Loading...
HomeMy WebLinkAbout101617_ca03Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Enginee*— r Agenda Date: October 16, 2017 Subject: Project Prospectus and Local Agency Agreement Supplement No. 1 for the Washington State Dept. of Transportation (WSDOT), Upper Hoh Road MP 9.7-9.8 Emergency Repair, County Project No. 18019880, Federal Aid No. ER -1601(016) Statement of Issue: The attached Project Prospectus and Local Agency Agreement Supplement are necessary to obtain federal funding to prepare required follow-up environmental documentation and permitting. Analysis/Strategic Goals/Pro's Et Con's: During a February 2016 storm event, the Hoh River eroded the roadway prism at Upper Hoh Road MP 9.7-9.8. Emergency repairs were completed, consisting of constructing an armored rock toe, reconstructing the upper slope with gravel borrow and topsoil, replanting native trees and shrubs, restoring the road shoulder, and installing concrete traffic barrier. Emergency approvals were obtained at the time from the Wash. Dept. of Fish and Wildlife, Army Corps of Engineers, and various other agencies. Jefferson County has recently been notified by the Army Corps of Engineers that the emergency project requires follow-up permitting through the normal process, including National Environmental Policy Act (NEPA) compliance documentation. The Local Agency Agreement Supplement is necessary in order to follow through with this requirement. Fiscal Impact/Cost Benefit Analysis: The estimated cost of the follow-up permitting is $66,602. This work will be funded at 86.5% by the Federal Highway Administration and 13.5% by the County Road fund. Recommendation: The Board is requested to sign the three originals of the Project Prospectus and the Local Agency Agreement, and return to Public Works. Department Contact: Mark Thurston, P.E., Project Manager, 385-9160. Reviewed By: 4 �J V t flip Morley, 6o.unty Administrator Date Admkk Washington State wo Department of Transportation Local Agency Federal Aid Project Prospectus DOT Form 140-101 ♦ Previous Editions Obsolete ♦ Page 1 Revised 04/2015 Date 8/28/2017 Prefix Route DUNS Number 179278197 Federal Aid Pro'ect Number ER -1601(016) A160 Local Agency WSDOT Federal Employer Promect Number 18019880 (Use Only Tax ID Number, 91-6001322 Agency CA Agency Federal Program Title Jefferson County Public Works ® Yes ❑ No ® 20.205 ❑ Other Project Title Start Latitude N47-48-36.52 Start Longitude W124-04-48.47 Upper Hoh Road MP 9.7-9.8 Emergency Repair End Latitude N47-48-37.71 End Longitude W124-04-44.45 Project Termini From - To Nearest City Name Project Zip Code (+ 4) Upper Hoh Rd MP 9.7 Upper Hoh Rd MP 9.8 Forks 98331-9454 Begin Mile Post End Mile Post Length of Project Award Type MP 9.7 MP 9.8 1 0.1 ® Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 914207 MP 9.7 MP 9.8 1 N/A 16 Jefferson WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number Olympic Region 24 6 N/A Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P.E. $66,602 $8,991 $57,611 10/2017 RNV Const. $171398 $0 $171398 2/2016 Total $238,000 $8,991 $229,009 Description of Existing Facility (Existing Design and Present Condition Roadway Width Number of Lanes 22 feet 2 The existing roadway is a paved, two-lane major collector with 35 mph posted speed. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Emergency repair was completed in 2016, which consisted of installing armored bank protection below the 100 -year flood elevation, and reconstructing the upper slope with gravel borrow and topsoil. Repair work also included replanting the upper slope with native shrubs and trees, restoring the road shoulder, and installing concrete barrier. Remaining work consists of preparing the NEPA documentation and permitting for the ER project, as required by the permitting agency. Local Agency Contact Person Title Phone Monte Reinders, P.E. Public Works Director/Count Engineer 360-385-9160 Mailing Address City State Zip Code 623 Sheridan Street Port lomaiWnd WA 98368 By / Project Prospectus Approval �� ority Title Public Works Director/County Engineer Date % S / 7 DOT Form 140-101 ♦ Previous Editions Obsolete ♦ Page 1 Revised 04/2015 Agency Project Title Date Jefferson County Public Works Upper Hoh Road MP 9.7-9.8 Emergency Repair 8/28/2017 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 22 feet 2 ❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ® Other ❑ Bridge Geometric Design Data Preliminary Engineering Will Be Performed By Others Agency Consultant/Agency 75 % 25 % Description Agency Through Route % Crossroad Federal Functional® Classification ❑ Urban Rural ❑ NHS ❑ Principal Arterial ❑ Minor Arterial Collector El Collector ® Major Collector El Minor Collector ❑ Local Access ❑ Urban Rural El NHS ❑ Principal Arterial ❑ Minor Arterial ElCollector El Major Collector ❑ Minor Collector ❑ Local Access Terrain ❑ Flat ® Roll ❑ Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed 35 35 - ----- — -------- - ---- - Desi n Speed Existing ADT Design Year ADT 550 675 Design Year 2032 Design Hourly Volume (DHV) 70 Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant/Agency 75 % 25 % Construction Will Be Performed By Contract Agency Contractor 100 % % Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ® Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement Environmental Considerations After -the -fact environmental documentation, and permitting are being required by the U.S. Army Corps of Engineers. DOT Form 140-101 Page 2 Revised 04/2015 ♦ Previous Editions Obsolete Agency Project Title 1 Date Jefferson County Public Works Upper Hoh Road MP 9.7-9.8 Emergency Repair 8/28/2017 Right of Way ® No Right of Way Needed I ❑ Right of Way Needed * All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the existing right of way. Utilities Railroad ® No utility work required ® No railroad work required ❑ All utility work will be completed prior to the start of the ❑ All railroad work will be completed prior to the start of the construction contract construction contract ❑ All utility work will be completed in coordination with the ❑ All railroad work will be completed in coordination with the construction contract construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project none FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ® No Remarks No comments This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Date Agency By Mayor/Chairperson jo�d a to orm: q Date: l Philip C Hunsucker, Chief Civil Deputy Prosecuting Attorney DOT Form 140-101 EF Jefferson County Prosecuting Attorney's Office Revised 04/2015 ♦ Previous Editions Obsolete ♦ Page 3 Local Agency Agreement Supplement Agency Supplement Number Jefferson County Public Works 1 Federal Aid Project Number Agreement Number CFDA No. 20.205 ER -1601(016) LA 8904 (Catalog of Federal Domestic Assistance) The Local Agency requests to supplement the agreement entered into and executed on June 10, 2016 All provisions in the basic agreement remain in effect except as modified by this supplement. The change to the agreement are as follows: Project Description Name Upper Hoh Road MP 9.7-9.8 Emergency Repair Termini Upper Hoh Road MP 9.7 to MP 9.8 Description of Work ❑ No Change Length 0.1 Complete the required formal NEPA documentation and permitting for the ER project as required by the permitting agency. Reason for Supplement Preparation of NEPA documentation and permitting is categorized as Preliminary Engineering (PE). It is necessary to transfer funds from Construction to PE to fund the NEPA documentation and permitting. Are you claiming indirect cost rate? ❑ Yes ✓ No Project Agreement End Date December 31, 2024 Does this change require additional Right of Way or Easements? ❑ Yes ✓ No Advertisement Date: n/a The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washington State Department of Transportation By Title roved !! ' CC. Date: J/� Philip C. Hunsucker, Chief Civil Deputy Prosecuting Attorney Jefferson County Prosecuting Attorney's Office By Director, Local Program Date Executed Page 1 Estimate of Fundin Type of Work (2) ) Previous Supplement Estimated Total Estimated) Agency EstimatedFederal A reement/Su I. Project Funds Funds Funds PE 86.5 % a. Agency 18,758.00 18,758.00 2,532.33 16,225.67 b. Other Consultant 41,844.00 41,844.00 5,648.94 36,195.06 Federal Aid c. Other 0.00 Participation Ratio for PE d. State 6,000.00 6,000.00 810.00 5,190.00 e. Total PE Cost Estimate a+b+c+d 0.00 66,602.00 66,602.00 8,991.27 57,610.73 Right of Way 0.00 f. Agency Q. Other 0.00 Federal Aid h. Other 0.00 Participation Ratio for RW i. State 0.00 '. Total RM Cost Estimate f +h -H 0.00 0.00 0.00 0.00 0.00 Construction k. Contract 213,000.00 -61,352.08 151,647.92 151,647.92 o I. Other 0.00 m. Other 0.00 Federal Aid n. Other 0.00 Participation Ratio for CN o.Agency 20,000.00 -5,249.92 14,750.08 14,750.08 p. State 5,000.00 5,000.00 5,000.00 q. Total CN Cost Estimate(k-H+ +n+o 238,000.00 -66,602.00 171,398.00 0.00 171,398.00 r Total Pro'ect Cost Estimate e+ 238,000.00 0.00 238,000.00 8,991.27 229,008.73 The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washington State Department of Transportation By Title roved !! ' CC. Date: J/� Philip C. Hunsucker, Chief Civil Deputy Prosecuting Attorney Jefferson County Prosecuting Attorney's Office By Director, Local Program Date Executed Page 1 Agency Supplement Number Jefferson County Public Works 1 Federal Aid Project Number Agreement Number CFDA No. 20.205 ER -1601(016) LA 8904 (Catalog of Federal Domestic Assistance) VI. Payment and Partial Reimbursement The total cost of the project, including all review and engineering costs and other expenses of the State, is to be paid by the Agency and by the Federal Government. Federal funding shall be in accordance with the Federal Transportation Act, as amended, 2 CFR Part 200. The State shall not be ultimately responsible for any of the costs of the project. The Agency shall be ultimately responsible for all costs associated with the project which are not reimbursed by the Federal Government. Nothing in this agreement shall be construed as a promise by the State as to the amount or nature of federal participation in this project. The Agency shall bill the state for federal aid project costs incurred in conformity with applicable federal and state laws. The agency shall minimize the time elapsed between receipt of federal aid funds and subsequent payment of incurred costs. Expenditures by the Local Agency for maintenance, general administration, supervision, and other overhead shall not be eligible for federal participation unless a current indirect cost plan has been prepared in accordance with the regulations outlined in 2 CFR Part 200 - Uniform Admin. Requirements, Cost Principles and Audit Requirements for Federal Awards, and retained for audit. The State will pay for State incurred costs on the project. Following payment, the State shall bill the Federal Government for reimbursement of those costs eligible for federal participation to the extent that such costs are attributable and properly allocable to this project. The State shall bill the Agency for that portion of State costs which were not reimbursed by the Federal Government (see Section IX). VII. Audit of Federal Consultant Contracts The Agency, if services of a consultant are required, shall be responsible for audit of the consultant's records to determine eligible federal aid costs on the project. The report of said audit shall be in the Agency's files and made available to the State and the Federal Government. An audit shall be conducted by the WSDOT Internal Audit Office in accordance with generally accepted governmental auditing standards as issued by the United States General Accounting Office by the Comptroller General of the United States; WSDOT Manual M 27-50, Consultant Authorization, Selection, and Agreement Administration-, memoranda of understanding between WSDOT and FHWA; and 2 CFR Part 200.501 -Audit Requirements. If upon audit it is found that overpayment or participation of federal money in ineligible items of cost has occurred, the Agency shall reimburse the State for the amount of such overpayment or excess participation. IX. Payment of Billing The Agency agrees that if payment or arrangement for payment of any of the State's billing relative to the project (e.g., State force work, project cancellation, overpayment, cost ineligible for federal participation, etc.) is not made to the State within 45 days after the Agency has been billed, the State shall effect reimbursement of the total sum due from the regular monthly fuel tax allotments to the Agency from the Motor Vehicle Fund. No additional Federal project funding will be approved until full payment is received unless otherwise directed by the Director, Local Programs. Project Agreement End Date - This date is based on your projects Period of Performance (2 CFR Part 200.309). Any costs incurred after the Project Agreement End Date are NOT eligible for federal reimbursement. All eligible costs incurred prior to the Project Agreement End Date must be submitted for reimbursement within 90 days after the Project Agreement End Date or they become ineligible for federal reimbursement. VIII. Single Audit Act The Agency, as a subrecipient of federal funds, shall adhere to the federal regulations outlined in 2 CFR Part 200.501 as well as all applicable federal and state statutes and regulations. A subrecipient who expends $750,000 or more in federal awards from all sources during a given fiscal year shall have a single or program -specific audit performed for that year in accordance with the provisions of 2 CFR Part 200.501. Upon conclusion of the audit, the Agency shall be responsible for ensuring that a copy of the report is transmitted promptly to the State. XVII. Assurances Local Agencies receiving Federal funding from the USDOT or its operating administrations (i.e., Federal Highway Administration, Federal Transit Administration, Federal Aviation Administration) are required to submit a written policy statement, signed by the Agency Executive and addressed to the State, documenting that all programs, activities and services will be conducted in compliance with Section 504 and the Americans with Disabilities Act (ADA). DOT Form 140-041 Page 2 Revised 05/2015 VICINITY MAP Upper Hoh Rd. Milepost 9.7-9.8 Emergency Repair Jefferson County Public Works Tatoosh Istard �` wa - Waadah isBns 9 C+Pa FiaLesyr-R Bahakos Peak x } dak PointG l" f" ��► ` 1-. , Sekiu Slip ?Dint H. CfaRam,sav N xx saki. Mtn Q. y1 IIAr Point CA r- r x Lon, �tnt F cs 'x AnYehs Point E i r Yipee Peak bac Ell, MI" YC r fR ELWA —{1F i �gt.atan 0 t y M P 1 C' Mt MWIr( ✓ a,'r i " Tyee�lBkavar PO-�Iw,c. .t W 7,_YYPYC E'r-T-z ger �.• Aonra. Peak 4 AL ..,/ . na-:oxA[ � e: J r Laktr Bt 8e 9 -- - M[ '; '-� FAP- rHarncaneHtr°- S, Sl 15 � o�.o 1 1$ Is -�- r•�- Upper Hoh Rd. Sol� r ,' Fo.,ya IkRid Milepost 9.7-9.8 Slide Peak r: j iec O La�Vsh��n: ...fF. : vff+.Ma! P4ah a °=`;`.-- tnd 8n Pass Mtn .. 9=7 P aU tE4'i'•3 - `nom duYdrlQ2t _ . IN P..,� -✓ Reade rii 7 �• Mt arr;e; F- 2 AMU WIT miscatt 0C,OU5 .N A T 1 0 N A L n Al � rt x tl7� inOidM E3fN�i.]W\ - E -_ - M 0 4A i'! T DIYw� u �Mt Sash* i LF C'G Ai'uev lstas��i.' - - Kr. _ 3 4 } t1v _ -pY • KIattPgak �.. F .ULY5rP1 _,. b¢•- � i. .:. R S 4. E R L, f[ef Po Noothman k .� a ,hklShY I TN tri 0 J 10 1J 20 25 miles 0 5 10 15 20 25 30 35 40 km Cernornnhir. funrnv Tvian rrnntrri ,with Tf1P[ IIA (d).(1(1'{ Nntimwl nntinnnlvnn>r'nnhir rnmltnnnf Upper Hoh Road MP 9.7-9.8 Emergengy Repair Write a description for your map. 2017 Legend Fl Hoh Rain Forest - Olympic National Park