Loading...
HomeMy WebLinkAbout101617_ca01Department of Public Works Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Engineer' ilk Agenda Date: October 16, 2017 } f, Subject: Authorization of Change Order #3 with Shold Excavating, Inc. Rick Tollefson Memorial Trail, Phase I Project, Co. Rd. No. 850100, CR1815 Statement of Issue: Authorization of Change Order #3 for the Rick Tollefson Memorial Trail, Phase I Project, CR1815 with Shold Excavating, Inc. in the amount of $6,000.00. Analysis/Strategic Goals/Pros & Cons: This change order is necessary to pay for costs for the added privacy fence, the added pedestrian bridge concrete deck color admixture, and a credit for the non -epoxy coated steel reinforcement in the precast concrete bridge abutments. Fiscal Impact/Cost Benefit Analysis: The cost of this change order is $6,000.00 and 1 working day. Recommendation: Public Works recommends that the Board authorize Change Order No. 3 and return two signed originals of each to Public Works for further processing. Department Contact: John Wayand, Project Manager, 385-9377 Revi _ y. -e/__5;V lfll� PhrCip Morley,' twnty A /ministrator JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Date: 9/29/2017 CHANGE ORDER NO. 3: PARTS 1, 2, AND 3 Ordered by County Engineer under terms of X Section 1 - 04.4 of the Standard Specifications Change proposed by Contractor To: Shold Excavating, Inc. P.O. Box 179 Endorsed by: S -hold Excavating, Inc. .. ._._ _.... 121 Pomwell Road Contractor Firm Name Port Hadlock, WA. 98339 Project Title: - Signature Title Consent given by Surety: (when required) Contract No. CR1815 By Rick Toliefson Memorial Trail, Phase 1 Attorney-in-fact You are ordered to perform the following described work upon receipt of an approved copy of this change order: All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. This contract is revised as follows: X Section I - 04.4 of the Standard Specifications PART 1 • Replace approximately 150 LF of Farm Fence with approximately 150 LF of new Privacy fence Privacy Fence to be 6' tall and all cedar except the posts. Fence posts to be 4"x4" (min.) pressure treated ACQ fir or hem -fir and set in concrete. Privacy Fence to be installed from station 25+50t to station 27+00± right, per the following new contract item and price: Approval of source and Acceptance will be per WSDOT Local Agency Guidelines, Appendix 52.107 Exceptions to the WSDOT Construction Manual - Fencing. Item 37 Farm Fence, $11.00 LF, -$1,650.00 decrease Item 50 Privacy Fence, $39.00 LF, +$5,850.00 increase • Estimated net cost increase is $4,200.00 • Change in Contract Time: 1 additional Working Day X Section l - 04.4 of the Standard Specifications - PART 2 - • Item 12 Prefabricated Pedestrian Bridge, 1 EA. - This change order adds color to the cast -in-place concrete decking for the Prefabricated Pedestrian Bridge as follows: The contract Special Provisions are changed as follows: Special Provision 6-03.3 Construction Requirements Prefabricated Pedestrian Bridge Add the following paragraph to this section: The cast -in-place concrete decking shall be colored_ with one of the following concrete coloring admixtures manufactured by one of the following companies or an approved equivalent. - 1. Davis Color, Pueblo Brown 61078, 2.5# in concrete. 2. Butterfield, Uni-Mix Integral Concrete Colorant, U -26 -Lannon Stone 3. Scofield, Lithochrome Color Hardener, 5758 Weathered Sage • Estimated net cost increase is $2,000.00 • Current Unit Contract Price $113,300.00, New Unit Contract Price $115,300.0.0 • Change in Contract Time: 0 additional Working Days u< LM :K[Change proposed by Contractor PART 3 • Item 12 Prefabricated Pedestrian Bridge, 1 EA. The abutment rebar is changed from epoxy coated ASTM A934 as shown on the approved Bridge Abutment plan sheet 1 of 2, to non -epoxy coated ASTM A615 as shown on the revised approved Bridge Abutment plan sheet 1 of 2. • Estimated net cost decrease is $200.00 • Current Unit Contract Price $115,300.00, New Unit Contract Price $115,100.00 • Change in Contract Time: 0 additional Working Days Approval required CONTRACT CONTRACT AMOUNT AMOUNT County Engineer $557,319.00 $583,769.80 ORIGINAL CURRENT CONTRACT TIME CONTRACT TIME (Working days) (Working Days) 67 days 71 days APPROVAL RECOMMENDED 44 /G4 - 2 f 17 roiect Manarer I Date Services Date ESTIMATED NET ESTIMATED CONTRACT CHANGE THIS ORDER TOTAL AFTER CHANGE $6,000.00 $589,769.80 Change in contract time New Contract time this Change Order (Working Days) (Working Days) 1 day- ---' 72 days Date APPROVED Chair, Jefferson County Commissioners Date M b O O O O O O O O M p LLIF' -1 F-' 00 V) O k 00 O M O Ci N r+ ¢ O F z N kr �. f3i1 6H 64 6R a z ¢ 0 0Lij 0 0 0 0 ¢ = 0 O o z O ¢ vi N � o O y ¢ U b9 6H b9 ... Go� U LLI U p U O [- F- ff3 O O _Ob N m Q U U C 69 64 fH O O O O F iM o O z rq C:) 0 0 Q v o 0 0 ¢ z L a < U M O O O E- � N O O z p � m o' 0-4 0 0 0 0 M � y A 69 Gn �d d W W O0. C W M C3 CA A w L U N L p u. u j z 4 . U U , rn ai InO Mtn �i N Ri N v, o, Ia a