NOTES:
I Owners
TOP OF 8'+ BANK
Jerry and Veretta Farrell
421 Griffith Point Road
Nordland, WA 98358
PROP LINE
1�
EX . POND
I n \
EX
WELL Ex. x -~ OVERFOW + \�
x _WELL H0115E
,- - E x . t 1 ��P
i-1000 GAL, TANK p �
PROP05EDI
- - - - - GARAGE
\ \ " + \ O 1
1
3Q
r
30
bOAPLD FENCIE +
DEN ORCHARD x
5 �&pUPPT 1 O
NI
L
i(
1 I•P. (FOUHD0
2. All materials, workmanship, design, and construction shall conform to the drawings, specifications, and the
Uniform Building Code (1991 Edition).
3 Contractor shall be responsible for all safety precautions and the methods, techniques, sequences or
procedures required to perform his work.
4. All concrete shall be mixed, proportioned, conveyed and placed in accordance with the UBC and AC 301.
5. Concrete for bottom slab, walls, and lid shall be fc = 3000 psi at 7 days, high early strength or equivalent
Type I mixture providing the required strength at 7 days, mix shall not contain less than 6 sacks of cement
per cubic yard, shall be proportioned to produce a maximum slump = 5 inches, maximum aggregate size =
3/4 inches. 28 day fc = 4000 psi, minimum. Concrete in the lid/ garage floor shall be sprinkled or
otherwise kept cool and moist during curing for the first 7 days, and under lid support to be left in place
until concrete reaches 3000 psi strength.
Slab on grade shall be constructed as follows 4 inches of compacted crushed rock shall be placed over
undisturbed bearing soil, then covered with 6 mil visqueen and 2 inches of compacted sand Sand shall be
thoroughly wetted prior to pouring.
6. All concrete shall be reinforced. All reinforcing steel shall be deformed billet steel conforming to ASTM A-
615, Grade 40, Fy = 40000 psi, of the size shown on the drawings Reinforcing shall be continuous, laps
shall be 27" minimum, stagger all splices. Provide elbow bars to lap horizontal bars at all corners and
intersections. All steel shall be accurately located in the forms and secured before and during the placement
of concrete by form ties adequate to prevent displacement during construction- Reinforcing steel shall be
covered as follows-
Concrete cast against and exposed to earth, 3"
All other concrete 2"
PROP. UN
\ _ GRAVEL a DR%VE
SITE PLAN
SCALE I ZO'
�e
PARCEL DESC: TAX b 3 5 i?_ TAX -7
SEC 3?, T30N 1 R I E , W.M.
PARCELS NUMBERED- 0213Z 4 Dos ' C 13Z4006
7 An air entraining agent shall be used to provide air entrainment of 5% as specified in Table 26-A-I UBC
(1991),
8 The concrete shall be sealed to prevent migration of water either into or out of the cistern. Waterproofing
shall be applied to both sides of the walls and floor slab, and the top of the slab on grade.
Perimeter footing drains are required. A 4 inch perforated PVC drain line at footing elevation shall be
installed and tightlined to daylight. Free draining backfill, such as pea gravel or drain rock, shall envelope
the PVC drain line and be placed adjacent to the tank to ground surface elevation
9. A gravity drain for maintenance cleaning of the cistern is to be provided at a low elevation in the cistern
adjacent to the pump well. A valve or other suitable device for opening the gravity drain shall be located as
to be accessible from ground elevation.
10. All inlets, vents, and drains shall be screened, trapped, or otherwise protected to preclude introduction of
contaminants into the cistern. The hatch shall be made watertight, to prevent entry of contaminants and
locking to prevent entry by children. A raised lip around the hatch is highly recommended for exclusion of
contaminants.
+