From: Monte Reinders, P.E., Public Works Director/County Engineer
Agenda Date: February 13, 2017 ��
Subject: Local Agency Agreement Supplement #3 and Local Agency Federal Aid Project
Prospectus with the Washington State Department of Transportation
for The Rick Tollefson Memorial Trail, Phase I, Co. Project No. CR1815
Statement of Issue: Execution of a Local Agency Agreement Supplement with the Washington
State Dept. of Transportation (WDSOT) is necessary in order to obligate construction phase funds
from two existing grants for the Rick Tollefson Memorial Trail, Phase I project. The two grant
funds are the Federal Highway Administration (FHWA), Surface Transportation Program (STP -R) and
the Washington State Pedestrian Et Bike Safety Program. The updated Project Prospectus is
required to be submitted as documentation with the Supplement #3 document.
Analysis/Strategic Goals/Pro's Et Con's:
The Rick Tollefson Memorial Trail, Phase I project will construct a multi -use trail connecting HJ
Carroll Park with Old Hadlock Road crossing the Chimacum Valley. This project is included in
Jefferson County's 2017-2022 Transportation Improvement Program as item No. 5 and in the 2017
Annual Construction Program as item No. 5. Formal obligation by FHWA of the existing grant
funding for the construction phase is necessary before proceeding with the construction work.
Fiscal Impact/Cost Benefit Analysis: This Local Agency Supplement obligates a total of
$953,311.00 of Federal and State funding for the construction phase. The FHWA STP -R grant is for
$641,797.00 with a participation ratio of 86.5% and the State Pedestrian Ft Bike Safety Program
grant is for $311,514 with a participation ratio of 100%. Jefferson County's Local Funds share is
$100,164.85 with a participation ratio of 13.5%.
Recommendation: The Board is requested to sign the three original Local Agency Agreement
Supplement #3 documents and the three original Project Prospectus documents and return all six
documents to this department. One fully executed original of each document will be returned to
the Board after execution by the Washington State Dept. of Transportation.
Department Contact: John Wayand, Project Manager, 385-9377.
e iew By:
Philip M e , CountyAdminitrator
Date
r
Oil Admk
M
Washington State
AiDepartment of Transportation
Jefferson County Public Works
Local Agency Agreement Supplement
3
i-eceral Aid Project Number ,agreement Numoer CFDA No. ZU.ZU5
STPR-2016(018) LA6612 (Catalog of Federal Domestic Assistance)
The Local Agency requests to supplement the agreement entered into and executed on April 3, 2008
All provisions in the basic agreement remain in effect except as modified by this supplement.
The change to the agreement are as follows:
Project Description
Name Rick Tollefson Trail - Phase One (Chimacum Valley) Length 1725 feet
Termini HJ Carroll Park to Old Hadlock Rd
Description of Work ✓ No Change
Design, acquisition of Right of Way, and construction of a 10 foot wide multi -use trail with 2 foot wide shoulders on a new
alignment. Trail requires one bridge over Chimacum Creek. The trail is part of a non -motorized transportation network.
Reason for Supplement
Obligate funds for construction phase.
Are you claiming indirect cost rate? [—]Yes ✓ No Project Agreement End Date December 31, 2020
Does this change require additional Right of Way or Easements? ❑ Yes ✓ No Advertisement Date: March 29, 2017
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a
condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington State Department of Transportation
By
Title Chair, Board of Jefferson County Commissioners
DOT Form 140-041 14r qD $nrw-
Revised 05/2015 / 2
d
.CWJ
By
Director, Local Program
Date Executed
Page 1
Estimate of Fun Ina
Type of Work
(t)
(2)
(3)
(4)
(5)
Previous
Supplement
Estimated Total
Estimated Agency
Estimated Federal
Agreement/SupAgreement/Sup I.
Pro'ect Funds
Funds
Funds
PE393,546.00
86.5 % a. A enc
0.00
393,546.00
53,129.00
340,417.00
b. Other Ped. & Bike Safety 100%
130,000.00
0.00
130,000.00
0.00
130,000.00
Federal Aid c. Other
0.00
0.00
0.00
0.00
0.00
i
Participaton
Ratio for
10,000.00
0.00
10,000.00
1,350.00
8,650.00
e. Total PE Cost Estimate a+b+c+d
533,546.00
0.00
533,546.00
54,479.00
479,067.00
Right of Way
0.00
f. Agency
oda
g. Other
0.00
Federal Aid
000
h. r
Participation
Ratio for RW i. State
0.00
'. Total R/W Cost Estimate (f-+a--hAi
0.00
0.00
0.00
0.00
0.00
k. Contract
0.00
731,961.85
731,961.85
98,814.85
633,147.00
go6nstructio o
(.Other Ped. & Bike Safety 100%
0.00
172,457.50
172,457.50
0.00
172,457.50
m. Other Consultant
0.00
37,856.50
37,856.50
0.00
37856.50
Federal Aid n. Other
0.00
Participation
Ratio for CN o• AgenCy
0.00
101,200.00
101,200.00
0.00
101,200.00
P. State
0.00
10,000.00
10,000.00
1,350.00
8,650.00
Total CN Cost Estimatek+q+m+n
0.00
1,053,475.85
1,053,475.85
100,164.85
953,311.00
r. Total Pm'ect Cot Estimate a
533,546.00
1,053,475.85
1 1,587,021.85
154,643.85
1,432,378.00
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a
condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington State Department of Transportation
By
Title Chair, Board of Jefferson County Commissioners
DOT Form 140-041 14r qD $nrw-
Revised 05/2015 / 2
d
.CWJ
By
Director, Local Program
Date Executed
Page 1
Agency
Supplement Number
Jefferson County Public Works
3
Federal Aid Project Number
Agreement Number
CFDA No 20 205
STPR 2016(018)
LA6612
(Catalog of Federal Domestic Assistance)
VI Payment and Partial Reimbursement
The total cost of the project including all review and engineenng costs and other expenses of the State is to be paid
by the Agency and by the Federal Government Federal funding shall be in accordance with the Federal Transportation
Act as amended 2 CFR Part 200 The State shall not be ultimately responsible for any of the costs of the project The
Agency shall be ultimately responsible for all costs associated with the project which are not reimbursed by the Federal
Government Nothing in this agreement shall be construed as a promise by the State as to the amount or nature of federal
participation in this project
The Agency shall bill the state for federal aid project costs incurred in conformity with applicable federal and state laws
The agency shall minimize the time elapsed between receipt of federal aid funds and subsequent payment of incurred
costs Expenditures by the Local Agency for maintenance general administration supervision and other overhead
shall not be eligible for federal participation unless a current indirect cost plan has been prepared in accordance with
the regulations outlined in 2 CFR Part 200 Uniform Admin Requirements Cost Principles and Audit Requirements for
Federal Awards and retained for audit
The State will pay for State incurred costs on the project Following payment the State shall bill the Federal Government
for reimbursement of those costs eligible for federal participation to the extent that such costs are aftnbutable and properly
allocable to this project The State shall bill the Agency for that portion of State costs which were not reimbursed by the
Federal Government (see Section IX)
VII Audit of Federal Consultant Contracts
The Agency if services of a consultant are required shall be responsible for audit of the consultants records to determine
eligible federal aid costs on the project The report of said audit shall be in the Agency s files and made available to the
State and the Federal Government
An audit shall be conducted by the WSDOT Internal Audit Office in accordance with generally accepted governmental
auditing standards as issued by the United States General Accounting Office by the Comptroller General of the United
States WSDOT Manual M 27 50 Consultant Authorization Selection and Agreement Administration memoranda of
understanding between WSDOT and FHWA and 2 CFR Part 200 501 Audit Requirements
If upon audit it is found that overpayment or participation of federal money in ineligible items of cost has occurred the
Agency shall reimburse the State for the amount of such overpayment or excess participation
IX Payment of Billing
The Agency agrees that if payment or arrangement for payment of any of the State s billing relative to the project (e g
State force work project cancellation overpayment cost ineligible for federal participation etc ) is not made to the State
within 45 days after the Agency has been billed the State shall effect reimbursement of the total sum due from the regular
monthly fuel tax allotments to the Agency from the Motor Vehicle Fund No additional Federal project funding will be
approved until full payment is received unless otherwise directed by the Director Local Programs
Project Agreement End Date This date is based on your projects Period of Performance (2 CFR Part 200 309)
Any costs incurred after the Project Agreement End Date are NOT eligible for federal reimbursement All eligible costs
incurred prior to the Project Agreement End Date must be submifted for reimbursement within 90 days after the Project
Agreement End Date or they become ineligible for federal reimbursement
VIII Single Audit Act
The Agency as a subrecipient of federal funds shall adhere to the federal regulations outlined in 2 CFR Part 200 501 as
well as all applicable federal and state statutes and regulations A subrecipient who expends $750 000 or more in federal
awards from all sources during a given fiscal year shall have a single or program specific audit performed for that year in
accordance with the provisions of 2 CFR Part 200 501 Upon conclusion of the audit the Agency shall be responsible for
ensuring that a copy of the report is transmitted promptly to the State
XVII Assurances
Local Agencies receiving Federal funding from the USDOT or its operating administrations (i a Federal Highway
Administration Federal Transit Administration Federal Aviation Administration) are required to submit a wnften policy
statement signed by the Agency Executive and addressed to the State documenting that all programs activities and
services will be conducted in compliance with Section 504 and the Amencans with Disabilities Act (ADA)
DOT Forth 140 041 Page 2
Revised 05/2015
AW
Washington State
Department of Transportation
Local Agency Federal Aid
Project Prospectus
DOT Form 14U -1o1 rage 1
Revised 0412015 Previous Editions Obsolete
Prefix
Route
( )
Date
1/17/2017
Federal Aid
Project Number
STPR-2016(018)
DUNS Number
179278197
Lo Agency
18018150
WSDO 1
Federal Employer
91-6001322
Pro Number
` Use Only I
l
Tax ID Number
Agency
CAAgency
Federal Program Title
Jefferson County Public Works
❑✓ Yes ❑ No
Z✓ 20.205 ❑ Other
Project Title
Start Latitude N 48.02033
Start Longitude W 122.77331
Rick Tollefson Trail - Ph. I (Chimacum Valley)
End Latitude N 48.02060
End Longitude w 122.76779
Project Termini From -To Nearest City Name Project Zip Code (+4)
H.J. Carroll Park Old Hadlock Road Port Hadlock 98339
Begin Mile Post End Mile Post Length of Project Award Type
0.00 0.33 1725 feet of new trail ./❑ Local [_1Local Forces E]State ❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
16 Jefferson
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Olympic Region 24 6
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P. E.
533500
54500
479000
03 09
R/W
40000
40000
0
08 12
Const.
1053500
100200
953300
03 17
Total
1627000
194700
1432300
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
Present condition: Rural/Residential area. This project is a new multi -use trail, see description below.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Design, acquisition of Right of Way, and construction of a 10 foot wide multi -use trail with 2 foot wide
shoulders on a new alignment. Trail requires one bridge over Chimacum Creek. The trail is part of a
non -motorized transportation network.
Local Agency Contact Person
Title
Phone
John Wayand
Project Manager
360-385-9377
Mailing Address
City
State
Zip Code
623 Sheridan Street
Port Townsend
WA.
98368
By
Approving Authority
Project Prospectus
Title County Engineer Date
DOT Form 14U -1o1 rage 1
Revised 0412015 Previous Editions Obsolete
Agency
Project Title
Date
Jefferson County Public Works
Rick Tollefson Trail - Ph I (Chimacum
Valli
1/17/2017
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑✓ New Construction ❑✓ Path / Trail
❑ 3-R
14 feet
❑ Reconstruction ❑✓ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
❑ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban
❑ Minor Arterial
❑ Urban
❑ Minor Arterial
Functional
❑ Rural
❑ Collector
❑ Rural
❑ Collector
Classification
❑ NHS
❑ Major Collector
❑ NHS
❑ Major Collector
❑ Minor Collector
❑ Minor Collector
❑ Local Access
❑ Local Access
Terrain
[—]Flat ❑✓ Roll [:]Mountain
❑ Flat ❑ Roll ❑ Mountain
Posted Speed
N/A
N/A
Design Speed
N/A
N/A
Existing ADT
N/A
N/A
Design Year ADT
N/A
N/A
Design Year
N/A
N/A
Design Hourly Volume (DHV)
N/A
N/A
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
Agency
50 %
50
Construction Will Be Performed By
Contract
Agency
Contractor
100 %
0 %
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
❑ Class III - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404
0✓ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
Creek crossing and wetland buffers
See attached Final Environmental Classification Summary form
DOT Forth 140 101 Page 2
Revised 04/2015 Previous Editions Obsolete
Agency
Jefferson County Public Works
Project Tide Date
Rick Tollefson Trail - Ph. I (Chimacum Val& 1/17/2017
Right of Way
❑ No Right of Way Needed ❑✓ Right of Way Needed
All construction required by the F�( No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities Railroad
❑ No utility work required ❑✓ No railroad work required
❑7/ All utility work will be completed prior to the start ❑ Ali railroad work will be completed prior to the start of
of the construction contract the construction contract
❑ All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Relocation of one minor power pole with service lines and one service waterline by Jefferson County PUD.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ] No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
DOT Form 140-101
Revised 0412015
Agency Jefferson County
By
Mayor/Chairperson
Previous Editions Obsolete Page 3