Loading...
HomeMy WebLinkAboutMLA17-00064 stormwater permit applicationMLA# DEPARTMENT OF COMMUNITY 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 1 Fax: 360.379.4451 Web: www.co.iefferson-wa.us/communitvdevelopment E-mail: dcd@co.ieffers-on.wa.us JEFFERSON covN TM SUPP'LEMENTAIL APPLICA'T'ION i STORMWATER MANAGEMENT PERMIT PROJECT/APPLICANT NAME: Steven P. Barn Applications for grading projects or land -disturbing activities which require a stormwater management permit shall include the following information. This information may also be provided on other diagrams, plans, studies, or attachments submitted with the project application. If so, please indicate such on this permit application. The Administrator may waive specific submittal requirements determined to be unnecessary for review of the application. 1. Source of fill material and deposition of excess material. Please see attached "Supplemental Application - Stormwater Management Permit for Parcel #502291005, Supplemental Answer Sheet' document for response to this question. - 2. Physical characteristics of fill material: Please see attached "Supplemental Apelication - Stormwater Management Permit for Parcel #502291005, Supplemental Answer Sheet' document for response to this question. 71 3. Proposed methods of placement and compaction consistent with the applicable standards in the International Building Code. Place Cha ter 33 of the URC. Minpaction shall be to a minimum of 9 rcent f maximum d nsi .Com action will be completed using the excavator, or as needed, standard compaction equipment, such as grid roller or other mechanical vibrator. 4. Proposed surfacing material. New driveway surfacing will be asphalt pavement over a crushed rock base course: surfacin 1 for the visitor parking / turnaround area will be a 3" surface coat of pervious clean (no fines) 5/8" crushed rock over a pervious fractured basalt rock subgrade, 5. Proposed method(s) of drainage and erosion control. rr �s 6. Methods for restoration of the site. Please see attached "Supplemental Aeplication - Stormwater Management Permit for Parcel #502291005, Supplemental Answer Sheet" document for response to this question. 7. Demonstrate that instream flow of water will remain unobstructed. Please see attached *Supplemental Application - Stormwater Management Permit for Parcel #502291005, Supplemental Answer Sheet' document for response to this question. 8. Demonstrate that erosion and sedimentation from outflow channels will be minimized by vegetation or other means, and demonstrate that pond runoff will be controlled to protect adjacent property damage. F?Iease see attached rr Supplemental Ap #509291005, Supplement -al Answer Sheet" By signing the application form, the applicantlowner attests that the information provided herein is true and correct to the best of their knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. /19 (LANDOWNER OR AUTHORIZED REPRESENTATWE (DATE) G:\PermitCenter\###FORMS##fADRD\Stormwater\stormwater mgmt permit FINAL doc REV 10/20/2014 Page 3 Supplemental Application — Stormwater Management Permit for Parcel # 502291005 — Project / Applicant Name: Steven P. Barnowe- Meyer Supplement Answer Sheet 1. Source of fill material and deposition of excess material. Except for proposed surfacing material, all fill material will be sourced on site, as material excavated during proposed new driveway construction and during leveling of the proposed building site and visitor parking / turnaround area. Excavation cut and fill is not precisely balanced for the proposed development, with some ( approximately 67 cubic yards) excess excavation material anticipated This excess excavation material will be used beneficially as pit -run maintenance surfacing material on an existing low gradient easement road leading into and across nearby Parcel #502294002, also owned by the proponents. Approximately 89 cubic yards of crushed rock will be brought to the site as a base course for paving the proposed driveway, as surfacing for the visitor parking area / turnaround, and for ensuring proper leveling of the proposed building site. This crushed rock will be sourced from an as -yet unidentified commercial quarry. 2. Physical characteristics of fill material. Parcel #502291005 is the site of a former basalt rock quarry operation. This basalt rock source was reported and tested as early as 1911 (Bulletin No. 2, The Road Materials of Washington, pages 96 and 99) as "a fine grained basalt, soft, with average wearing value, low toughness and excellent cementing value. It should make a very good road material for light traffic." The crushed rock to be acquired from a commercial pit will likely be basalt, 5/8" minus for proposed building site and 5/8" clean for surfacing the visitor parking / turnaround area and for the driveway base course. 3. Proposed methods of placement and compaction consistent with the applicable standards in the International Building Code. Please see the response provided on the Supplemental Application — Stormwater Management Permit form for Parcel # 502291005. 4. Proposed surfacing material. Please see the response provided on the Supplemental Application — Stormwater Management Permit form for Parcel # 502291005. 5. Proposed method(s) of drainage and erosion control. As per the Stormwater Calculation Worksheet for Parcel #502291005, approximately 7,248 square feet of new impervious surface will be added to the existing 5,726 square feet of existing impervious surface on Parcel #502291005. The total square footage of impervious surface under proposed developed condition is 12,974, or approximately 9.4% of the entire area of the parcel (138,085 square feet / 3.17 acres). The total area of estimated land disturbance following proposed development is 14,291 square feet, or approximately 10.3%. All remaining undeveloped portions of Parcel #502291005 (approximately 90% of total parcel acreage) will retain their mix of current native forest vegetation cover (approximately 85%) or mixed native / non-native perennial grasses, forbs and low brush groundcover (approximately 5%). Based on these vegetation conditions, Parcel # 502291005, in total, meets the forest or native condition metric under the "Purpose and Definition" of BMP T5.30: Full Dispersion, i.e. "This BMP allows for "fully dispersing" runoff from impervious surfaces and cleared areas of development sites that protect at least 65% of the site (or a threshold discharge area on the site) in a forest or native condition." Applications and limitations under this BMP and specific to full dispersal of runoff from proposed development areas within this parcel are addressed in subsequent paragraphs. The developed site hydrology, as proposed, will not be significantly different from the existing site hydrology, except as noted in following paragraphs below. The rationale for this statement is that, first, the entire area of Parcel #502291005 has generally shallow to very shallow sandy loam topsoil, underlain with fractured basalt rock, 11 to 41 inches in depth, grading into seamed basalt rock beneath. Also, there are no perennial or seasonal freshwater streams, lakes, ponds or wetlands located on or in the immediate vicinity of the parcel; several very small freshwater seeps that surface through small seams in the sloped basalt rock shelves below ordinary high water line of Hood Canal have been noted during the winter months. In summary, it is quite clear that essentially all current stormwater drainage on Parcel #502291005 is below ground, given no evidence of aboveground surface flow, and this is presumably due to the highly fractured basalt and sandy gravel soils. All stormwater runoff from the parcel is presumed to eventually seep or route into Hood Canal or McDaniel Cove. Due to the underlying soil profiles and seamed bedrock, none of the above described current site hydrology is expected to change significantly under developed conditions on Parcel #502291005, except potentially in those areas associated with the three discrete areas of proposed development, which are described more fully below. Still, under developed conditions, all stormwater runoff from the parcel is expected to continue to seep or route through the highly fractured rock / soil profiles and the underlying seamed basalt bedrock into Hood Canal or McDaniel Cove. There are three discrete areas of development proposed for Parcel # 502291005: Area 1) a proposed 12 -foot wide running surface, 130 -foot long driveway, Area 2) a visitor parking / turnaround area, and Area 3) the building envelope for a two-bedroom single- family residence (2,072 square feet (sf) main area / 670 sf garage / 1,012 sf of porches and covered / uncovered decks). Approximately 84% of the total area associated with these three areas of development is included within one 0.44 -acre catchment basin (Basin A), as shown on Map "E". Two of the planned developments - Areas 1) and 2) - reside entirely or almost entirely (-91 % for Area 1)) within Basin A; approximately 63% of the Area 3) building envelope falls within Basin A. The remainder of the Area 3) building envelope resides in two much smaller adjacent catchment basins. As noted in 5. above, the worst case 100 -year, 24-hour stormwater peak discharge from Basin A (the 0.44 -acre catchment basin) under existing conditions is 0.17 cfs; worst case assumes that the entire catchment basin is impervious and has a runoff coefficient of 1.0. This is truly a worst case scenario under existing conditions, since the entire catchment area is not impervious and more realistically has a runoff coefficient, under existing conditions, of approximately 0.45 to 0.65, based on the gravelly, sandy loam soils and light vegetation. In any case, the 100 -year peak discharge from this catchment basis is less than 0.2 cfs (under existing conditions) and will remain less than or equal to 0.2 cfs under developed conditions. Under both existing and developed conditions, the 100 -year, 24-hour stormwater peak discharges of the two other catchment basins in association with Area 3) (see last sentence of previous paragraph), are most definitely less than 0.2 cfs, due to their much smaller acreage within these two catchment basins (as compared to Basin A). For instance, Basin B (see Map "E") is 0.18 acre in size and has a calculated worst case 100 -year, 24-hour stormwater peak discharge under existing conditions of 0.06 cubic feet per second. As noted above, approximately 91 % of the proposed Area 1) development area is located within Basin A, the 0.44 -acre catchment basin. As noted on Map "E", this proposed driveway will be constructed on a fairly steep sidehill slope, climbing from the existing private paved access road up to the level of the proposed Areas 2) and 3) developments. The driveway will have a 12 -foot wide running surface, with a 14 -foot wide prism (including two -foot wide, one -foot deep ditch) for the inslope, ditched segment of the driveway (Station 0+00 to Station 0+50) and a 12 -foot to 12.5 -foot wide prism for the outslope segment of the driveway (Station 0+50 to Station 1+30). The driveway construction method will be cut and fill (roughly 2/3 cut, 1/3 fill) across a sidehill of seamed pillow basalt rock and some in situ but loose fractured basalt, with the fill slopes toed into an ecology block buttress along the existing private paved access road and an existing gentle bench further up and along the lower edge of the driveway. Driveway subgrade will be on-site fractured basalt, with paved (asphalt) surfacing over a crushed rock base course. The LID Performance Standard for use of permeable pavement for the proposed driveway is infeasible, since the driveway gradient must necessarily be greater than 12% due to the alignment and space limitations on the site. Proposed drainage for this driveway: 1) outsloped segment: sheet flow of rainwater / cutslope seepage across the asphalt surfacing to the outsloped fractured basalt subgrade /fill slope, then into underlying natural soil profile; steel u -bar cross drain at lower end of outsloped segment, angled —300 downgrade from perpendicular to capture and route all remaining sheet flow to the outsloped fractured basalt subgrade / fill slope, then into underlying natural soil profile; 2) insloped ditched segment: sheet flow of rainwater / cutslope seepage across the asphalt surfacing to the fractured basalt subgrade / seamed pillow basalt ditch; 3) an 8" plastic corrugated cross -drain installed beneath new driveway in an upgraded (i.e. deeper, improved cross-section) ditch line of the existing paved private access road. As noted above, the ditch on the upslope edge of the existing paved private access road will be upgraded, with a deeper, improved cross-section, both above and below the inlet and outlet of the planned plastic corrugated cross -drain culvert in the new driveway. The ditch will also be upgraded for a short distance into adjacent Parcel #502294001, under terms of the private access road easement to maintain continued ingress and egress into Parcel #502291005. With the planned road prism geometry (insloped and ditched segment; and outsloped segment), a fractured basalt rock / seamed pillow basalt subgrade, the underlying fractured and seamed basalt soil profile beneath the planned driveway and the planned new and upgraded drainage structures, this Area 1) developed area is expected to have the same or very similar hydrology as the existing hydrology in the area of this planned driveway. As noted above, the proposed Area 2) development area is located entirely within Basin A, the 0.44 -acre catchment basin. Currently, the proposed Area 2) development area is a relatively flat / gently sloped bench / pit floor created during former rock quarry operations, with a 10-12 foot tall rock pit face upslope and outside planned development (see Map "E"). Almost the entire area is covered with loose fractured basalt rock or highly fractured basalt bedrock, with little to no topsoil at all, supporting a 2-3 inch thick layer of moss and a few scattered, escaped invasive perennial "Keys of Heaven" plants. Stormwater percolates readily and directly into the fractured rock surface of this area. Under the proposed development of this area (as a visitor parking / turnaround area) , the existing bench will be reshaped by cutting and filling to create a slightly insloped bench with a two -foot wide, one -foot deep invert / dispersal drain at the toe of the upslope old pit face. The subgrade surface of this insloped bench and invert / dispersal drain will continue to be highly pervious fractured basalt rock, with a thin (3") surface coat of pervious clean (no fines) 5/8" crushed rock on the insloped bench as a use surface. Any runoff from the visitor parking / turnaround area that does not percolate into the underlying fractured and seamed basalt soil profile will be routed to the invert / dispersal ditch. At the end of this dispersal ditch, runoff will empty onto a native forest vegetated flowpath of 50 to 70 feet in length (BMP T5.30: Full Dispersion). With a fractured basalt rock subgrade, clean crushed rock surface, insloping to direct any surface water (if it does not percolate through the finished subgrade and surfacing) into a fractured rock dispersal drain, the underlying fractured and seamed basalt soil profile and finally utilization of BMP T5.30, this Area 2) developed area will have the same or very similar hydrology as the existing hydrology in the area of this planned visitor parking / turnaround. Portions of the lower edge of the visitor parking / turnaround area (above the top of the cutslope of the driveway) will be buttressed with ecology blocks, leveled on bedrock and stacked up to two blocks high. As noted above, the proposed Area 3) development area is located within three catchment basins. Approximately 63% of Area 3) falls within Basin A, the 0.44 -acre catchment basin; approximately 31 % falls within Basin B and the remaining 6% falls within an unnamed basin which incorporates the existing two-bedroom septic system built on-site (see Map "E"). Currently, the proposed Area 3) development area is also a relatively flat /gently sloped bench / pit floor created during the former rock quarry operations on Parcel #502291005. Four soil pit logs (dated 7-20-94) from within this proposed single-family residence / garage building envelope indicate a first horizon of a brownish tan sandy topsoil from a minimum 3 inches to a maximum 10 inches in depth. The second horizon is brown fractured basalt, from a minimum 29 inches to a maximum 41 inches in depth. The third horizon is gray solid, seamed basalt rock. All four of these soil pits are located within the northernmost third of the proposed building envelope. There are no other soil pits within the proposed building envelope. Seamed pillow basalt bedrock is also visible on the surface in a very small area at the southernmost extent (and highest point) within the proposed building envelope. Currently, there is no evidence of concentrated or diffuse stormwater surface flow within the proposed building envelope, even at the site of the exposed seamed pillow basalt. Currently, stormwater percolates readily and directly into the fractured rock surface within the envelope. Under the proposed development, the relatively flat / gently sloped bench / pit floor within the building envelope will be cleared and reshaped by cutting and filling for construction of a single-family, two-bedroom residence with garage and covered / uncovered decks, all on a concrete slab foundation. At the upslope edge of the planned building envelope, a catchment / dispersal trench will be dug to a depth below the planned concrete slab foundation to intercept and disperse any incidental upslope surface / subsurface stormwater drainage which might potentially compromise the foundation slab, as an additional level of slab protection. This catchment / dispersal trench will be dug into fractured / seamed basalt, so is not expected to concentrate or hold stormwater, but rather facilitate subsurface infiltration well below the elevation of the foundation slab. Beyond the upper edge of the planned building envelope, this trench will be extended to connect with the two -foot wide, one -foot deep invert / dispersal drain associated with the planned visitor parking / turnaround area (described two paragraphs above). Portions of the lower edge of the building envelope will be buttressed with ecology blocks, leveled on bedrock, and stacked at little as one block high up to three blocks high at one corner. As per the "Stormwater Calculation Worksheet" for Parcel #502291005, the total impervious roof area of the residence / garage / covered decks will be 3,284 square feet, with an additional 288 square feet of impervious uncovered concrete slab deck or composite deck. The stormwater runoff of all 3,572 square feet of these impervious roof / deck surfaces is eligible for full dispersal under BMP T5.30: Full Dispersion, based on the site and downslope flowpath conditions associated with the proposed structure and planned stormwater runoff control, described more fully below. As to potential limitations under BMP T5.30, dispersion devices are not ordinarily allowed in critical area buffers or on slopes steeper than 20%. First, it should be noted that over 99.8% of the entire parcel resides within critical area buffers or other setbacks. However, on this site, confidence is very high that the proposed dispersion strategies and devices will have no negative impacts on habitat, functionality, or resources within the critical area buffers or on the current high stability of steep slopes, based on the existing on-site geology and site hydrology. The following describes the planned stormwater runoff control devices, the flowpath conditions and the projected impacts on site hydrology following planned development of Area 3). See Map "E". Stormwater runoff from the 288 square feet of impervious uncovered concrete slab / composite deck will be routed and dispersed into a native forest vegetated flowpath of approximately 84 feet in length to the ordinary high water line (OHWL) of Hood Canal. Approximately 1,463 square feet of impervious roof runoff will be dispersed into native forest vegetation areas via three roof downspouts with downspout extensions emptying onto splashblocks, with 80 to 120 feet of native forest vegetated flowpaths to the OHWL of Hood Canal. Approximately 410 square foot of impervious roof runoff will be dispersed via a single roof downspout with an approximate extension of 68 feet of 4" diameter flexible black plastic pipe emptying onto a splashblock, with 60 feet of native forest vegetated flowpath to the OHWL of Hood Canal. Approximately 1,001 square feet of roof runoff will disperse into native forest vegetation areas via two roof downspouts which empty into the two -foot wide, one -foot deep fractured rock invert / dispersal drain associated with the planned visitor parking / turnaround area, described four paragraphs above. This invert / drain of approximately 70 feet in length empties onto a native forest vegetated flowpath of approximately 70 feet in length to north property line of Parcel # 502291005. A cistern or cisterns may also be incorporated into the final design for managing the roof runoff from the above mentioned 1,001 square feet of impervious roof; if installed, runoff from this section of roof would be intermittently routed to cisterns for storage and nonpotable outdoor uses such as irrigation, utilizing BMP T5.20: Rainwater Harvesting. One final roof downspout will disperse approximately 410 square feet of impervious roof runoff via an approximately 60 foot extension of 4" diameter flexible black plastic pipe emptying onto a splashblock, with approximately 90 feet of a flowpath of mixed native forest vegetation / mixed native / non-native perennial grasses, forbs and low brush groundcover to the OHWL of Hood Canal. All of the flowpaths, described above, reside within portions of the parcel that retain well over 65% of native forest condition or are being managed to that condition via native tree reforestation. There is high confidence that proposed best management practices utilized for each of the three planned development areas, described above, will be effective in controlling stormwater flows from developed impervious surfaces on this site. 6. Methods for restoration of the site. As previously noted there are no perennial or seasonal freshwater (or saltwater) wetlands located on or in the immediate vicinity of Parcel #502291005, and thus there are no actions required to be performed to reestablish wetland functional characteristics and processes that have been lost by alterations or activities associated with the proposed developments for this parcel. 7. Demonstrate that instream flow of water will remain unobstructed. As previously noted, there are no perennial or seasonal freshwater streams, lakes, ponds or wetlands located on or in the immediate vicinity of the parcel, so there is no instream flow of water that will be obstructed. 8. Demonstrate that erosion and sedimentation from outflow channels will be minimized by vegetation or other means, and demonstrate that pond runoff will be controlled to protect adjacent property damage. As previously noted, there are no perennial or seasonal freshwater streams, lakes, ponds or wetlands located on or in the immediate vicinity of the parcel. All stormwater runoff from the parcel is presumed to eventually seep or route into Hood Canal or McDaniel Cove. All current stormwater drainage on Parcel #502291005 is below ground, given no evidence of aboveground surface flow, and this is presumably due to the highly fractured basalt and sandy gravel soils. No outflow channels or pond runoff will exist under developed conditions. The only drainage structures that will exist following development are 1) an upgraded ditch on the upslope edge of the existing paved private access road (with a deeper, improved cross-section than the existing ditch); 2) an 8" inside diameter plastic corrugated cross -drain culvert positioned in this drainage ditch under the new driveway; 3) a new 50 -foot segment of ditch along the new driveway; and 4) steel u -bar cross drain at lower end of outsloped segment of the new driveway. The existing ditch will also be upgraded for a short distance into adjacent Parcel #502294001, under terms of the private access road easement to maintain continued ingress and egress into Parcel #502291005. Within Parcel #502294001, the existing (and upgraded) ditch only extends approximately 20 feet. There is no visible evidence of any channelization where this ditch ends. The volume of stormwater delivered from this ditch on Parcel #502291005 and the stormwater of adjoining upslope portions of Parcel #502294001 has not been substantial enough to create a channel on Parcel #502294001 beyond the end of the ditch. At the point where the ditch peters out one can observe the contours of the forest floor where stormwater would logically flow over the surface of the vegetated forest floor if surface flow existed. Continuing to follow the topography within Parcel #502294001 downslope from the end of the ditch (for a total length of 300 feet from the property line) leads one to a fairly deep and large (4' to 8' deep by 15' to 30' wide by 100 ' long) depression area along the upper edge of the paved private access road. The inland upslope edge of this depression is defined by basalt rock faces. Observation indicates that the depression itself only contains water when saltwater seeps through the large basalt cobble fill of the paved private access road at very high tides, and then empties when such very high tides ebb. If stormwater runoff ever actually gets to this depression, it evaporates or percolates into the fractured bedrock or seeps under / through the fill of the paved private access road as groundwater into McDaniel Cove. There is no evidence of channelization on Parcel #502294001 at any point from the end of the ditch to the opening of this large depression area. All other drainage on Parcel #502291005 appears to be below ground, given no evidence of aboveground surface flow, presumably due to the highly fractured basalt gravel soils, and developed hydrology is expected to be quite similarly below ground. There is high confidence that proposed best management practices utilized for each of the three planned development areas will be highly effective in controlling stormwater flows, minimizing erosion / sedimentation from developed impervious surfaces on this site and protect adjacent properties from any damage from runoff. DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 1 Fax: 360.379.4451 Web: vtnvtt .t o.icflersorl-w-tls�Cnmsntptit} dc� < loltnaci i t E-mail: [icdi�crs,jt ffcrarart.�Ja.us STORMWATER CALCULATION WORKSHEET MLA# PROJECT/APPLICANTNAME: t1 'li1 P• 8arilwe- L"IfU' DETERMINING STORMWATER MANAGEMENT REQUIREMENTS: This stormwater calculation worksheet should be completed first to classify the proposal as "small," "medium," or "large." The size determines whether a Stormwater Site Plan is required in conjunction with a stand-alone stormwater management permit application, building permit application, or other land use approval application that involves stormwater review. The basic information will also be helpful for completing a Stormwater Site Plan, if required. PARCEL SIZE (I.E., SITE) Size of parcel 3.17 acres An acre contains 43,560 square feet. Multiply the acreage by this figure. Size of parcel in square feet 138,085 sq/ft Land -disturbing activity is any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and non -vegetative) and/or the existing soil topography. Land disturbing activities include, but are not limited to clearing, grading, filling, excavation, and compaction associated with stabilization of structures and road construction. Native vegetation is vegetation comprised on plant species, other than noxious weeds, that are indigenous to the coastal region of the Pacific Northwest and which reasonably could have been expected to naturally occur on the site. Examples include species such as Douglas fir, western hemlock, western red cedar, alder, big -leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; herbaceous plants such as sword fern, foam flower, and fireweed. LAND DISTURBING ACTIVITY, CONVERSION OF NATIVE VEGETATION, AND VOLUME OF CUT/FILL Calculate the total area to be cleared, graded, filled, excavated, and/or compacted for proposed development project. Include in this calculation the area to be cleared for: Construction site for structures 3,600 sq/ft Drainfield, septic tank, etc. Well, utilities, etc. 0.0 WK sq/ft sq/ft Driveway, parking, roads, etc. 4,965 sq/ft Lawn, landscaping, etc. 1 1 Other compacted surface, etc. 0 Total Land Disturbance 8,565 sq/ft sq/ft sq/ft Answer the following two questions related to conversion of native vegetation.- Does egetation: Does the project convert'/ acres or more of native vegetation to lawn or landscaped areas? Circle: Yes (9 Does the project convert 2 % acres or more of native vegetation to pasture? Circle: Yes 0 Indicate Total Volumes of Proposed: Cut 268 Fill 290 (cu/yd) Impervious surface is a hard surface that either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A hard surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces which similarly impede the natural infiltration of stormwater. stormwater talc worksheet — REV. 10/20/2014 NEW Structures (all roof area) Sidewalks Patios Solid Decks (without infiltration below) STORMWATER CALULATIONS — IMPERVIOUS SURFACE 3,284 sq/ft 0 sq/ft 288 sq/ft 0/ft Driveway, parking, roads, etc Other 3,676 sq/ft sq/ft Total New 7,248 sgdit TOTAL NEW + TOTAL EXISTING' 12,974 sglft EXISTING Structures (all roof area) 0 sq/ft Sidewalks Patios Solid Decks (without infiltration below) 0 sq/ft 0 sglft n Driveway, parking, roads, etc 5,630 sglft Other 96 sq/ft Total Existing 5,726 sqlft 'This amount Will be used to check total lot coverage. The following questions will help determine whether the proposed project is considered development or redevelopment. DEVELOPMENT v. REDEVELOPMENT Divide the total existing impervious surface above by the size of the parcel and convert to a percentage: 4. 1 % Does the site have 35% or more of existino impervious surface? Circle: Yes 11 No 121 FURTHER INSTRUCTIONS: If the answer is yes, the proposal is considered redevelopment and the attached Figure 2 should be used to determine the applicable Minimum Requirements. If the answer is no, the proposal is considered new development and the attached Figure 1 should be used. At this juncture, the applicant should refer to the applicable Flow Chart to determine the Minimum Requirements for stormwater management. DCD staff will help verify the classification of the project and the application requirements. For proponents of "small" projects who must comply only with Minimum Requirement #2—Construction Stormwater Pollution Prevention—an additional submittal is not required. The proponent is responsible for employing the 12 Elements to control erosion and prevent sediment and other pollutants from leaving the site during the construction phase of the project. Pick up the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet. Proponents of "medium" projects—those that must meet only Minimum Requirements #1 through #5—and for "large" projects—those that must meet all 10 Minimum Requirements—are required to submit a Stormwater Site Plan. DCD has prepared a submittal template of a Stormwater Site Plan, principally for rural residential projects. Complete the template in the Stormwater Site Plan Instructions and Submittal Template or prepare a Stormwater Site Plan using the step-by-step guidance in the Stormwater Management Manual. APPLICANT SIGNATURE By signing the Stormwater Calculation Worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. -2��/o &Oikm�e - (LANDOWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE (DATE) FOR OFFICE USE ONLY SMALL MEDIUM LARGE REDEVELOPMENT Stormwater Site Plan: Yes No stormwater talc worksheet — REV. 10/20/2014 1 ,,- EXISTING APPROXIMATE LOCATION EXISTING FENCE OF EXISTING 10' X 20' WALKWAY PRIMARY BED Appro�„rk Proposed a rr (SEP94-00461) / Nephonc Con new l� O-W �� C �j si 3 p S . APPROXIMATE LOCATION LEGEND EDGE EXISTING P T$PaSe{l h� t 5 L r roll � � � 1 u f' OF EXISTING 12.5' X 16' ASPHALT 01 SURE EXISTING L � d '� SAND FILTER 1 EXISTING BACKHOE SOIL HOLE OBSERVED: 5�gUC r POWER I e��� (SEP94-00461) BY CDS ON 10/20/16. HOLE LOCATIONS POLES ARE APPROXIMATE ONLY AND ARE NOTEXISTING EXISTING CONTROL PANEL BASED ON AN ACTUAL SURVEY. ` ” WATER — (SEP94-00461) VALVE. EXISTING _ 0- 0 EXISTING 1,000 GALLON 0 @4SEM£NT EXISTING ROCK 1 0 d s _ PUMP CHAMBER p -. 6 -.. .ALL. � (SEP94-00461) U 1_�h1- l P.a2i1lft' P° f IS Ih{rrp r�f1e� QS x��Y_ :r rte,�', "^ i�[r ✓ � � `p a 1r ` EXISTING 1.000 GALLCNI Pip- " r 'a..sct50?,?qLbS EPTIC TA + r ZP A(SEP94 N S?) 1 APPROXIMATE j � ^� ty C. o i "► f� Ck 1 1 A ro K r m A,1 r 1 o co o r W I {OorR r P 0rl ( P b PROPERTY LINES �''• r; `t ! 0 f G�vc :I P-Y;Ait • i £Xl ! I P. (.1 SDA SCS , ,� - e) , WATC ' ' ; fx; s �l n of � I 1p 1, iro `r� t` �¢ ,� c++ , .. P P f gtf 1f'a IvaP �� � .�' � �-='�-- . `` � / � � � - ` , CDun b� U.P9rOLAtof - iFi r ,. R'jnJ6 1 111 f rZn n s 9 na£!L p P I .�P�Tbr` f'rD oscc� 8' eco �• t CorrA 0,+ed pla t�� x` Rr� "ir � 4 r g - Q so crossV� foj OT1 crid � r.�_ skie �',��o � e �r�l r>7 -_'� F'p ZID "5 �� j C-fl+ d r ( APPROXIMATE SHORELINE PM , ► � A � 0 3 G � r� PER COUNTY PARCEL MAP scuE ov �r DS �G 3" , ''� Ij`I r� (D. � al't CP,hAvKtNj ( � ` - `.�.UZ ,. �xrsfiry ouGnc�rzGi powcr� bay r Iecn !fit --�- - r' °,s `'9 �� I �\� F�fephon� uiillF IirZl j� CENTERLINE OF EXISTING RIGHT OF WAY` I - �q �/ \t.`t&,� �'✓ r 1 I Yt % q Ntyhw 10 I t w 1 2A \ `` 1 n, � `' ' f�7d17i�", r�:l. } - - ot„Jkr, L. �\ '�. n ve ``-�� .. \ '���1 .t ink- �'G3q• ` PROPOSED BUILDING ENVELOPE 5AAPR- ¢ : PROPOSED 10090 + RESERVE 7 DRAINFIELD AREA /6C (1, 160 SQUARE FEET) C) February 10, 2017 4:32:45 p.m. NN EXISTING ACCESS ROUTE APPROXIMATE Drawing: BARNOWE-MEYER 502291005.DWG.DWG PROPERTY LINES D CREATIVE DESIGN SOLUTIONS, INC. 2017 REVISION S'& PlA,% bek, ! IN DATE V af7 PARCEL} � 502291005 37 OK M WA SI re. P<.AN "pE TAI L" PAP MW P 'I E CREATIVE DESIGN SOLUTIONS DRAWN BY: MICHAEL S. DEENEY SITE PLA DETAIL, 30 SCALE �r Septic sysrem Designs, Permlfs, d Inspections FOR: STEVEN BARNO WE- MEYER Sltl_ R D D R ESS 3 ! Z �l0 3 11,'9h w 1 U I �W P.O. BOX 2787, PORT ANGELES, WASHINGTON 98362 SHEET 1 OF 1 DATE: 2/JD/�7 (jri&ovi WR ` ?320 29(25-2W) '(" (800) 395-7296, (360) 457-6353, EMAIL: MIKE@CDS4YOU.COM