HomeMy WebLinkAbout111416_ca02Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: November 14, 2016 Subject: Change Order #2 Undie Road Emergency Relocation Project 180-2007-0 Statement of Issue: Execution of Change Order #2 for the above referenced project. Analysis/Strategic Goals/Pro's & Con's: This change order contains three (3) elements which are 1) cost to remove and haul unsuitable soils off site from STA 53+00 to 55+00; 2) credit for use of crushed surfacing base course from pit Q-85; and 3) cost to perform overtime work as ordered by the Engineer on 10/29 to take advantage of one of the few good weather days available in October that was twice as wet as average (22.5 inches of rain). Fiscal Impact/Cost Benefit Analysis: Estimated $17,194. Project is on budget and is approximately 90% complete. Recommendation: Public Works recommends that the Board approve Change Order #2 by signing all three attached forms and returning to Public Works for further processing. Department Contact: Monte Reinders, P.E., County Engineer, 385-9160 Reviewed By: 1 Hipp Morle , C unty Admirn 1111646 - Date Sheet 1 of 1 Date: 11/2/2016 Ordered by County Engineer under terms of ❑X Section 1 - 04. 4 of the Standard Specifications FX Change proposed by Contractor JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS Change CHANGE ORDER Order No. Endorsed by: Interwest Construction, Inc. Contractor Firm Name t Signature Dbte Title Consent given by Surety: (when required) By: Attornev-in-fact Date 2 Contract No. 180 2007 0 To: Interwest Construction, Inc. 609 North Hill Blvd. Burlington, WA 98233 Project Title: uncle Road Emergency Relocation You are ordered to perform the following described work upon receipt of an approved copy of this change order: 1) Remove unsuitable silt/clay soils from excavation at approximate STA 53+00 to STA 55+00 and haul to County -provided waste site in Forks, WA. Provide equipment at waste site to spread material. Costs for haul and spread to be paid at hourly rates per attachments. Cost: $32,004.29 Additional Time: 2 Contract Days 2) Contractor has proposed and County has agreed that Crushed Surfacing Base Course may be used in lieu of Crushed Surfacing Top Course (Bid Item #17). Furthermore, Contractor has propsed and County has agreed to a source (Pit Q-85) and a credit of $5.00 per ton for this material. Finally, a conversion factor of 1.48 tons per cubic yard (truck measure) shall be used. Estimated Credit: $16,000 Additional Time: 0 Days 3) Due to poor weather conditions in October, Engineer requested and Contractor ageed to perform Saturday work on 10/29. County to pay overtime differential. Cost: $1,190.40 One (1) working day charged. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $905,310.00 $910,310.00 $17,194.69 $927,504.69 ORIGINAL CONTRACT CURRENT CONTRACT CONTRACT TIME NEW CONTRACT TIME (days) TIME (days) CHANGE (Add/Del) TIME (days) 70 72 2 APPROVAL RECOMMENDED APPRO AL RECOMMENDAD Proj ct Manager f Date County Fngrneer APPROVAL RECOMMENDED APPROVED El o Engineering Services Manager Date J Chair, Jefferson County Commissioners Date