Loading...
HomeMy WebLinkAboutbld2013-00211 septic water issuesSEPTIC ISSUES 9/23/13 Email to planner stating the below. RMarx 7/18/13 Septic issues, need to address: 1) ID on building plot plan the building that has the proposed bathroom, 2) show on the building plot plan the proposed water line, 3) show sewage transport line on the building plot plan, 4) contact a septic system designer and apply for a modification permit to add transport line to existing septic system. RMarx POTABLE WATER ISSUES 1/15/14 tc with DOH, no information submitted to them for variance of 100' protective radius to date. 10/31/13 await confirmation from DOH that the 100' protective radius around the single active well is approved with buildings and interior roads. 7/3/13 met in office with Cary, archetct for the project and explained what has been necessary for potable water since the first pre-app on the site and prior to the first building permit. DCD took in the application with inadequate informtion for potable water review. ROUTED TO EH 7/9/2013 --MEB