HomeMy WebLinkAboutBLD1994-00694REVISIONS BY
TABLE NO.25.0—NAILING SCHEDULE
o sill or girder. toenail
ing to joist toenail each end
2-8d
6' subfloor or less to each joist, face nail
2-gd
r then 1' x 6' subfloor to each moist, face nail
L$d
bficor to joist or girder. blind and face nail
npla"'.-
:-1plate
to joist or blocking. face nail
16d at 16' o.c.late
to stud, end nail
2-16d
to sole plate
4 8, toenail or
2-16d. end nail
9. Double studs. face nail
16d at 24' o.c.
1 10.Doubled top pla -s. face tail
12. Continuous Fs.ia
along ea`.i L
13. Ceiiing )oj• :, to plate, toenail
header to stud, toenail
4-fld
eiling joists. laps over partitions. face nail
'-1od
r14.ontinuous
eiling joists to parallel rafters. face nail
= -16d
after to plate, toenail3-8d
" brace to each stud and p}a[e, face nail
2-Sd
19. 1" z S' sheathing or less to each beating, face nail
- 8d
20. wider than I" x 9' sheathing to each bearing, face nail
3-ba
21. Built-up comer studs
16d at 2C D.C.
22Built-up girder and beams
2W.at 32" o.c. at top.
and bosom and staggered
2.20d at ends and at
each splice
Mai• }
FRAMING SECTION "A"
� op�frol�iai. �
L'T
Z PAX, �i,AGlHiW:�4 r
wwsG + 0/'f ts- ZIOL
i-i P -f 40',19t".
RIGHTSIDE ELEVATION �____:__
grirOWAL s
r,X'f� MA'fMA1 -
• 1�,Od'GJ1L21N49
if2'ObX P YW00ri
oe
1!I'�� O�i,�• �N'fNC�
epx r�Up• 'Vgv'%o
5 v I'a
�9:
2X �I.OGjcIN6
"X f'y
xeQuilzw ire - oOu
1.b•f A* P11,1
;�REAR ELEVATION --- _ _--_
LEFTSIDE ELEVATION_______--.
I,D u
oe;// (oil Ad.
FRONT ELEVATION
M
I,0 U
2�ri-pll
i
a
FOUNDATION PLAIN
FLOOR PLAN
Garac
i
Scale:1 /4 1'-0"
i.
o
as
M
R1 00
0 � rn T
C] �- o
O
N M O
�Czs00
O
J
a
J
-
a
w
cr
Q
�
N
a
o�
LL
a
Q
Cr
v
Z
to
O
cn
to
co
DRAWN
CHECKED
DATE
SCALE
JOB NO.
SHEET
I
SHEETS OF S
PRINTED ON CLEARPRINT 1000H-8