HomeMy WebLinkAboutInterwest Construction, Inc. Change Order No. 2 - 111416JEFFERSON COUNTY
Sheet 1 of 1
DEPARTMENT OF PUBLIC WORKS
Change
2
Date: 11!212016
CHANGE ORDER
Order No.
Ordered by County Engineer under terms of
rX Section 1 - 04. 4 of the Standard Specifications
18020070
Contract No.
Change proposed by Contractor
To:
Interwest Construction, Inc.
Endorsed by: Interwest Construction, Inc.
609 North Hill Blvd.
�i Contractor Firm Name!
Burlington, WA 98233
Signature Date `
ijl r'o :)/4 C,�-
Project Title: Undie Road Emergency
Title
Consent given by Surety: (when required)
Relocation
By:
Attorney-in-fact Date
You are ordered to perform the following described work upon receipt of an approved copy of this change order:
1) Remove unsuitable sift/clay soils from excavation at approximate STA 53+00 to STA 55+00 and haul to
County-provided waste site in Forks, WA. Provide equipment at waste site to spread material. Costs for haul
and spread to be paid at hourly rates per attachments. Cost: $32,004.29 Additional Time: 2 Contract Days
2) Contractor has proposed and County has agreed that Crushed Surfacing Base Course may be used in lieu of
Crushed Surfacing Top Course (Bid Item #17). Furthermore, Contractor has propsed and County has agreed to
a source (Pit Q-85) and a credit of $5.00 per ton for this material. Finally, a conversion factor of 1.48 tons per
cubic yard (truck measure) shall be used. Estimated Credit: $16,000 Additional Time: 0 Days
3) Due to poor weather conditions in October, Engineer requested and Contractor ageed to perform Saturday
work on 10/29. County to pay overtime differential. Cost: $1,190.40
One (1) working day charged.
All work materials and measurement to be in accordance with the provisions of the standard specifications and
special provisions for the type of construction involved.
ORIGINAL
CURRENT
ESTIMATED
ESTIMATED
CONTRACT
CONTRACT
NET CHANGE
CONTRACT TOTAL
AMOUNT
AMOUNT
THIS ORDER
AFTER CHANGE
$905,310.00
$910,310.00
$17,194.69
$927,504.69
ORIGINAL CONTRACT
CURRENT CONTRACT
CONTRACT TIME
NEW CONTRACT
TIME (days)
TIME (days)
CHANGE (Add/Del)
TIME (days)
70
72
2
APPROVAL RECOMMENDED APPRO Al_ RECOMMEND D
Pro ct Manager Date County ngrneer Date
APPROVAL R MMEND APPROVED
FO
��� vi-
Engineer Servic s Manager Date Chair, Jefferson County Commissioners Date
Department of Public Works
O Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, P.E., Public Works Director/County Engineer&,-,
Agenda Date: November 14, 2016
Subject: Change Order #2
Undie Road Emergency Relocation Project 180-2007-0
Statement of Issue: Execution of Change Order #2 for the above referenced project.
Analysis/Strategic Goals/Pro's Ft Con's: This change order contains three (3) elements which
are 1) cost to remove and haul unsuitable soils off site from STA 53+00 to 55+00; 2) credit for
use of crushed surfacing base course from pit Q-85; and 3) cost to perform overtime work as
ordered by the Engineer on 10/29 to take advantage of one of the few good weather days
available in October that was twice as wet as average (22.5 inches of rain).
Fiscal Impact/Cost Benefit Analysis: Estimated $17,194. Project is on budget and is
approximately 90% complete.
Recommendation: Public Works recommends that the Board approve Change Order #2 by
signing all three attached forms and returning to Public Works for further processing.
Department Contact: Monte Reinders, P.E., County Engineer, 385-9160