CERTIFICATE OF OCCUPANCY
PERMIT#: BLD16-00401
APPLICANT: MICHEAL S HENSON PHONE: 425-638-9816
MARY BETH HENSON
PO BOX 398
Chimacum WA 98325
SITE ADDRESS: 2086 ANDERSON LAKE RD Issue Date: 10/12/2016
CHIMACUM, 98325 Final Date: 6/13/2017
SUBDIVISION: Block: Lot:
PARCEL NUMBER: 901104033 Section: 10 Township: 29 N Range: iw
PROJECT DESCRIPTION: NSFR - WITH PROPANE TANK
SEP08-00030
THE PROJECT LISTED ABOVE COMPLIES WITH THE REQUIREMENT OF THE BUILDING CODE 2012
EDITION.
OCCUPANCY GROUP: R-3
TYPE OF CONSTRUCTION: 5N
SPRINKLER SYSTEM No
THE PROJECT PASSED ITS FINAL INSPECTION AND RECEIVED FINAL SIGN OFF ON 6/13/2017
Acting Building Official,
Patty Charnas
\\tidemark\data\forms\F_BLD_Occupancy.rpt 6/13/2017
("ctiON c�G • JEFFERSON COUNTY 0 DEPARTMENT OF COMMUNITY DEVELOPMENT
c 621 Sheridan Street I Port Townsend, WA 98368
— ` 360-379-4450 email: dcd@co.jefferson.wa.us
/2:-y � "oma www.co.jefferson.wa.us/commdevelopment
SIf` �`'. BUILDING PERMIT
PERMIT#: BLD16-00401 Received Date: 9/8/2016
SITE ADDRESS: 2086 ANDERSON LAKE RD Issue Date 10/12/2016
CHIMACUM, 98325 Expiration Date 10/12/2017
OWNER: MICHEAL S HENSON PHONE: 425-638-9816
MARY BETH HENSON
PO BOX 398
Chimacum WA 98325
SUBDIVISION:
PARCEL NUMBER: 901104033 Section: 10 Township: 29 N Range: 111
CONTRACTOR: TRUE BUILT HOME INC Contractor's License TRUEBBH925CD
2522 N PROCTOR PMB 32
TACOMA WA 98406
PHONE: 253-777-1714
PROJECT DESCRIPTION: NSFR - WITH PROPANE TANK
SEP08-00030
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION 125,000.00 MAIN: 884
CODE EDITION: 2012 ADD'L: HEAT TYPE: EEE
OCCUPANCY: R_3 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
CONST TYPE: 5-1 HR OTHER:
GARAGE: SHORELINE:
CONST TYPE: SETBACK:
DECK: 112
BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: 1 PWELL Type Amount Paid By: Date: Receipt:
BEDROOMS: BATHROOMS: Permit $1,202.00 SRE 09/08/16 165680
Exist: 1 Exist: 1 Plan Check $781.30 SRE 09/08/16 165680
Prop: 1 Prop: 1 Consistency Review $255.00 SRE 09/08/16 165680
Total: 2 Total: 2 Scanning Fee $21.00 SRE 09/08/16 165680
State Building Code $4.50 SRE 09/08/16 165680
EH SEP/RES Rev $129.00 SRE 09/08/16 165680
DCD Water Review $43.00 SRE 09/08/16 165680
Potable Water Application $129.00 SRE 09/08/16 165680
Total: $2,564.80
HEALTH DEPARTMENT AND PUBLIC WORKS APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455.
Request must be received by 3pm the day before the inspection is needed.
Final Inspections require 24 hour notice.
Office Hours 9:00 am -4:30 pm MONDAY- THURSDAY
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY- SEE ATTATCHED
Jefferson County Building Dion Permit Numb BLD16-00401
Applicant: HENSON
BUILDING PERMIT INSPECTION APPROVALS Applicable Code: 2012 International Building Codes
To schedule inspections, call (360)379-4455 no later than 3:00PM the day before the inspection is needed.
Requests received after 3:00 PM will not be scheduled for the next day's inspections.
ELECTRICAL PERMITS are issued by the Washington State Department of Labor& Industries.
The electrical permit must be signed off by the State Inspector prior to the County's Framing Inspection
Inspection Item Date Approval Signature Notes
Setbacks
Foundation Footing i 0, /6 Pk? x
�� � �
l
Footing Drains ;1-4
Foundation Stem Wall
)ayt 1� Vl'r Qv r i 4;c
Underground Plumbing // � i? ,3
Under Floor Framing
Straps(hold downs) L / 141 y `iI
Ext.Shear Wall Nailing % ? /7 ��'l
Rough-in Plumbing
Framing
Blocking '
Airseal
Insulation:Walls
Insulation:Floors / p j
Insulation:Ceiling S�
' j7 3141 Aviroi< rAh117
Wallboard Nailing 3(Oa._
Blower Airtight Test Vi
7 frill
Smoke&CO Wt/ji
Address Posted l
Glt'
Water Meter Inspection /7
511/ Chimacum
T'fl9T Ari 1 /y22 -3-15
iNter1or fa4 u� /�� _r"'
A final inspection will not be scheduled until the following are completed and signed off by the applicable Department:
• Building Permit Conditions are met • Septic Permit Final/Complete for any building containing plumbing
• Land Use Conditions met and signed off • Public Works Permit Final(where applicable)
FINAL INSPECTION (�/(1 C.-- -
FINAL IN PECTION MUST BE APPROVED PRIOR TO BUILDING BEING OCCUPIED
THIS PERMIT IS VALID FOR ONE YEAR
• S
CONDITIONS for Building Permit# :BLD16-00401
1.) A updated record drawing must be submitted to the septic system permit SEP08-00030
-essentially an "as built" scaled drawing that provides what was installed, how it was
installed including bends and degrees, cleanout locations, distance and fall with final
location of water line installation. That drawing must be submitted, reviewed and
approved by EH prior to final occupancy of the residence. An inspection with adequate
fees may be required by JCPH.
2.) This building approval accounts for 240 GPD of septic system capacity, as designed and
approved SEP08-30 is sized for only one single family residence with a capacity of 360
gallons per day. It is not sized for an Accessory Dwelling Unit(ADU). The minimum daily
design flow per residence is 240 GPD. BLD12-00367 allowed for a guest bedroom,
pottery studio and bathroom, (120 gallons per day). The septic system is now at capacity.
3.) Approval of this permit does not provide any assurance of future approvals for onsite
sewage disposal on the property or use of any existing septic systems. Actions taken to
date and proposed as part of this project may limit or prevent future development of an
onsite sewage system. Future proposals must meet current code at the time of
application.
4.) The project is located within WRIA 17 and thus is subject to compliance with the WA State
Department of Ecology In Stream Flow Rule for that region. The parcel is located within
the Chimacum sub-basin; as such, state regulations require the following:
1. Water use shall be limited to domestic use only, and such use shall not include outdoor
irrigation. "Domestic use" means use of water associated with human health and welfare
requirements, including water used for drinking, bathing, sanitary requirements, cooking,
laundering and other incidental household uses, including potable domestic water
requirements associated with commercial and industrial purposes. (WAC
173-517-150(8))
2. INSTALLATION OF A WATER METER, MEETING DEPARTMENT OF ECOLOGY
SPECIFICATIONS, IS REQUIRED FOR ALL NEW USES THROUGHOUT THE
WATERSHED. (WAC 173-517-180) BROCHURES WITH SPECIFICATIONS ARE
ENCLOSED WITH THE PERMIT.
Refer to enclosed documents for more information, see Ecology web site at
http://www.ecy.wa.gov/programs/wr/instream-flows/quilsnowbasin.html or contact Ecology
at 360-407-6300.
5.) The application was reviewed by the Jefferson County Department of Community
Development staff on 9/9/2016 for the potential presence of Environmentally Sensitive
Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an
initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property: Type
NF stream Fish and Wildlife Habitat Conservation Area, slight landslide hazard area,
Special Aquifer Recharge Protection Area, Susceptible aquifer recharge area.
6.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type,
geologic material, and groundwater that may combine to create problems with slope
stability, erosion, and water quality during and after construction or during natural events
such as earthquakes or severe rainstorms.
7.) DCD approved the submitted Request for Waiver from Geotechnical Report signed by the
applicant dated October 3, 2016.
8.) Streams and geohazard buffers are areas that shall be maintained in their natural
condition, however, minor pruning or alteration of vegetation may be permitted as long as
the function and character of the buffer are not diminished.
9.) A vegetative buffer of 30 feet shall be permanently maintained from the top or edge of the
Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the
Landslide Hazard Area.
•
10.) Landslide Hazard Areas and their sociated buffers shall remain naturally veLated.
Should buffer disturbance occur during construction, the Unified Development Code
(UDC)Administrator shall require replanting with native vegetation. No alterations shall be
made to the Landslide Hazard Area or its associated buffer without prior authorization by
the UDC Administrator.
11.) Prior to and during approved construction activities, the perimeter of the landslide hazard
area buffer shall be marked with a temporary sign. The sign shall be placed in such a
manner that it can be directly observed from the construction area. The sign shall contain
the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter
Existing Vegetation."
12.) All construction activities shall not encroach upon the 30-foot buffer. This includes the
storage or preparation of materials.
13.) The applicant shall permanently separate the boundary of the Landslide Hazard Area
Buffer from the remainder of the subject property through installing logs, trees, a hedge
row, or any other prominent physical marking approved by the UDC Administrator.
14.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological
formations that allow percolation of the surface water into the soils and the underlying
zone of saturation. Aquifers are geologic formations that contain sufficient saturated
permeable material to yield significant quantities of water to wells and springs. Aquifers
serve as the source of drinking water within most of the rural portions of Jefferson County.
15.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that
promote rapid infiltration of recharge waters to groundwater aquifers.
16.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs)and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
17.) A Type NF Stream (Fish and Wildlife Habitat Conservation Area) has been identified on
the subject property. The stream will require a buffer of 50 feet. The buffer shall be
measured horizontally from the Ordinary High Water Mark(OHWM). Fish and Wildlife
Habitat Areas shall also have Buffers and Building Setbacks established.
18.) A permanent physical separation along the boundary of the buffer area shall be installed
and permanently maintained. Such separation can include installing logs, trees, a
hedgerow, or any other prominent physical marking approved by the UDC Administrator.
19.) Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or
every one hundred (100)feet, whichever is less. Signs shall be in place prior to and
during construction activities. The signs shall contain the following statement: "Buffer- Do
Not Remove or Alter Existing Vegetation."
20.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
21.) The site plan as submitted with the new single family residence application on 9/8/2016
has been reviewed for consistency under the UDC, and has been approved by Jefferson
County Department of Community Development. Any modifications, changes, and/or
additions to the stamped, approved site plan dated 10/7/2016 shall be resubmitted for
review and approval by Jefferson County Department of Community Development.
22.) This approval is for a new single family residence only. Any future permits on this site are
subject to review for consistency with applicable codes and ordinances and does not
preclude review and conditions which may be placed on future permits.
•
23.) EDB •
24.) 10' minimum separation required between the water line and any onsite sewage system
components including sewage transport lines.
\\tidemark\data\forms\F_BLD_Permit_Bldg.rpt 10/12/2016
Jefferson County DCD Building Division N
Correction Notice `°o�
PERMIT NUMBER SLD /L . ()i9 L/0/
OWNER l „) •c&rJ
'NG'
JOB LOCATION 0086 AA/,C,r, siti1 Lk' Arcl
Inspection of this structure has found the following violations:
Ke))(.1H -ilk ftNS
t 'Al. R, L;IQf ;n 5 5G, 61) -741
> tit/A.51 L7_ 4 J7 A°/6,1) p a T4' cS'C FA I eED
r�! -?
You are hereby notified additional work shall not be done upon
these premises until the above violations are corrected, unless
otherwise noted.
When corrections have been made, call for ins ection.
Date //.z/2 e: Inspector .
Building Division (360) 379-4450 Inspection Hotline (360) 379-4455
THIS NOTICE MUST BE KEPT WITH APPROVED PLANS ON SITE.
in
(--"--•T Y IG
c\it!� c • Q. dpi UJ
7.
O I v
�'�j.If `' • > 1-- LEc vN fn d Z
=® - .cm
W
C a>
vo o
V ao0
CI CZ 73
cl> 4.
a C1 N ".TIc > y �..
ZLu IL,) %,„,., Q ca MI > v a
w
L \i ` ms c c0 ui
a• cO
j O C V fg CD m -Z mOi aa0_ Hw 110 o/3 . 0
V Q D O ` .yO v 'N Wv:,. -4 EC t-ov ov a) o
C d •1 a) 5 2
I 1 I t
eirt)
SP' inON C (A d'
O 0 d' LLI
i+o �a
Ii
II <z
�y �s. ��P` o Z
3 ^v L
C O ° ° p d
cc.) ,.. o
O C — a> — = p
y �° a _ >
v a+ ( 0 C d O U Le
C 1 "'.'7� U N Q,
�7 cc O4 , d H
cD Z V , 7 C/ -a co W
+, V W N N. o 6 c cn
i m ZO .J \, r� >, N m I o
O L
f— O 1, [� — c C > w
Z U (V '\ t a0i 0 0 E h-
N F— W U V T® L 0. c-
o ' cn Z
W
7 a_ O 0 p co t—