply the Size of parcel in square feet ,P,t 8 2 3 �, Y by - sqlft Land-disturbing activity is any activity that results in excavanon- tion, and/or the existing sod that lult►- movement of earth,or a. in existing so cover compaction associated witlru indrxle,but are rwt to vegetativeand � _"`_....V,9 of structures and/y._.,won. clearing, grading,>d�) PacificNative vegetation o and vegetation comprised on plant other than Douglas fir,western reasonably could have been expected to naturally weeds,mateat resite. incigenous Examples s the coastal.ciesregion such the and gold,r,herbaceoush ,western red cedar,alder,big-leaf maple, �:shrubs such as as as sword�,foam Hower,and fireweed. ,elderberry,salrrrQnberrya LAID DISTURBING ACTIVITY try OF NATIVE VEGETATION AND VOLUME OF CUT/FILL Calculate the total area to be cleared, Answer the f two vegetation:pied. Include in this calculation the areato excavated,and/or compacted for proposed ueveropment oorwve related to cleared for site for structures Z��O Does the project convert 14 acres or more of Construction Drainfield,septic tank,etc. � native vegetation to lawn or areas? sq/ft Circle: Yes � _ Well,utilities,etc. sq/ft Does the Y,parking,etc. a net convert 2 acres or more of t��_ vegetation to pasture? landscaping,etc. 3�7o s sq/ft Circle: Yes 0 Other compacted surface,etc. 1 Q`i'o sqlft Indicate Total Volumes of Proposed: Total Land DisturbanceR 4,So [over] storrnwater cart worksheet—REV.10/1l2003 1 tr--) " 0 w \ -7\ .!S.. t _.-.._. ` Impervious surface is a hard surface that either prevents or retards the entry of water into the soil mantle Rs under natural conditions prior to development. A hard surface area which causes water to run off the surface in greater quantities or'at an increased rate of flew from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to roof tops, walkways, patios,driveways,parking lots or storage areas,concrete or asphalt paving,gravel roads, packed earthen materials, and oiled,macadam or other surfaces which 'similarly impede the natural infiltration of stommwater. STORMWATER CALULATIONS—IMPERVIOUS SURFACE NEW EXISTING Structures(all roof area) 24 5(c sq/ft Structures(all roof area) I C S f sq/ft Sidewalks I 3( sq/ft Sidewalks sq/ft Patios c sy/ft Patios i G( sq/ft Solid Decks sq/ft Solid Decks sq/ft -(without infiltrallon below) (without infiltration below) Driveway sq/ft Driveway 2 3 i 4 sq/ft Other sq/ft Other (0° 6el roat:'S) 34 5 C s Total New 4 5 6 C sq/ft Total Existing 7 C 2 sq/ft TOTAL NEW+TOTAL EXISTING* i E . 5 . sq/ft 'This amount will be used to check total lot coverage. The following questions will help determine whether the proposed project is considered development or redevelopment. DEVELOPMENT v.REDEVELOPMENT pivide ff ie,total:existina;mpervious surface above by the size of the parcel and convert to a percentage: 3..2 % Does the site have 35%or more of existing impervious surface? Circle: Yes C No FURTHER INSTRUCTIONS:If the answer is yes, the proposal is considered redevelopment and the attached Figure 2 should be used to determine the..applicable.Mnimum Requirements. If the answer is no,the proposal is considered new development and the attached Figure 1 shuld be used. At this juncture,the applicant should refer to the applicable Flow Chart to determine the Minimum Requirements forstormwater management. DCD staff will help verify the classification of the project and the application requirements. For proponents of "smalr projects who must comply only with Mnimum Requirement..#2--Constnxctlon Stormwater Pollution Prevention—an additional submittal is not required. The proponent is responsible for employing the 12 Elements to control erosion Ind prevent sediment and other pollutants from leaving the site during the construction phase of the project. Pick up the Construction Stormwater Pollution Prevention(SWPP) Best Management Practices(BMPs) Packet. Proponents of"medium"projects—those that must meet only Minimum Requirements #1 through #5 and for large" projects—those that must meet all 10 Minimum Requirements—are required to submit a Stormwater Site Plan. DCD has prepared a submittal template of a Stormwater Site Plan, principally for rural residential projects. Complete the template in the Stormwater Site Plan Instructions and Submittal Template or prepare a Stormwater Site Plan using the step-by-step guidance in the Stormwater Management Manual. APPLICANT SIGNATURE By signing the Stormwater Calculation Worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. (UANDOWNER oa)°ar HORIZED REF'RESExr SIGNATURE) 0401 2 ammeter calk worksheet—REV.10f12003 • • ri,„ JEFFERSON COUNTY • DEPARTMENT OF COMMUNITY DEVELOPMENT j.,jiiteL-ab. 621 Sheridan Street • Port Townsend •Washington 98368 7 0 360/379-4450 • 360/379-4451 Fax N http://www.co.jefferson.wa.us/commdevelopment/ STORMWATER SITE PLAN SUBMITTAL TEMPLATE MLA# PROJECT/APPLICANT NAME: !Viewer�czVt r a-Sidente. �l viCCt Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master Land Use Application or to submit a separate AA site plan map. L / AA references ar' ro i�P Sic'r rrilt t-&r PIc1s�1:�`'ivrneY i{_ I Ii '� i 1 il)I S ?ay i- Project Overview J 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. Set Se=ih(..-) !_. I - Prosrl t- D(.rcr) c.-1 Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. Se;. cn(r .2 .i - EtiSti 5 1(60t,^f;Ic)l)i-I1 ,) 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. h 2. 1 — t1(isti"f1Ci J 3 4. Describe the existing soils. Indicate soil type on the site map. .c SCIC F-i 2- I - Jt`;i l a 5. Describe the existing site hydrology(i.e., drainage;behavior of water on the site—above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable,and indicate acreage of each. Sc�c SE:,/hon 2-. - PPr'mailer!i- - EYis:h1Ci Si {-t. i-hidr Ir,( J 1 J / 6. Describe any excess levels of noise generated by the proposed use or activity: Mone stormwater site plan template—rev.10/1/2003 ! 411 13. Describe the water quality system. corfi( -1 2.5 - c.),1,3lih c)Orin f- 14. Describe the conveyance system analysis and design. S e', ryi-r.i Q f t pi 4 P E t'('T on (T. - f `C i I'F S it fin ta.)t"t°i- 15. Describe the source of fill material,physical characteristics of fill material,and deposition of excess material. f !�� (1. I i i %}i F(t 7't i1+ eT e jt,;11,'. r1,:)1uf rt c' kir % MA'rn l71 i:irc rtr',cerd . 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the Uniform Building Code. f i! 2rt-i S .%1)21!. 10 t r rrn Pr1 • 17. Describe the proposed surfacing material. NOillir' 1itUI;71i(t'1 lS t1t=ifillec')6tf }; 'tit"'i�� C`s' ( )Y:7N °f?iP t-e, ie! • J 18. Describe methods for restoration of the site. Il,StIA}'4)r(f U.'i!! PI'-ihlef bc= Crf 1"'t'iDl?"1fvii fi-ih ilane (S?i�l of C'l; PiMLP , t A pp en1d1)(. 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large"projects only and only those for which facilities are required to control flow or treat runoff.] If included,list the Manuals here. SPS J ea]Un 2.'3 t-'! 19c(,•Th(;%ls ,4rY1 i c)I . 20. List here and include any special reports or studies conducted to prepare the Stormwater Site Plan. SQ ' \OCii on 2.7 -- Spp( prr'TS' i:4rlri 11i rl l r 1' 21. List other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements,describe those conditions or restrictions here. Sce Spec hon 2.f — Permit 7 stormwater site plan template—rev.10/1/2003 • 12 Required Elements—Construction SWPPP(continued) 8. Stabilize Channels and Outlets. spc- mr) 3? -- Hernent 9. Control Pollutants. iecf cn 3- I t-nne.n-f- 10. Control De-Watering(the act of pumping groundwater or stomiwater away from an active construction site). �5'Ex se_chon 3 - E!etner-1 i 1C 11. Maintain Best Management Practices(BMPs). Ie tort 3 Elelre�f /1 12. Manage the Project. N c sk'r11e i 3 - i=lenler 1- 12 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas,roads). QC(,ccic er)f- .FC _ 'ecio -I- t !I be, nF r Sl pix, anyci I) 3A P., ( 2.3C C23i cr C233 . b. Description of the downstream drainage path leading from the site to the receiving body of water(minimum distance of 400 yards).1\JQ re i u)a{-erS Cd 1,:ice—i+ pruporty cr- _cn -Site 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. See See-lion 2, I - Cr h(pi stormwater site plan template-rev.10/1/2003 9; • S SECTION II—EROSION AND SEDIMENT CONTROL PLAN Sediment and erosion control measures may be depicted on the master land use application plot plan,a stormwater site plan,and/or a separate Construction SWPPP site plan. This is a checklist to ensure that the following are depicted on a site plan: 1. General. a. Vicinity Map b. Jefferson County Approval Block c. Erosion and Sediment Control Notes 2. Site Plan. a. Legal description of subject property. b. North arrow. c. Indicate boundaries of existing vegetation(e.g.,tree lines,pasture areas, etc.). d. Identify and label areas of potential erosion problems. e. Identify FEMA base flood boundaries and Shoreline Management boundaries(if applicable). f. Show existing and proposed contours. g. Indicate drainage basins and direction of flow for individual drainage areas. h. Label final grade contours and identify developed condition drainage basins. i. Delineate areas that are to be cleared and graded. j. Show all cut and fill slopes indicating top and bottom of slope catch lines. 3. Conveyance Systems. a. Designate locations for swales,interceptor trenches,or ditches. b. Show all temporary and permanent drainage pipes,ditches, or cut-off trenches required for erosion&sediment control. c. Provide minimum slope and cover for all temporary pipes or call out pipe inverts. d. Shows grades,dimensions, and direction of flow in all ditches,swales,culverts and pipes. e. Provide details for bypassing off-site runoff around disturbed areas. f. Indicate locations and outlets of any dewatering systems. 4. Location of Detention Best Management Practices(BMPs). Identify location of detention BMPs. 5. Erosion and Sediment Control Facilities. a. Show the locations of sediment trap(s),pond(s),pipes and structures. b. Dimension pond berm widths and inside and outside pond slopes. c. Indicate the trap/pond storage required and the depth,length,and width dimensions. d. Provide typical section views through pond and outlet structure. e. Provide typical`details of gravel cone and standpipe,and/or other filtering devices. f. Detail stabilization techniques for outlet/inlet. g. Detail controlrestrictor device location and details. h. Specify mulch and/or recommended cover of berms and slopes. i. Provide rock specifications and detail for rock check dam(s),if applicable. j. Specify spacing for rock check dams as required. k. Provide front and side sections of typical rock check dams. I. Indicate the locations and provide details and specifications for silt fabric. m. Locate the construction entrance and provide a detail. 6. Detailed Drawings. Any structural practices used that are not referenced in the Ecology Manual should be explained and illustrated with detailed drawings. 7. Other Pollutant BMPs. Indicate on the site plan the locations of BMPs to be used for the control of pollutants other than sediment(e.g.,concrete wash water). 8. Monitoring Locations. Indicate on the site plan the water quality sampling locations to be used for monitoring water quality on the construction site. Sampling stations should be located upstream and downstream of the project site. stom water site plan template—rev.10/1/2003 /S �. =V erv'' 1,0-,1 = „i7/1 :g�IVOS NV cc JGL ,lam t -t-tdm "lazl C OdX3 / 1 e N 1e10NO0 / 1 \ / 1 { �_ 0 _ i %>s a 3CIIsaz1 maN 2Ob JO1S Ahr �g GI,aiao-f N t J.?1N� ' I:,; Zl3,lJCt Nar-lsvrn ` � 1 . ".Lsixa aAow� •" NCI / 1 1 : 1 lE 1 1vMfiiC \ `~ , // 1 't I ti ` ~'. 1 / I 1 I .,:. 1 1 / 1 1 ✓. I i: <: —< I as: e: I I I I \\ I I / I I /' '> I ("WzlONINId/cNIVI1 I 1 (NaH011>�' <' i dW�l ,l'IZ1�LJz1O ) ' ( I, 1 ..1. 1vNocAwal I >' I �I+ O L1QH , I _ - i .1�^wNo\\II) , i I i I ' ` W'�Q 1 ` , I ' I >iel- - — OI II I '' 1 \ 1 I I } I I I i` I ^ 1 I ww }ii:, 1 1 1 I \ �:'r'i 1 ? I— J 1 I t t \ \ 1 W / O O / ,,, ,� 6 u I I ` 1 z;; I I I I I I I I I I 1 I I 1 I I III I I I I 1 410 V`d ; I I ix a ," I 1 t ,_ _ 1 II -4 I-41 -d I a- - - 4 - - -I - I ® I- - ® I _ ®1_ _III _ in _1 _ 1 _ 1_ }O 8XZ(Z) iP( itTh1P( I1 , 1I I --I I i mv�_"1a9 Vn?Jb I GrivIls alaN NOO 11 II i 1 I 1 1{ 11 I 1 1 11 v �1=1 Z/1 GeN6 NCI I I I III , - _i - -r_ - 1- -1-1-1- - 1® - �— - �- - ® I- A I "SWIIZ/I (Z) /rn 1109 nz1Hl x � X X y 1-1 aN11 -100 " " 0 SXUZ) II 0 "xaw „gs �� 1N311dO13Aa'' -— aNI 7071.1 Iz1� sNl�zlnd �xtr01J91y zlal�l 900Z $ �(1(' • „�/l �"Id'�S /m >10O1 N1b1CI NO J 1'S7`� -1 t-tllON aNI1 NIVINCI ' lad 11i7 8 u , Li ,lamaAIZla e. 17\�a1\10.129 "N-I .11.-Is9 �Q- b`dO 'XONdc:IV - - , - - - - �.-CINO-l39 3CIb'N >17VM - - ' —allo).39 1-1'dm "0NO0 0 dO1 1 111 rm Imuliimmi 1 vair i7/1 G \ ')G lit. \ V7c:J INASVC:g H1.80N 4IP NV-1d ,ti-,z... . ... .. .. ... . . . . . •-• ., : - -,..-,.- ::- , . : .: , -17 , . . , ,. = . , .•„. ::::. '.....:1": , . • r ..-.:5,-• . Irip._ _ __.1, .. .glriu . ... ....:. .. \ 1 , .. ....: , laNvd NI 1 - i -- / \ . IF >1S • .. ::::,,3•111 .1.. -1 • '-- 1 i , , . . ••• , , , .-... B. .1 ... 03 •*::;-. NN.LOS ... \ .- I',All" : I • • -- ••-•-•. . N2.1.VM o ....:. . ..• -... ....7 .. /Vill . / ....... . . ........', \\ , '.- / `....7. • , ,,, ,...... vrip ,.., 7 1....1]..vg . ..; • - •...?,.. ....--. ...., -....-• -, • ../ NMHG/9 ni .. ....-:- .. , , ...-.. .44.7. ' ....7. ....1 7 : .....]: >PG 'SIMI ...*:...-.• .. Goio NO.LS 7 0' .....: ., •...-•.;- , --.-..--- %.--A. :-.. ...... • , .., , ., .. . ..• ' -.1- .-... .; •••••: ,. I - ..... • -• 0 i i ..... ,.'. ..... .-. 1. .:. , (wooNclaca ! A NIG (NOON CI 3G1 J.G .L.-1G1,.l'al0 ) 1-.1 -1,--IelawNo ) .,. , lAll,C.): 4; oicn.i.s 1.cn4) ., s.,Laor ... ,,, :•::.•_::' _.--..,•,i /, ..,..• ,• .. .. .. :-......... . .'- .:. -.:::- . • ( . .".:-.. . , .. .• •4'7.' 0€el'arl , .:, sc9(3, Nc=i ,. .. .. .. .. ., .. .. .. .. . . . . . . . . . , .. 1 --__..i.,..__ -....-...._"--- .-...-',,,,.........,. . 01 ivd aiaeioNoo --- •ISIX3 asvea leo.' A-Tv'S '?9G10 NO G.I.G0c:1 Nrcia qX c:1)..1 1111 __ __------- .isixa .0 0 J----- El El -i-Tin VNINIV.I.aN I I ON00 'lel xa 1 . geliv J.G aialloNoo Clacl CIt•I'VG NO . It Z/1 CI=1 'I,Z/1 GoN6 NCI GNaArd GnatANad • Ei El El 1 El El NV - .„ lio_ cxtyl.4 liSi7) aA09\1 aAosv oo - tt mIN 11VM 1•11NIV.I.aN OON aGN IN3vidontoo aiatilvoo MaN r -- 900Z 0 i me 4------- 0-4,2 ").-- LOT ` RILTRATE PERM LUE TO CRAI`FIaD 'E 235 \ SAWFt ��7 p5p5E 2549 L1rE TO \ \ \ \ \ MID FLTeR rESCENCE \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 39 >` ; \ \\ \\ \\ \ \\ \ \ 275\ \ \ \ \ \ \ \ \ \\\\ \\ \\\\ \\ \\ N, \ \ 375\\ 390�\ \ \ \ \ \ \ \ \ 32b\ \\ \\\\350 \\ \\ \ \ \ \\ \\ 50\\\ \\\ \ \ \ \ \300\ \ \ \ TozTMCK — 1 — I OONC. WAIT TCP OF SLOPE ' SETS" 1 WWAN HA 1 WOETATICN I GRAPHIC SCALE -20 0 10 20 • 40 so 1. _WFr SITE PLAN SCALE: 1' = 50.0' 12' X32' X5' PRESSURE SAND FILTER 350 _35560 4t2- \ _365 415_ _- -� 37075 390 395 3400 41@I 8=3885_ �\ ` - - �1 tea' 145 ROOF \ \ \\ \ \ \\ \ \ \N,\ FOUL \ \ \ \ \ \ \ \ \ \ FD SETBACK TO ` \ \ \ \ \ \ \ \ \ \ FOUNQ. LINE \ \\ \\ \ \ \\ \ \ \ \\ 15' �ETBACK EFRON4 \ X \TOP OF BANK 1 MAINTAIN \ \ \\ \ \ \ \\ \ \ \ \\ NATIVE VEGETATIOIJ, \ \ \ \\ \\ \\ \ \\ \\ \\ \\ GFXJND COVER \\ \ \ \ \ \ \ \ \ \ \ (SNA, ET ..) \ ` \ X \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ REVISED S P dated�� Has been APPROVED byJEFFERSON FDEPT. OFSIGNATURE: D PERMIT # BLO 06-0411 ifffEBSON COUNTY OCO TOP OF BANK i - -1 -- 1\ EXIST, PRESS. LINES (PU & GRAVITY LINE (GI-) O LINE 08/22/06 yob' UNC' 00 \ PA 0 PROPOSED RESIDENCE FLOOR EL. 4155 (e � X6z 1 1 , ----- . zze N. \� 15.0' \ ---FX \ —1 PARTIAL NORTH SITE PLAN SCALE: 1" = 20.0' 592' 15' SETBACK NOTE: FOR REFERENCES TO CONSTRUCTION NOTES SEE SHEET D-1, DRAINAGE PLAN i-UJ W tO3497 — — N8 ° 'ROAD RO.W. I I LOT 4 _ 7 13 04 W 1034.97' �\ \ 30.G' ROW S21 ° 11'22"W 99.26' ARCHITECTS P,O, Box 1969 PORT TOWNSEND, WA 98368 (800) 261-9381(local: 344-3105) IN 330 \ \ z ` \ / \ - - - - - - - M5 \\\ /� `---- �Y \ // / \\ \\ \ W / / v \\ \\\ \\� ' / L �--- \\ \\�/ // \\ / \ It \ \ / \\ \ \ \\ DENSE TREES \ \ 5.01 ac. _ 345 \\ \ S15009'16'W \ l \ \ w \ \\ 114.87' \ \ It \ \ \ \ o 1513.53' - �— - -�— - \N A50 CURTAIN DRAIN 38 254 94 395 3_O 380 _ 3_ 75_ 37,0 365 3 00 355 N87013' 04" W 1034.97 4W 400 -:1 C FP \ X X- 407 - X� \ \ X - \ --- \ 4 ,\ - \---- --------L----- 0,UTFALL PFk) TION - - - LARGE \ ;\ \\ \ SE CONST. "OTE 6 of \\ 1 SL5 ; ` \ X \ ETAT D1SWALE SEE CONS TOTE 7 PEWEABLE \\ `� \ 1 1 PAVE \ 1 I \ \ \ SLA r TYPE 1CB. \\ PL W`i \` \\\`. ;1 RESERVE �, \ \ X SEE NOTE 9 ��, \ \� \ \ 11 AREA \ 11 \ \ / I \ TO WELL FD \ I \\\ \ \\ 11\ \ ` ,�ONLOT4 �,N111V 1 `. �L2,` 1\ \ 1 1 ..IICC I \ \ wax TIC I �. L \ T \ �� \ 2 �' I If: Nub D-BOX \ \ ` \ 1 , \ 4 R. W. I_ , PERM. PAVERS \ �\ ``\ P\ \ `� \ SE 11- 1 b \ , , 1 BA I \ W MAPLE b INFIEL% SEA- ARATIOf\l SEE NOTE 4 ` , Mom ------ V350 EXIST. `E\ A 1 ` \\ \\ \ W II I 11 STUDIO/ \\ 1 \ } 1 I 3STHB \ M- �' \ \ I \ I 1 1 W I 1 1 1 PAFKG. I 1 1 1 PAD-------- ----------- I -7--+"-r--- --- ��----=-----L- -- 1 I �NN 1 1 1 1I 1 I I ,To SE ten' I \i-T-----�- \ \ \I I EI_s GRAVEL DRIVEWAY TANS- cour4eaq- s � \ 1 I FARMER 1D t omc 134.00' \ lLI RE F3E3)0,00A—\ I � 1 I � I l i 1 \ I 20' SUGAR HILL I ROAD I ROAD R.OW, I SHARED I DRIVEWAY EASEMENT I DRAWING INDEX: Al SITE PLAN, INDEX & NOTES A2 FLOOR PLAN A3 EXTERIOR ELEVATIONS A4 EXTERIOR ELEVATIONS A5 BUILDING SECTION A6 BUILDING SECTIONS A7 SCHEDULES S1 FOUI\OATION PLAN & DETS S2 ROOF FRAMING PLAN S3 STRLCTURAL ELEVATIONS D1 SITE COVERAGE PLAN D2 DRAINAGE PLAN SITE DATA: OWNERS: ROD AND JODY MAGER MAILING ADDRESS: P.OBOX 1969, PORT TOWNSEND, WA 98368 PHONE: 030) 344-3105 SITE ADDRESS: 049 SUGAR HILL ROAD CHIMACUM, WA 98325 LEGAL DESCRIPTION: LOT 3 OF SUGAR HILL ESTATES, IN SECTION 13, TOWNSHIP 29 NORTH, RANGE 1 WEST, WM., VOL.1 OF LARGE LOTS, PAGE 107, RECORDS OF JEFFERSON COUNTY, WASHINGTON. TAX PARCEL NO: 901 135 003 AREA: 6.01 ACRES ZONING: --------___--- LAND USE SINGLE FAMILY RESIDENCE SCOPE OF WORK: CONVERSION OF EXISTING RESIDENCE TO A STUDIO W/ 2 BEDROOMS & BATH, AND CONSTRUCTION OF NEW 1-STORY, WOOD FRAME RESIDENCE. MAGER RESIDENCE Chimacum, Washington Drawing Date :07112/06 Drawn by RM Checked by: RM Approved by , ------- -- REVISIONS NIo. Date By Descrlptlon 08/221W RM LEAVE EXIST LINES TO AND FROM SAND FILTER - AS IS SITE PLAN DRAWING INDEX & NOTES Project No : Drawing No: A-i Release Date: Percent of Cornplatlon :