Loading...
HomeMy WebLinkAbout110617_ca05Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Engi7A— Subject: Agenda Date: November 6, 2017 Change Order No. 1 with Interwest Construction Inc. for Olympic Discovery Trail, S. Discovery Bay, Segment A- Phase 1 £t2 County Project No. 1801955 Statement of Issue: Authorization of Change Order No. 1 in the amount of $7,402.98 and an additional six (6) working days for the above referenced project. Analysis/Strategic Goals/Pro's ft Con's: Public Works has completed the Olympic Discovery Trail project in South Discovery Bay, Segment A- Phase 1 Et 2 construction. Change Order No 1 is necessary to reconcile the final project costs. Fiscal Impact/Cost Benefit Analysis: This change order will both increase the total contract amount by $7,402.98 from $987,654.32 to $995,057.30, and add six (6) working days. Construction is funded through RCO and Jefferson County, with additional matching funds previously spent on Discovery Bay restoration by NOSC. Recommendation: Public Works recommends that the Board execute all three (3) Change Order No. 1 and return two signed originals to Public Works for further processing. Department Contact: John Fleming, P.E., Project Manager, 385-9160. Reviewed By: f 'p Morle Co my Administ Date 40 JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change 1 Date: 10/17/2017 CHANGE ORDER Order No. Ordered by County Engineer under terms of FRISection 1 - 04. 4 of the Standard Specifications 1$019550 Project No. Change proposed by Contractor To: 609 North Hill Blvd Burlington, WA 98233 Endorsed by: Interwest Construction, Inc. antractor Firm Name 10/25/17 ralo Signature Date President Project Title: Olympic Discovery Trail, South Discovery Bay, Title Consent given by Surety: (when required) Segment A- Phase 1 & 2 By: Attorney -in -Act Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: 1) HMA mobilization; 2) Quarry Spall for retaininge wall foundation; 3) Quarry spall for geosynthetic slope foundaiton; 4) Soil residual herbicide under HMA at Station 89+87 to 108+00 and 1+15 to 2+13; 5) Retaining wall shop drawings from Hilfiker; 6) Drainage system at Station 99+10 to 102+20 and 111+00, 12' of 18" concrete culvert; 7) 30" flex coupling at Station 119+50, 40' of 12" HDPE culvert at Station 90+95, Locate Century Link cables at Station 125+00 to 128+00, 2' tall quarry spall wall at Station 116+94 to 117+04; 8) Soil residual herbicide under HMA at Station 107+50 to 128+72; Berm & marker posts at trail end at Old Gardiner Road; 9) Remove trail soft spots, replace with CSBC; 10) Fence Type 6- 2 @ 3' gates and 12' opening to access culverts. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $987,654.32 $987,654.32 $7,402.98 $995,057.30 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME CONTRACT TIME CHANGE(Add/Del) TIME 106 106 6 112 RECOMMENDED AP ' REC ENDED nAPPROVAL 4si � Project Manager Date Cou ty n neer ate APPROVAL C MM143ED APPROVED (00 bi Engin ces r Date Chair, Jefferson County Commissioners Date -I JEFFERSON COUNTY Project No. 18019550 Sheet: 2 oP2 DEPARTMENT OF PUBLIC WORKS Change Date: 10/17/2017 CHANGE ORDER ESTIMATE OtderNo. _ DESCRIPTION UNIT UNIT ESTIMATED QUANTITY ESTIMATED AMOUNT ITEM GROUP NO. NO. MEASURE PRICE CHANGE CHANGE NEW ITEMS 29 HMA MOBILIZATION LS $1,552.40 1.00 51,552.40 31 -----QUARRY SPALL FOR RETAINING WALL FOUNDATION SF $37.00 78.00 52,886.00 32 QUARRY SPALL FOR GEOSYNTHETIC SLOPE FOUNDATION SF $30.00 396.00 S11,880.00 33 SOIL RESIDUAL HERBICIDE STA 89+87 TO 108+00 & 1+15 LS $1,583.43 1.00 $1,583.43 34 -TO -2+ RETAINING WALL SHOP DRAWINGS FROM HILFIKER LS $786.50 1.00 $786.50 35 DRAINAGE SYSTEM STA 99+10 - 102+20 & 111+00; 12' OF 18" CONCRETE CULVERT LS 59,666.80 1.00 $9,666.80 36 30" FLEX COUPLING STA 119+50; 40' OF 12" HDPE CULVERT STA 90+95; LOCATE CENTURY LINK CABLES STA 125+_0.0 - LS_ $2,728.73 1.00 $2,728.73 37 SOIL RESIDUAL HERBICIDE STA 107+50 - 128+72 LS $1,543.88 1.00 $1,543.88 38 BERM & MARKER POSTS AT TRAIL END AT OLD GARDINER R LS $1,750.09 1.00 $1,750.09 39 REMOVE TRAIL SOFT SPOTS, REPLACE WITH CSBC LS $2,392.02 1.00 $2,392.02 40 - - F FENCE TYPE 6- 2 @ Y GATES, 12' OPENING LS $1,289.69 1.00 $1,289.69 EXISTING ITEMS 14.00 -65.88 ($922.32) 5 ROADWAY EXCAVATION INCL. HAUL CY 6 GRAVEL BORROW INCL. HAUL TON 15.00 276.80 54,152.00 5.00 7 EMBANKMENT COMPACTION CY 142.32 $711.62 8 CRUSHED SURFACING TOP COURSE TON 26.00 25.63 $666.38 9 CRUSHED SURFACING BASE COURSE TON 23.00 210.16 $4,833.68 10 COMMERCIAL HMA GEOSYNTHETIC REINFORCED SLOPE TON SF 123.00 30.00 31.84 -1500.00 $3,916.32 ($45,000.00) _ 11 12 SIERRASCAPE (OR APPROVED EQUAL) RETAINING WALL SF 37.00 -57.50 ($2,127.50) 13 REMOVING SOLDIER PILE SHAFT OBSTRUCTIONS EST 5,000.00 -1.00 ($5,000.00) 14 SOLDIER PILE WALL SF 102.00 130.00 $13,260.00 -17 20 CORRUGATED METAL CULVERT PIPE 18 INCH DIAMETER 1 BEAM GUARDRAIL TYPE 31 LF LF 57.00 33.00 -15.00 11.00 ($855.00) $363.00 23 REMOVING AND RESETTING BEAM GUARDRAIL LF -40.00 ($5,400.00) 135.00 26 1 CHAIN LINK FENCE TYPE 6 LF 27.00 1.00 $27.00 27 BOLLARDTYPE 1 EA 1,200.00 0.09 $107.00 ESTIMATED NET CHANGE SUBTOTAL: - $6,791.72 �- + 9% SALES TAX: S611.26 ESTIMATED NET CHANGE TOTAL: 57,402.98