HomeMy WebLinkAbout112717_ca05Department of Public Works Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County EngineerG�Z_ Agenda Date: November 27, 2017 Subject: Authorization of Change Order #4 with Shold Excavating, Inc. Rick Tollefson Memorial Trail, Phase I Project, Co. Rd. No. 850100, CR1815 Statement of Issue: Authorization of Change Order #4 for the Rick Tollefson Memorial Trail, Phase I Project, CR1815 with Shold Excavating, Inc. this change order increases the net cost of the project by $1,050.00, and adds 10.5 additional working days. Analysis/Strategic Goals/Pros £t Cons: This change order is necessary to pay for costs for the revised interpretive signage brackets, a credit for a change in the epoxy coating for the steel reinforcement for the pedestrian bridge concrete deck, granting of additional working days providing mutual benefit for completion of specific work items after delivery and installation of the pedestrian bridge, additional topsoil quantities, and adding backer rod and joint sealant to the pedestrian bridge. Fiscal Impact/Cost Benefit Analysis: The cost of this change order is $1,050.00 and 10.5 working days. This change order increases the total bid cost including change orders to $590,819.80. This project has grant funding from the STPR (Federal) and Pedestrian/ Bicycle Safety (State) sources for the Construction phase in the amount of $953,311.00. Recommendation: Public Works recommends that the Board authorize Change Order No. 4 and return two signed originals of each to Public Works for further processing. Department Contact: John Wayand, Project Manager, 385-9377 Reviewed Byg2 11Z Philip Morley, County Administrator 4 Sheet 1 of 2 Date: 10/30/2017 Ordered by County Engineer under terns of Section 1 - 04.4 of the Standard Specifications e proposed by Contractor JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS CHANGE ORDER NO. 4: PARTS 1, 2, 3, 4, 5 Endorsed by: Shold Excavating, Inc. Contractor Fir i Nay ie t� Signature .000 Titre U_�- +C TY Consent given by Surety: (when required) By To: Shold Excavating, Inc. P.O. Box 179 121 Pomwell Road Port Hadlock, WA. 98339 Project Title: Contract No. CR1815 Rick Tollefson Memorial Trail, Phase I You are ordered to perform the following described work upon receipt of an approved copy of this change order: IAll work materials and measurement to be in accordance with the provisions of the standard specifications and [special provisions for the type of construction involved. This contract is revised as follows: Change proposed by Contractor PART 1 - • Item 12 Prefabricated Pedestrian Bridge, L.S. This Change Order provides for an extension of time for completion of specific bid items which had to be delayed, due to the necessity of completing them in the required order of work after installation of the pedestrian bridge. Due to the constrained geometry of this trail project, completion of those specific bid items had to be completed after delivery and installation of the pedestrian bridge, otherwise mobilization and use of the crane and associated equipment required for placement of the bridge on the bridge abutments, would have damaged those items. Completion of those specific items prior to placement of the bridge, would have incurred additional costs for the repair of those items. The items that would have sustained damage and their approximate quantities that could not be completed until after installation of the pedestrian bridge were: • Item 14 Trail Surfacing Top Course (105 tons) • Items 18-26 (Landscaping items) • Item 36 Rail Fence (90 LF) • Item 37 Farm Fence (335 LF) • Item 38 Pedestrian Safety Rail (375 LF) • Item 41 Trail Marker (1 EA) • Item 42 Trailhead Kiosk (1 EA) • Item 50 Privacy Fence (40 LF) Jefferson County Public Works deemed that it is very beneficial to the project quality and for the Public to grant this extension of time. • Estimated net cost increase is $0.00 • Current Unit Contract Price $115,100.00 L.S., New Unit Contract Price $115,100.00 L.S. • Change in Contract Time: 9.5 additional Working Days Change proposed by Contractor PART 2 • Item 43 Interpretive Signage, L.S. This change order changes the design of the steel angle mounting brackets for the four graphic cut out panels for the Interpretive Signs. The purpose of the change is to provide a more secure mounting system for the graphic cut out panels than the original design. ,The bracket is changed from the design shown on Plan sheet L6, to the design shown in the "Custom Panel MTG Bracket" drawing dated 8/28/17. • Estimated net cost increase is +$100.00 • Current Unit Contract Price $4,000.00 L.S., New Unit Contract Price $4,100.00. • Change in Contract Time: 0 additional Working Days 'Change proposed by Contractor PART 3 • Item 12 Prefabricated Pedestrian Bridge, EA. This change order changes the cast -in-place concrete bridge deck reinforcing steel epoxy coating, from the ASTM A934 specification (purple) as shown on the approved Bridge Plan sheet 4 of 4, to the ASTM A775 specifiction (green). This change is being made due to unavailability of reinforcing steel with the ASTM A934 specification epoxy coating in small quantities. • Estimate_ d net cost decrease is -$50.00 • Current Unit Contract Price $115,100.00, New Unit Contract Price $115,050.00 • Change in Contract Time: 0 additional Working Days Section 1 - 04.4 of the Standard Specifications PART 4 • Item 18 Topsoil Type A, CY This change order adds additional Topsoil Type A to be provided and placed in the area between approximate sta. 9+52 (beginning of project)_ to approximate sta. 10+80 (H.J. Carroll Park boundary) left and right sides of the trail, to a depth of 4". This changeis being made due to the omission of the landscaping hatching on Plan sheet L1 of the bid plans. The landscaping hatching indicates "Forest Groundcover Mix (as specified on plan sheet_ L5) and all planted areas area to receive_ topsoil per the note on Plan sheet L10. • Estimated net cost increase is +$1000.00 • Current Bid Contract Price $37,500.00, New Bid Contract Price $38,500.00. • Change in Contract Time: 0.5 additional Working Days Change proposed by Contractor PART 5 • Item 12 Prefabricated Pedestrian Bridge, EA. This change order adds backer rod and joint sealer between the bridge deck ends and the concrete bridge abutments. The Contractor proposed this change as the bridge subcontractor Contech Engineering Solutions recommended that this product be installed. This change was due to the omission of the backer rod and joint sealant on the Bridge Plans. • Estimated net cost change is $0.00 • Current Unit Contract Price $115,050.00, New Unit Contract Price $115,050.00 • Change in Contract Time: 0.5 additional Working Day Prod. Manager ORIGINAL CURRENT X Approval required CONTRACT CONTRACT ESTIMATED NET ESTIMATED CONTRACT AMOUNT AMOUNT CHANGE THIS ORDER TOTAL AFTER CHANGE X County Engineer $557,319.00 $589,769.80 $1,050.00 $590,819.80 Approval Required ORIGINAL CURRENT Change in contract time New Contract time CONTRACT TIME CONTRACT TIME this Change Order (Working days) (Working Days) (Working Days) (Working Days) 67 days 75 days , 10.5 days 85.5 days APPROVAL RECOMMENDED APPROVED 3c-G //Le / Pro' t M nager Dat" County Enginee Date d(PROJAL COMMENDED APPROVED Engineer ervices Manager Date Chair, Jefferson County Commissioners Date JEFFERSON COUNTY Contract No. CR1815 DEPARTMENT OF PUBLIC WORKS Date: 10/30/2017 Change CHANGE ORDER 4 - PARTS 1,2, AND 3 ESTIM Order No. 4 Sheet 2 of 2 Parts 1, 2, 3, 4, 5 BID TOTAL ESTIMATED ESTIMATED BID TOTAL ESTIMATED ESTIMATED ITEM DESCRIPTION UNIT UNIT QUANTITY QUANTITY NEW TOTAL AMOUNT AMOUNT NEW TOTAL NO. MEASURE PRICE CHANGE QUANTITY Incl. Change Orders CHANGE AMOUNT PART 1 12 1 Prefabricated Pedestrian Bridge EA $115,100.00 1.00 0.00 1.00 $115,100.00 $0.00 $115,100.00 PART 2 43 Interpretive Signage LS $4,000.00 1.00 0.00 1.00 $4,000.00 $100.00 $4,100.00 PART 3 12 1 Prefabricated Pedestrian Bridge EA $115,100.00 1.00 0.00 1.00 $115,100.00 ($50.00) $115,050.00 PART 4 18 1 Topsoil Type A CY $50.00 750.00 20.00 770.00 $37,500.00 $1,000.00 $38,500.00 PART 5 12 Prefabricated Pedestrian Bridge EA $115,050.00 1.00 0.00 1.00 $115,050.00 $0.00 $115,050.00 Estimated Net Change This Order: $1,050.00