Loading...
HomeMy WebLinkAbout062617_ca08Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/ County Engineer Agenda Date: 6/26/2017 Subject: Contract Supplement #1 to Professional Services Agreement for Civil Engineering Services for the Quilcene Complete Streets Project Statement of Issue: Execution of a Standard Consultant Agreement Supplement with SCJ Alliance of Lacey, WA for a modification in scope of Civil Engineering Services for the Quilcene Complete Streets project. Analysis/Strategic Goals/Pro's & Con's: This project is included in the officially adopted 2017-2022 TIP (Transportation Improvement Program) as well as in the 2017 Annual Construction Program, in each as Item No. 6. This project is funded through the WSDOT Pedestrian It Bicycle program, whose objective is to improve the transportation system so as to enhance safety Et mobility for people who choose to walk or bike. This Supplement will provide Civil Engineering Services for both the preparation of a Preferred Design Alternative, in response to the two previous Community Design Workshops, and participation in an additional Community meeting. Fiscal Impact/Cost Benefit Analysis: This Supplemental Agreement to the original Professional Services Agreement is for $16,229, for a revised contract total of $24,659. This project is funded by an $884,165 WSDOT Pedestrian Et Bicycle Program grant. Recommendation: The Board is asked to execute the three (3) originals of the Supplemental Agreement with SCJ Alliance, and return (2) signed originals to Public Works (attn. Eric Kuzma). Department Contact: Eric Kuzma, (360) 385-9167 Reviewed By: 4-A Philip MorleytC unty Administrator E�31� Date Supplemental Agreement Organization and Address: Number: I SCJ Alliance 8730 Tallon Lane NE, Suite 200 Lacey, WA 98516 Agreement Number: LA8311 Phone: (360) 352-1465 Project Number: Execution Date: Completion Date: 18019330 10/26/15 12/31/17 Project Title: New Maximum Amount Payable: Quilcene Complete Streets $24,659 Description of Work: his supplement includes services to prepare preliminary design documents for improvements along US Hwy 101 n Quilcene to be used as the basis for a final community meeting co -conducted by the County and SCJ Alliance. he approximate limits of the project are from the US Bank to the Community Center. The project's goal is to reate streetscape improvements within the available project budget which will serve to lower vehicle speeds ddress safety concerns, establish a sense of place, and have the potential to spur economic development. The Local Agency of Jefferson County Department of Public Works desires to supplement the Professional Services Agreement entered into with SCJ Alliance, of Lacey WA, executed on 10/26/15. All provisions in the original agreement remain in effect except as expressly modified by this Supplemental Agreement. The changes to the original agreement are described as follows: �V MiT, �' TOOT -277, ideitified oi Exhibit "A- I" attached hereto. III Section 4, PAYMENT, shall be amended as follows: Original Agreement Maximum Amount Payable: $ 8,430.00 Sgolemental Agreement #1 Amount: --- $16.229.00 New Agreement Maximum Amount Pa able: $24.659.00 as set forth in the attached Exhibit "E-311 attached hereto. Page 1 of 2 Revised 1/4/2017 If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to Public Works for final action. SCJ Alliance ;fit 454 er Consultant's Name _Lv - W i — Consultant's Signature 3V Date 101 Monte R ' ders, P.E. Date Public Works Director/County Engineer COUNTY OF JEFFERSON BOARD OF COMMISSIONERS Kathleen Kler, Chair Date David Sullivan, Member Date Kate Dean, Member Date Approved as to form only: fi). C, 6�r Pvtq C • N+ o tK a e Chief Civil Deputy Prosecutor Page 2 of 2 Revised 1/4/2017 EXHIBIT A-1 SCOPE OF WORK SUPPLEMENTAL AGREEMENT NO. 1 QUILCENE COMPLETE STREETS QUILCENE, WA Overview This amendment includes services to prepare preliminary design documents for improvements along US Highway 101 in Quilcene, WA to be used as the basis for a final community workshop co -conducted by the County and SCJ Alliance. The approximate limits of the project are from the US Bank to the Community Center (MP 294.5 to 295.0). The goal is to create streetscape improvements within the available project budget which will serve to lower vehicle speeds, address safety concerns, establish a sense of place, and spur economic development. Improvements may include: • Sidewalks and bike lanes • Medians/pedestrian refuge areas • Pedestrian activated signals at key crosswalk(s) • Traffic signs and beacons • Pedestrian lighting • Transit stops and bike racks • Landscaping and street furniture • Curb and gutter • Stormwater improvements SCJ previously contracted with Jefferson County (County) to assist in two community charrettes and provide cost estimates for the preliminary designs presented at each charrette. The work will consist of the following phases: • Final Design Scoping • Project Management • Concept Design Verification Assumptions 1. The project is funded by the WSDOT Pedestrian and Bicycle Program. The State funds will be administered by WSDOT Local Programs, but Federal Aid requirements do not apply (including NEPA), since the grant program is State funding. 2. The County previously contracted separately with Fischer Bouma Partnership to lead the initial charrette stage of the project (two community workshops and associated deliverables). SCJ is providing support as directed by the County per this scope/budget amendment. Quilcene Complete Streets May 26, 2017 Jefferson County Page 1 Exhibit A-1 - Scope of Work 3. The County has provided topographic survey (including a digital terrain model compatible with AutoCAD Civil 3D) and rights of way mapping. 4. SEPA documentation will not be required. It is assumed the project is exempt per WAC 197-11-800 Section 2(d) and 23(b). 5. An archaeological resource inventory report will not be required. The County will fill out the forms for the Department of Archaeology and Historic Preservation (DAHP) to verify no additional reporting is required. The County will send the DAHP determination to the interested Tribes. 6. Right of way is not required. The County will secure any temporary rights for construction. Phase 1 Final Design Scoping Task 1 Final Design Scoping 1) Final Design Scoping: Prepare scope and budget for this amendment and a draft scope of work for Final Design. Understanding • None. Deliverables • Scope and budget for this amendment submitted via email in PDF format. Phase 2 Project Management This phase includes tasks to plan, manage, and administer the work; attend project meetings with the County; and provide quality assurance/quality control. Task 1 Project Management 1) Management: Manage the project by directing and supervising staff and reviewing work for the duration of the project. This management is for the overall work rather than specific tasks. 2) Schedule and Budget: Develop a critical path project schedule to match the scope of work. Review and update the schedule on a monthly basis. Monitor earned value and actual costs on a bi-weekly basis. Provide monthly billing statements to the County including overall budget and schedule confirmation and review for each progress billing period. 3) Weekly Progress Reports: Prepare and submit a weekly progress report. Weekly progress reports will show: (1) work performed last week, (2) work planned this week, (3) schedule and budget status (including a 3 -line earned value chart), (4) a summary of scope changes/added value, and (5) items needed from the TOWN and/or others. 4) Progress Billings: Prepare a monthly progress bill with weekly progress reports attached. Bills will show staff hours for each phase (i.e., Phase 1: Project Management). Quilcene Complete Streets May 26, 2017 Jefferson County Page 2 Exhibit A-1 - Scope of Work Task 2 Project Meetings 1) Project Status Meetings: Attend up to two meetings in Port Townsend to discuss the status of the project, present draft materials in progress, and coordinate with County staff. Meetings will be attended by the Consultant project manager. Task 3 Quality Assurance/Quality Control 1) Quality Control: Provide senior level review of task deliverables before submittals. 2) Quality Assurance: Audit quality check activities and documentation on a periodic basis. Understanding • Project management will be provided over a 3 -month time frame and the estimated number of meetings and project coordination is reflected in the budget. • Progress billings will be submitted monthly to the County. • Monthly progress billings will be deemed incomplete and subject to non-payment if associated weekly progress reports are not submitted. Deliverables • Weekly Progress Report submitted via email in PDF format. • Progress billings submitted monthly submitted via US Mail. • Minutes for meetings submitted via e-mail in PDF format. Phase 3 Concept Design Verification This phase includes preliminary designing to a specific budget. It is also for additional charrette support beyond the support scoped and budgeted in the original contract. Task 1 Concept Design Verification 1) Auto -Turn Analysis: Complete Auto -Turn analysis at US Hwy 101/Center Road and proposed refuge locations. 2) Draft Layout: Draw the preliminary Fisher Bouma Partnership hand -drawn concept design in AutoCad incorporating conceptual level strategies to mitigate commercial access limitation created by refuges/turn lane modifications. 3) Project Cost Analysis: Estimate construction costs and total project costs for the updated/drafted concept design. Create a Pareto Diagram to help analyze the cost of construction and determine how to reduce the scope of improvements to match the County's project grant budget. Meet with the County to review SCJ recommendations. 4) Revised Layout: Prepare revised concept design per changes made from the Pareto diagram results and analysis and input from the County. S) Cost Estimate: Prepare a concept -level project cost estimate for the revised layout. 6) Technical Memorandum: Prepare a technical memorandum to document scope of improvement, design layout, and project cost estimate decisions. Quilcene Complete Streets May 26, 2017 Jefferson County Page 3 Exhibit A-1 - Scope of Work Task 2 Charrette Support 1) Community Workshop: Co -conduct with the County a final community design meeting presenting the revised concept designs. Understanding • Support for Task 2 will be as directed by the County, and the support is limited to budgets provided herewith. Deliverables • Concept layout submitted via email in PDF and DWG format. • Concept cost estimate submitted via email in PDF and Excel format. • Technical memorandum, including Pareto Diagram and Auto -Turn analysis, submitted via email in PDF format. Future Phases for Final Design and Construction Geotechnical Study Preliminary Design Agency Coordination Final Design Bidding Services Construction Management END OF SCOPE OF SERVICE Quilcene Complete Streets May 26, 2017 Jefferson County Page 4 Consultant Labor Hour Estimate - Exhibit E-3 PrWiitt: Quilcene Complete Streets (Supplemental Agreement NoA i Ptlry Scott Whitney Matt Ali- $/ Task No Task Description 1nncipal Principal Protect Senior Project EMP Cat 6 EMP Ca[ 7 EMP Cat 8 EMP Cat 9 EMP Cat Toto) Engineer I Designer Coord 1 10 Phase 01 Final Design Scoping Task Ol Final Design Scoping 1 Final Design Scoping 2.0 10.0 Project Management 1.0 Task Ol 13 0 Subtotal Hours.1 2.0 10.0 1.0 13.0 Total Phase Hours 2.0 10.0 1.0 I I I I 13.0 Total Phase Direct Labor: $144.00 $400.00 $26.00 $570.00 Phase 02 Project Management Task Ol Task 01 Project Management 1 1 2 3 4 Management Schedule and Budget Weekly Progress Reports Progress Billings 1.0 3.0 3.0 3.0 1.5 3.0 3.0 3.0 1.5 Draft Layout Subtotal Hours: 1.0 9 0 1.5 10 5 Task 02 Project Meetings 6.0 1.0 10.0 4 1Project Meetings 1.0 4.0 140 8.0 5 Cost Estimate Subtotal Hours: 1.0 4.0 4.0 4.0 Task 03 Quality Assurance/Quality Control 6.0 1 Quality Control 10.0 2.0 60.0 2.0 2 Quality Assurance 0.5 0.S !Community Charrettes Subtotal Hours: 0.5 2.0 2.5 Subtotal Hours: 8.0 Total Hours All Tasks: 0.5 15.0 1.5 17.0 Total Direct Labor Estimate $50.00 1 $1,080.00 1 $39.00 $1,169.00 Phase 03 Concept Design Verification Task Ol Concept Design Verification 1 Auto -tum Analysis 1.0 12-0 2 Draft Layout 1.0 20.0 3 Project Cost Analysis 6.0 1.0 10.0 4 Revised Layout 1.0 8.0 5 Cost Estimate 1.0 4.0 6 Technical Memorandum 6.0 Subtotal Hours: 10.0 t.0 60.0 Task 02 Charrette Support 1 !Community Charrettes 8.0 Subtotal Hours: 8.0 Total Phase Hours: 18.0 1.0 60.0 Total Phase Direct Labor: 57.296.0C S40.00 $2,160.00 Total Hours All Phases 0.5 3S.0 11.0 60.0 2.5 Total Direct Labor Estimate All Phases $50.00 $2,520.00 $440.00 I $2,160.00 S6S.00 13.0 21.0 17.0 9.0 5.0 6.0 71 0 8.0 8.0 [1111111, 109.0 $5,235.00 Page 1 of 2 Consultant Fee Determination - Exhibit E-3 Project: Quilcene Complete Streets (Supplemental Agreement No.t) Consultant Fee Determination DIRECT SALARY COST Discipline Hours Rate Amount Sr Principal Consultant 0.5 $100.00 $50 Principal 35.0 $72.00 $2,520 Project Engineer 1 11.0 $40.00 $440 Senior Designer 60.0 $36.00 $2,160 Project Coord 1 2.5 $26.00 $65 Subtotal: 109.0 Total Direct Salary Cost $5,235 OVERHEAD Overhead Rate: 165.37% Direct Salary Cost: $5,235 Overhead Cost $8,657 FIXED FEE Fixed Fee Rate: 32.00% Direct Salary Cost: $5,235 Fixed Fee Cost $1,675 TOTAL SALARY COST Total Salary Cost $15,567 SUBCONSULTANTS (Yes or No) Yes Subconsultant Fee $0 Subconsultant Markup: 0% $0 Total Subconsultants $0 REIMBURSABLES Copies, Reproductions, et 1.5% of Total Salary Cost $234 Mileage: 800 miles at $0.535 $428 Total Expenses: $662 SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES) Subtotal (Salary, Subconsultants and Expenses) $16,229 MANAGEMENT RESERVE FUND (MRF) Management Reserve 0.0% of Subtotal $0 Total Estimated Budget: $16,229 Page 2 of 2