Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ZON2017-00010 PUBLIC NOTICE
AFFIDAVIT OF POSTING PUBLIC NOTICE JEFFERSON COUNTY UNIFIED DEVELOPMENT CODE ORDINANCE#03-0702-01 State of Washington) County of Jefferson) I, c)'217oj" D, 1"-741)---1 , being duly sworn of oath say that I have posted one (1) public notice poster on or near the site identified in the following development description: PROPOSAL: CONDITIONAL USE PERMIT ADMINISTRATIVE TYPE II (A)The project is for a Type II Conditional Administrative Use Permit for the installation of a 275 square foot modular attendant office with upgrades to an existing shipping container to serve as a Household Hazardous Waste collection station. The project entails utility improvements such as a septic tank and a transport line to the existing septic system location onsite on the adjacent county parcel to the east. The site is located in a susceptible aquifer recharge area and an Aquifer Recharge Area report was submitted by GeoEngineers. The project will also involve new site lighting installation and surveillance. Three new parking spaces are proposed to serve the new development. The proposal is exempt from SEPA review under WAC 197-11-800(2)(f). This project requires a Type II Conditional "C(a)"Administrative Use Permit in accordance with Table 3-1 of the Jefferson County Code Title 18.15.040 for a recycling collection facility in a rural residential 1:5 zone. This notice was posted in full compliance with UNIFIED DEVELOPMENT CODE on:/ the day of /' l,'" ► , 2017. 7/0, 0,1-. t (Signature ofperson postingnotice) 9 Subscribed and sworn to before me on this �' day of t��/ , 2017. Acknowledgement: ,�a��""+"++++,,,, �,oPPp,DO T,SD * 4oTARY''\ tr• PuBoG . p a /) 1 • Notary Publi in and for the State of Washington, ' OF WASE\,°" residing in ter; , Washington. My commission expires: l- NOTARY STAMP MLA Number: MLA17-00025 Proponent(s): JEFFERSON COUNTY Donna Frostholm From: Gordon Ramstrom Sent: Monday, May 01, 2017 3:37 PM To: Tom Boatman Cc: George Puopolo; Donna Frostholm Subject: SW Quilcene Public Notice Posted Attachments: IMG_0947 - Copy.JPG Tom, Please note the attached photo, of the public notice, posted today at the SW Quilcene Site. I will now complete the Affidavit of Posting the notice, and submit to DCD. The Public Notice will remain in place until at least May 17, 2017. FYI Gordon D. Ramstrom Architectural Projects Planner Jefferson County Public Works 623 Sheridan St. Port Townsend,WA 98368 qramstrom@co.jefferson.wa.us T: 360-385-9380 F: 360-385-9234 1 �� ,. ° > d � a . � � 1 ' j b� , jiglit 111,_,,:,,,,,,,,,_ n),--.... :,.., , r ,;10.;" , ,,,,, 4 ,7, Cird 4 •, �, .4 _. '1' = i ir Y .,. �� " "i• r is o ;i • ^� -.4 IJJ ir -� _ 1 '� � 1� . Fl • ' 7u ifin" J / 4;1 i Y ., l 1 • t .�►�B ;is r tri • d "� 5 �iy : ' ' *,,,,*1r ! i .' X04 0:1&4116,$S, 0; a i I I 10#-: ;-,4 - ,,,,,,„,,....,, .„ , ._.. . . , ,.....„ , ..... v", - ,. •::::..100,, i_ ,.. ,.....„, ,..„„z.,..:„.„,,, , , .... ,, . .,„.**;,74,-...; ,,,, _,„ ..... ,..., . i . , ...„..,,,-.0 ,-, ,, 4.,,,, Al 1 C ` F �O v ) 'O } i�.. u p . .... .. rS ,°'''',..'7: i'. Z' , , 4 + o e'x � �',i JEFFERSON COUNTY PERMIT CENTER CASE NO. ..41 L,4 ( -©C 00,-)D5 CERTIFICATION OF MAILING I make the following certification: I am competent to testify and make this certification based upon personal knowledge. On this !( day of ` I , 2017, I deposited into the U.S. Mail with first class postage affixed, true and correct copies of WO Ak CI- y_ 400(/0,40 in the above matter, addressed to: L/ Adjacent Property Owners: See attached list. (Notices Only) l' Agencies: See attached list. Interested Parties: See attached list. %<' Applicant/Representative - Posting Packet: 1 set of laminating sheets with Notices, Posting Instruction, Affidavit, and a copy of Notice. / Newspapers (Notices Only) 1/ Official Posting Places (x3) H Other: I declare under penalty of perjury under the laws of the State of Washington that the foregoing certification is true and correct. EXECUTED this df day of 4 fir; I , 2017 at Port Townsend, Washington. a eclarant ... 7022 702143025 , R 0 1 3 20:17 \ t tea Z ptlf � 6{ � .e. C N ?232004 \ Keo y9 -` 43 02 47021 a� } N ,_# 1. ak - A - to N O O N V 0 w 0 702143023 v� ",,, 702232( N. 0 Oc. 702143022 !', K:\'''\#‘110C't;I' wkaft'{ '"'": n� 11 ��Oj 7��2016 702143016 PQ 702231017 p `2702231011 .040, O 702 7 1fl 1 7022 1 C 03 4 0 c I_ ___,.,a.,7.c.;.....11 \ 702231028 �p ,.. 0 ul t i r 444 o 24 i $ ; .. N R , t k 1R 4 v*„. lit i ., , . ," '''' t'''4'..11' it ' " '''' OZO�'� . � 70223 ?1 v 02 0 it, � ; 0 702144011 1 w * r" e f `' 70223 1007 014400 ,r 702242006 70224200 �, 0 l w N. w a N 702242009 0 a n (.1 t *i 0 }' -4 ! ' W • teJ w r V O 7072420118 o W to 0 70 42002 v, 1 '4 w 702242011 "�" .-. ' �cwn RAILROAD GRADE LLC FREDERICK T PLEINES FRANCES E MURKOWSKI PO BOX 763 LORRAINE PLEINES PO BOX 306 QUILCENE, WA 98376-0763 PO BOX 2038 QUILCENE, WA 98376-0306 FORKS, WA 98331-2038 REINERTSEN FAMILY TRUST RICHARD HOIDAL JEFFERSON COUNTY PO BOX 716 C/0 CAROLYN BAGLEY PO BOX 1220 QUILCENE, WA 98376-0716 4701 NE SHORE PL PORT TOWNSEND, WA 98368-0920 LK FOREST PK, WA 98155-5639 NILS GLOMSET STEPHEN A GRATZER TRUSTEE JEFFREY W SIMON ERIN GLOMSET MYLREA GRATZER TRUSTEE PO BOX 760 PO BOX 814 S & M GRATZER LIVING TRST QUILCENE, WA 98376-0760 SEQUIM, WA 98382 QUILCENE, WA 98376-0548 WALTER H PEDERSON COAST SEAFOODS COMPANY ALEXANDER FAMILY TRUST PO BOX 9 A WASHINGTON CORP ROBERT ALEXANDER TRUSTEE QUILCENE, WA 98376-0009 PO BOX 166 BONNIE ALEXANDER TRUSTEE SOUTH BEND, WA 98586-0166 Po • )K 43 f2,`.tCG2a1i'f Wh g3ato ®16 ROBERT K ALEXANDER ALEXANDER FAMILY TRUST CLEONE L TELLING BONNIE L ALEXANDER BONNIE ALEXANDER TRUSTEE TIMOTHY J MC COY PO BOX 163 PO BOX 163 181 LELAND VALLEY RD E QUILCENE, WA 98376-0163 QUILCENE, WA 98376-0163 QUILCENE, WA 98376-8524 JOHN R BURNSTON RICHARD W BANCROFT TERRI BURNSTON JENNIFER L BANCROFT PO BOX 134 PO BOX 231 QUILCENE, WA 98376-0134 QUILCENE, WA 98376-0231 Emma Bolin From: Emma Bolin Sent: Thursday, April 27, 2017 2:56 PM To: 'bgraham@jeffpud.org'; 'SeversD@wsdot.wa.gov'; Roger Parker;Jim Pearson; 'chief@qvfd.org'; 'Chris.Waldbillig@dfw.wa.gov'; 'scott.berbells@doh.wa.gov'; 'custsery@jeffersontransit.com'; Stuart Whitford Cc: Donna Frostholm; 'njohnson@ptleader.com'; 'lleach@peninsuladailynews.com' Subject: Notice of Application MLA17-00025 - ZON17-00010 Jefferson County Public Works Hazardous Waste Collection Station Attachments: MLA17-00025 NOA.pdf Good afternoon: Please see the attached notice of application for a Type II Conditional Administrative Use Permit for the installation of a 275 square foot modular attendant office with upgrades to an existing shipping container to serve as a Household Hazardous Waste collection station.The project entails utility improvements such as a septic tank and a transport line to the existing septic system location onsite on the adjacent county parcel to the east.The site is located in a susceptible aquifer recharge area and an Aquifer Recharge Area report was submitted by GeoEngineers.The project will also involve new site lighting installation and surveillance.Three new parking spaces are proposed to serve the new development. The proposal is exempt from SEPA review under WAC 197-11-800(2)(f).This project requires a Type II Conditional "C(a)" Administrative Use Permit in accordance with Table 3-1 of the Jefferson County Code Title 18.15.040 for a recycling collection facility in a rural residential 1:5 zone. The application is also currently being reviewed by Jefferson County Sanitarians Susan Porto and Randy Marx for potable water and septic review. The application materials will be available for viewing online starting May 3rd, 2017. Here are the directions for viewing the notice of application online: http://www.co.jefferson.wa.us/commdevelopment/PublicNoticeHome.htm Click accept. Click on the files in folder MLA17-00025 Public Works Hazardous Waste Collection station Please let me know if you have any questions. Thank you, Emma Bolin Assistant Planner Jefferson County Department of Community Development 621 Sheridan Street Port Townsend,WA 98368 Phone 360-379-4484 Fax 360-379-4451 ebolin@co.efferson.wa.us All e-mail sent to this address has been received by the Jefferson County e-mail system and is therefore subject to the Public Records Act,a state law found at RCW 42.56.Under the Public Records law the County must release this e-mail and its contents to any person who asks to obtain a copy(or for inspection)of this e-mail unless it is also exempt from production to the requester according to state law,including RCW 42.56 and other state laws. 1 JEFFERSON COUNTY PUBLIC NOTICE OF TYPE II LAND USE APPLICATION Affidavit of Publication MLA17-00025 APPLICANT: STATE OF WASHINGTON) JEFFERSON COUNTY PUBLIC WORKS SS PO BOX 1220 PORT TOWNSEND WA 98368-0920 COUNTY OF JEFFERSON) Application Received Date:April 7,2017 Application Complete Date:April 27,2017 I, Carol J. Fraley, an employee of the Port Townsend & Jefferson Application Notice Date:May 3,2017 County Leader, a weekly newspaper which has been established, SITE ADDRESS AND PROJECT LOCA- TION: published in the English language and circulated continuously as a 295312 Hwy 101,QuiIcene WA 98376,Par- weekly newspaper in the town of Port Townsend in said County and cel Number 702-231-010.Section 23-Town- ship 27N-Range 2w State, and for general circulation in said county for more than six (6) PROJECT DESCRIPTION AND REQUIRED months prior to the date of first publication of the Notice hereto PERMITS/STUDIES: attached and that the said Port Townsend & Jefferson County Leader The project is for a Type II Conditional Ad- ministrative Use Permit for the installation of was on the 27th day of June 1941 approved as a legal newspaper spaper by the a 275 square foot modular attendant office Superior Court of said Jefferson County and annexed is a true copy of with upgrades`to an existing shipping con- tainer to serve as a Household Hazardous the Ad# /6 457 Waste collection station.The'project entails utility improvements such as a septic tank and a transport line to the existing septic sys- tem location onsite on the adjacent county parcel to the east.The site is located in a susceptible aquiiar recharge area and an Aquifer Recharge Area report was submit- SEE ATTACHED NEWSPAPER CLIPPING ted by GeoEngineers.The project will also involve new site lighting installation and surveillance.Three new parking spaces are proposed to serve the new development.The proposal is exempt from SEPA review under WAC 197.11-800(2)(t).This project requires As it appeared in the regular and entire issue of said paper itself not in a Type II Conditional"C(a)"Administrative Use Permit in accordance with Table 3-1 of a supplement thereof for a period of / weeks, beginning on the the Jefferson County Code Title 18.15.040 day of ilia // 2017, ending on the day of for a recycling collection facility in a rural resi- dential 1:5 zone. McLV� , 2017 that said newspaper was regularly distributed COMMENT PERIOD AND WHERE TO to theirlsubscribers during all of this period. That the full amount of VIEW DOCUMENTS: $ 76, 5-6 has been paid in full, at the rate of$ per column inch The application and any studies may be re- viewed at the Jefferson County Department for each insertion. of Community Development. All interested persons are invited to.(a)comment on the application;(b) receive notice of and par- Subscribed and sworn to before me this Ja' day of Ljtc2017. ticipate in any hearings;and(c)receive a copy of the decision by submitting such writ- ten comment(s)/request(s)to the Jefferson County Department of Community Develop- _ _A L ♦'re,. / - _ ment, Development Review Division, 621 Caof Fraley *Townsend.Sheridan Street,Port Townsend,WA 98368, Notary Public in and for the State o }shington Residing ai (360)379-4450.Comments concerning this application should be submitted to the De- partment by 4:30 p.m.on May 17,2017.If the last day of the comment period falls on a weekend or holiday,then the comment pe- riod shall be extended to the first working day after the weekend or holiday.Comments sub- mitted after this date may not be considered in the staff report. Project Planner:Emma Bolin,360-379-4484 For further information,please visit the Jef- ferson Coinity Department of Community Deveop cent web page at www.co.jefferson. we '.;iccmmdevelopmentt 164151 5/3 Emma Bolin From: Leader Legals <subscriptions@ptleader.com> Sent: Thursday, April 27, 2017 12:56 PM To: Emma Bolin Subject: Re: Publish MLA17-00025 Attachments: 164151.pdf;ATT00001.htm;JeffCo D Quote - 164151.pdf;ATT00002.htm Hi Emma, Attached you'll find our quote and a proof for the notice you submitted for publication with the Leader. Please review both attachments and make sure they meet with your approval. Also please let us know if you have any questions or concerns regarding the publication of your legal notice. As always, thank you for your business. We strive to serve our customers and their publication needs with the utmost care and professionalism. Karen Karr Emma Bolin From: Emma Bolin Sent: Thursday, April 27, 2017 3:15 PM To: 'aarthur@ptleader.com' Subject: FW: Notice of Application MLA17-00025 -ZON17-00010 Jefferson County Public Works Hazardous Waste Collection Station Attachments: MLA17-00025 NOA.pdf Dear Alison, Please see the email below and let me know if you have any questions. Thank you kindly, Emma Bolin Assistant Planner Jefferson County Department of Community Development 621 Sheridan Street Port Townsend,WA 98368 Phone 360-379-4484 Fax 360-379-4451 ebolin@cojefferson.wa.us All e-mail sent to this address has been received by the Jefferson County e-mail system and is therefore subject to the Public Records Act,a state law found at RCW 42.56.Under the Public Records law the County must release this e-mail and its contents to any person who asks to obtain a copy(or for inspection)of this e-mail unless it is also exempt from production to the requester according to state law,including RCW 42.56 and other state laws. From: Emma Bolin Sent:Thursday,April 27, 2017 2:56 PM To: 'bgraham@jeffpud.org'<bgraham@jeffpud.org>; 'SeversD@wsdot.wa.gov' <SeversD@wsdot.wa.gov>; Roger Parker <RParker@co.jefferson.wa.us>;Jim Pearson <JPearson@co.jefferson.wa.us>; 'chief@qvfd.org'<chief@qvfd.org>; 'Chris.Waldbillig@dfw.wa.gov'<Chris.Waldbillig@dfw.wa.gov>; 'scott.berbells@doh.wa.gov' <scott.berbells@doh.wa.gov>; 'custserv@jeffersontransit.com'<custsery@jeffersontransit.com>; Stuart Whitford <SWhitford@co.jefferson.wa.us> Cc: Donna Frostholm <DFrostholm@co.jefferson.wa.us>; 'njohnson@ptleader.com' <njohnson@ptleader.com>; 'lleach@peninsuladailynews.com' <Ileach@peninsuladailynews.com> Subject: Notice of Application MLA17-00025-ZON17-00010 Jefferson County Public Works Hazardous Waste Collection Station Good afternoon: Please see the attached notice of application for a Type II Conditional Administrative Use Permit for the installation of a 275 square foot modular attendant office with upgrades to an existing shipping container to serve as a Household Hazardous Waste collection station.The project entails utility improvements such as a septic tank and a transport line to the existing septic system location onsite on the adjacent county parcel to the east.The site is located in a susceptible aquifer recharge area and an Aquifer Recharge Area report was submitted by GeoEngineers.The project will also involve new site lighting installation and surveillance.Three new parking spaces are proposed to serve the new development. The proposal is exempt from SEPA review under WAC 197-11-800(2)(f).This project requires a Type II Conditional "C(a)" Administrative Use Permit in accordance with Table 3-1 of the Jefferson County Code Title 18.15.040 for a recycling collection facility in a rural residential 1:5 zone. 1 The application is also currently being reviewed by Jefferson County Sanitarians Susan Porto and Randy Marx for potable water and septic review. The application materials will be available for viewing online starting May 3'd, 2017. Here are the directions for viewing the notice of application online: http://www.co.jefferson.wa.us/commdevelopment/PublicNoticeHome.htm Click accept. Click on the files in folder MLA17-00025 Public Works Hazardous Waste Collection station Please let me know if you have any questions. Thank you, Emma Bolin Assistant Planner Jefferson County Department of Community Development 621 Sheridan Street Port Townsend,WA 98368 Phone 360-379-4484 Fax 360-379-4451 ebolin@co.jefferson.wa.us All e-mail sent to this address has been received by the Jefferson County e-mail system and is therefore subject to the Public Records Act,a state law found at RCW 42.56.Under the Public Records law the County must release this e-mail and its contents to any person who asks to obtain a copy(or for inspection)of this e-mail unless it is also exempt from production to the requester according to state law,including RCW 42.56 and other state laws. 2 NOA Notice for Jefferson County Public Works Attendant station and Recycling Center PUD—Bill Graham 'bgraham@jeffpud.org' WASHDOT—Dale Severson -SeversD@wsdot.wa.gov JC EH—Stuart Whitford—swhitford@co.jefferson.wa.us JC EH— Roger Parker—rparker@co.jefferson.wa.us JC PW-Jim Pearson—jpearson@co.jefferson.wa.us Fire District 2 Fire Chief-Chief Karp 'chief@gvfd.org'; PT Leader—Alison Arthur—aarthur@ptleader.com PDN—Leah Leach- (leach@peninsuladailynews.com WDFW—Chris Waldbillig-Chris.Waldbillig@dfw.wa.gov DOH -Scot Berbells-scott.berbells@doh.wa.gov Jefferson Transit-custsery@jeffersontransit.com Send to : bgraham@jeffpud.org,SeversD@wsdot.wa.gov,swhitford@co.jefferson.wa.us, rparker@co.jefferson.wa.us, jpearson@co.jefferson.wa.us, chief@qvfd.org, Chris.Waldbillig@dfw.wa.gov, scott.berbells@doh.wa.gov, custsery@jeffersontransit.com; Copy: aarthur@ptleader.com ; (leach@peninsuladailynews.com JEFFERSON COUNTY PUBLIC NOTICE OF TYPE II LAND USE APPLICATION M LA17-00025 APPLICANT: JEFFERSON COUNTY PUBLIC WORKS PO BOX 1220 PORT TOWNSEND WA 98368-0920 Application Received Date: April 7, 2017 Application Complete Date: April 27, 2017 Application Notice Date: May 3, 2017 SITE ADDRESS AND PROJECT LOCATION: 295312 Hwy 101, Quilcene WA 98376, Parcel Number 702-231-010, Section 23-Township 27N-Range 2W PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES: CONDITIONAL USE PERMIT ADMINISTRATIVE TYPE II (A)The project is for a Type II Conditional Administrative Use Permit for the installation of a 275 square foot modular attendant office with upgrades to an existing shipping container to serve as a Household Hazardous Waste collection station. The project entails utility improvements such as a septic tank and a transport line to the existing septic system location onsite on the adjacent county parcel to the east. The site is located in a susceptible aquifer recharge area and an Aquifer Recharge Area report was submitted by GeoEngineers. The project will also involve new site lighting installation and surveillance. Three new parking spaces are proposed to serve the new development. The proposal is exempt from SEPA review under WAC 197-11-800(2)(f). This project requires a Type ll Conditional "C(a)"Administrative Use Permit in accordance with Table 3-1 of the Jefferson County Code Title 18.15.040 for a recycling collection facility in a rural residential 1:5 zone. COMMENT PERIOD AND WHERE TO VIEW DOCUMENTS: The application and any studies may be reviewed at the Jefferson County Department of Community Development. All interested persons are invited to (a) comment on the application; (b) receive notice of and participate in any hearings; and (c) receive a copy of the decision by submitting such written comment(s)/request(s)to the Jefferson County Department of Community Development, Development Review Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450. Comments concerning this application should be submitted to the Department by 4:30 p.m. on May 17, 2017. If the last day of the comment period falls on a weekend or holiday, then the comment period shall be extended to the first working day after the weekend or holiday. Comments submitted after this date may not be considered in the staff report. PUBLIC HEARING INFORMATION: This is a Type II Permit Application that is exempt from SEPA review. There will not be a public hearing unless the final permit decision by the Administrator is appealed to the Hearing Examiner. If an appeal hearing is scheduled, separate notice will be made at least 10 days prior to the hearing. A copy of the staff report will be made available for inspection at no cost at least seven calendar days prior to such a hearing. APPEALS: The final permit decision for this Type II permit application will be made by the Administrator. Parties of record may appeal the decision to the Hearing Examiner within 14 calendar days of the final Notice of Decision. Decisions of the Hearing Examiner may not be further appealed except to Superior Court. Project Planner: Emma Bolin, 360-379-4484 For further information, please visit the Jefferson County Department of Community Development web page at www.co.jefferson.wa.us/commdevelopment/ Please publish one time.PUBLISH DATE:May 3,2017 BILL: Jefferson County Department of Community Development 621 Sheridan Street,Port Townsend,WA 98368 ACCOUNT#15833 JEFFERSON COUNTY PUBLIC NOTICE OF TYPE II LAND USE APPLICATION MLA17-00025 APPLICANT: JEFFERSON COUNTY PUBLIC WORKS PO BOX 1220 PORT TOWNSEND WA 98368-0920 Application Received Date:April 7,2017 Application Complete Date:April 27,2017 Application Notice Date:May 3,2017 SITE ADDRESS AND PROJECT LOCATION: 295312 Hwy 101,Quilcene WA 98376,Parcel Number 702-231-010,Section 23-Township 27N-Range 2w PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES: The project is for a Type II Conditional Administrative Use Permit for the installation of a 275 square foot modular attendant office with upgrades to an existing shipping container to serve as a Household Hazardous Waste collection station.The project entails utility improvements such as a septic tank and a transport line to the existing septic system location onsite on the adjacent county parcel to the east.The site is located in a susceptible aquifer recharge area and an Aquifer Recharge Area report was submitted by GeoEngineers.The project will also involve new site lighting installation and surveillance.Three new parking spaces are proposed to serve the new development.The proposal is exempt from SEPA review under WAC 197-11-800(2)(f).This project requires a Type II Conditional"C(a)"Administrative Use Permit in accordance with Table 3-1 of the Jefferson County Code Title 18.15.040 for a recycling collection facility in a rural residential 1:5 zone. COMMENT PERIOD AND WHERE TO VIEW DOCUMENTS: The application and any studies may be reviewed at the Jefferson County Department of Community Development.All interested persons are invited to(a)comment on the application;(b)receive notice of and participate in any hearings;and(c)receive a copy of the decision by submitting such written comment(s)/request(s)to the Jefferson County Department of Community Development,Development Review Division,621 Sheridan Street,Port Townsend,WA 98368,(360)379-4450.Comments concerning this application should be submitted to the Department by 4:30 p.m.on May 17,2017. If the last day of the comment period falls on a weekend or holiday,then the comment period shall be extended to the first working day after the weekend or holiday.Comments submitted after this date may not be considered in the staff report. Project Planner:Emma Bolin,360-379-4484 For further information,please visit the Jefferson County Department of Community Development web page at www.co.jefferson.wa.us/commdevelopment/ ,_sow c� JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend,WA 98368 I Web:www.co.iefferson.wa.us/communitydevelopment ,67'‘ Tel: 360.379.4450 I Fax:360.379.4451 I Email:dcd a(�.co.lefferson.wa.us SquareONE Resource Center I Building Permits & Inspections I Development Review I Long Range Planning April 24, 2017 Dear Susan Porto, RE: MLA17-00025-ZON17-00010 Jefferson County has forwarded the attached application to you for review and comment because your agency is responsible for determining compliance with state and federal requirements or may otherwise be affected by the following proposal: CONDITIONAL USE PERMIT ADMINISTRATIVE TYPE II (A)for the installation of a 275 square foot attendant office with upgrades to an existing shipping container to serve as a Household Hazardous Waste collection station. The project entails utility improvements such as a septic tank and a transport line to the existing septic system location onsite on the adjacent county parcel to the east. The site is located in a susceptible aquifer recharge area and an Aquifer Recharge Area report was submitted by GeoEngineers. Location: 295312 Hwy 101, Quilcene, WA 98376, APN #702-231-010 and 821073002, 523-T27-R2W Comments must be received within fourteen (14)calendar days or by May 8, 2017. If no written response has been received within fourteen (14) days, your agency will be presumed to have no comments. If necessary, the UDC administrator may grant an extension of time for comment. Please contact at(360)379-4450 if you desire an extension of time or have additional questions regarding this proposal. Thank you in advance for your attention to this matter. Sincerely, Emma Bolin cc: file, Randy Marx ALsoN coy JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend,WA 98368 I Web:www.co.jefferson.wa.us/communitydevelopment Tel:360.379.4450 I Fax: 360.379.4451 I Email:dcdAco.lefferson.wa.us N0 SquareONE Resource Center I Building Permits & Inspections I Development Review I Long Range Planning April 24, 2017 Dear Randy Marx, RE: MLA17-00025 -ZON17-00010 Jefferson County has forwarded the attached application to you for review and comment because your agency is responsible for determining compliance with state and federal requirements or may otherwise be affected by the following proposal: CONDITIONAL USE PERMIT ADMINISTRATIVE TYPE II (A)for the installation of a 275 square foot attendant office with upgrades to an existing shipping container to serve as a Household Hazardous Waste collection station. The project entails utility improvements such as a septic tank and a transport line to the existing septic system location onsite on the adjacent county parcel to the east. The site is located in a susceptible aquifer recharge area and an Aquifer Recharge Area report was submitted by GeoEngineers. Location: 295312 Hwy 101, Quilcene, WA 98376, APN #702-231-010 and 821073002, S23-T27-R2W Comments must be received within fourteen (14)calendar days or by May 8, 2017. If no written response has been received within fourteen (14)days, your agency will be presumed to have no comments. If necessary, the UDC administrator may grant an extension of time for comment. Please contact at(360)379-4450 if you desire an extension of time or have additional questions regarding this proposal. Thank you in advance for your attention to this matter. Sincerely, Emma Bolin cc: file, Susan Porto