Loading...
HomeMy WebLinkAbout121817_ca09Department of Public Works Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Engineer Agenda Date: December 18, 2017 Subject: Authorization of Change Order #5 with Shold Excavating, Inc. Rick Tollefson Memorial Trail, Phase I Project, Co. Rd. No. 850100, CR1815 Statement of Issue: Authorization of Change Order #5 for the Rick Tollefson Memorial Trail, Phase I Project, CR1815 with Shold Excavating, Inc. Analysis/Strategic Goals/Pros Et Cons: This change order is necessary in order to increase the total contract amount to reflect actual final bid item quantities used on the project. Fiscal Impact/Cost Benefit Analysis: This change order increases the total bid cost including change orders from $590,819.80 to $629,124.54 and adds 0 working days. This project has grant funding from the STPR (Federal) and Pedestrian/ Bicycle Safety (State) sources for the Construction phase in the amount of $953,311.00. Recommendation: Public Works recommends that the Board authorize Change Order No. 5 and return two signed originals of each to Public Works for further processing. Department Contact: John Wayand, Project Manager, 385-9377 Revi y' ip orl!y, unty Administrato JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Date: 12/4/2017 CHANGE ORDER NO.5 Ordered by County Engineer under terms of X Section 1 - 04.4 of the Standard Specifications Change proposed by Contractor To: Shold Excavating, Inc. P.O. Box 179 Endorsed by: Shold Excavating, Inc. 121 Pomwell Road Contractor Firm Name Port Hadlock, WA. 98339 Signature Title/� r Consent given by Surety: (when required) Project Title: Contract No. CR1815 By: Rick Tollefson Memorial Trail, Phase I You are ordered to perform the following described work upon receipt of an approved copy of this change order: All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. This contract is revised as follows: This Change Order #5 provides for authorization for payment of items that have quantity overruns that result in a net overrun of the current authorized total contract amount through executed Change Order #4, as follows: $ 629,124.54 Projected final total amount due to contractor through final Pay Estimate #8 in 2018 $ 590,819.80 Current authorized total contract amount through Change Order #4 $ 38_,304.74 Amount required for Change Order #5 (Net overrun of the current authorized total contract amount through Change Order #4) - The projected net overrun of the current authorized total contract amount through Change Order #4 is calculated as follows: $ 50,487.58 Projected final total amount of overrun items through final Pay Estimate #8 in 2018 $ (5,042.84) Projected final total amount of underTun items through final Pay Estimate #8 in 2018 $ 45,444.74 Projected net overrun amount of items through final pay Estimate #8 in 2018 $ (7,140.00) Deduction from Pay Estimate #4 for WSDOT Fabrication Inspection expenses (per Spec. 1-06.1(4)) S 38,304.74 Projected final net overrun amount of items through final pay Estimate #8 in 2018 These Items have overruns or under uns and are addressed by this change order: • Item 2 Tree Protection • Item 5 Roadway Excavation incl Haul • Item 6 Embankment Compaction • Item 7 Unsuitable Foundation Excavation incl. Haul • Item 8 CL. IV Reinf. Conc. Pipe 12 In. Diam. • Item 9 Underdrain Pipe 4" Diam. • Item 10 Drainpipe 4" Diam. • Item 11 Quarry Spalls • Item 13 Gravel Borrow incl. Haul • Item 14 Trail Surfacing Top Course • Item 15 Crushed Surfacing Top Course • Item 16 Erosion Control and Water Pollution Prevention • Item 17 TESC Compliance Incentive • Item 18 Topsoil Type A • Item 25 Wood Chip Mulch • Item 26 Steel Edging • Item 26 Steel Edging • Item 28 Structure Excavation CL. A incl. Haul • Item 30 Gravel Backfill for Foundations CL. A • Item 32 Construction Geotextile for Underground Drainage • Item 33 Construction Geotextile for Separation • Item 35 Rockwall • Item 36 Rail Fence • Item 37 Farm Fence • Item Pedestrian Safety Railing • Item 46 Hazardous Material Excavation incl. Haul • Item 47 Hazardous Material Handling and Disposal • Item 50 Privacy Fence See sheet 2 for Change Order #5 Estimate details. • Estimated net cost increase is $38,304.74 • Change in Contract Time: 0 additional Working Days Proj. Manager ORIGINAL CURRENT X Approval required CONTRACT CONTRACT ESTIMATED NET ESTIMATED CONTRACT AMOUNT AMOUNT CHANGE THIS ORDER TOTAL AFTER CHANGE X County Engineer $557,319.00 $590,819.80 $38,304.74 $629,124.54 Approval Required ORIGINAL CURRENT Change in contract time New Contract time CONTRACT TIME CONTRACT TIME this Change Order (Working days) (Working Days) (Working Days) (Working Days) 67 days 85.5 days 0 days 85.5 days APPROVAL RECOMMENDED APPROVE -- - - - — �. 17-1 Project Ma ager Date County Engineer Date APPROV L MMENDED APPROVED Engineering Services Manager Date Chair, Jefferson County Commissioners Date JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS CHANGE ORDER 5 ESTIMATE Sheet 2 of 2 Contract No. CR1815 Date: 12/4/2017 Change Order No. 5 ITEM NO. DESCRIPTION UNIT MEASURE UNIT PRICE BID TOTAL QUANTITY Incl. Change Orders #i - #4 ESTIMATED QUANTITY CHANGE ESTIMATED NEW TOTAL QUANTITY BID TOTAL AMOUNT Incl. Change Orders #1 -#4 ESTIMATED AMOUNT CHANGE ESTIMATED NEW TOTAL AMOUNT 2 5 6 7 8 9 10 11 13 14 15 16 17 18 Tree Protection Roadway Excavation incl. Haul Embankment Compaction Unsuitable Foundation Exc. Incl. Haul CL. IV Reinf. Conc. Pipe 12 In. Diam. Underdrain Pipe 4" Diam. Drain Pipe 4" Diam. Quarry Spalls Gravel Borrow incl. Haul Trail Surfacing Top_ Course Crushed Surfacing Base Course Erosion Control and Water Pollution Prevention TESC Compliance Incentive Topsoil Type A 1.S $3,900.00 $6.00 $6.50 $30.00 $44.00 $5.00 $21.00 $70.00 $15.00 $32.00 $23.00 $9,300.00 $9,300.00 $50.00 1.00 927.00 1500.00 22.00 144.00 350.00 50.00 60.00 2382.00 825.00 958.00 1.00 125.00 770.00 -0.24 -33.00 17.00 8.01 24.00 -4.00 -10.00 53.35 1747.15 -57.59 97.13 -0.10 177.25 224.00 0.76 894.00 1517.00 30.01 168.00 346.00 40.00 113.35 4129.15 767.41 1055.13 0.90 302.25 994.00 $3,900.00 $5,562.00 $9,750.00 $660.00 $6,336.00 $1,750.00 $1,050.00 $4,200.00 $35,730.00 $26,400.00 $22,034.00 $9,300.00 $125.00 $38,500.00 ($936.00) ($198.00) $110.50 $240.30 $1,056.00 ($20.00) ($210.00) $3,734.50 $26,207.25 ($1,842.88) $2,233.99 ($930.00) $177.25 $11,200.00 $2,964.00 $5,364.00 $9,860.50 $900.30 $7,392.00 $1,730.00 $840.00 $7,934.50 $61,937.25 $24,557.12 $24,267.99 $8,370.00 $302.25 $49,700.00 CY CY CY LF LF LF CY Tons Tons Tons LS Calc. CY ITEM NO. DESCRIPTION UNIT MEASURE UNIT PRICE BID TOTAL QUANTITY Incl. Change Orders #1 - #4 ESTIMATED QUANTITY CHANGE ESTIMATED NEW TOTAL QUANTITY BID TOTAL AMOUNT Incl. Change Orders #1 -#4 ESTIMATED AMOUNT CHANGE ESTIMATED NEW TOTAL AMOUNT 25 26 28 30 32 33 35 36 37 38 46 47 50 Wood Chip Mulch Steel Edging Structure Excavtion CL. A incl. Haul Gravel Backfill for Foundations CL. A Construction Geotextile for Underground Drainage Construction Geotextile for Separation Rockwall Rail Fence Farm Fence Pedestrian Safety Railing Hazardous Material Excavation incl. Haul Hazardous Material Handling and Disposal Privacy Fence CY $63.00 $9.00 $15.00 $50.00 $1.40 $1.40 $144.00 $17.60 $11.00 $55.00 $150.00 $1.00 $39.00 250.00 160.00 55.00 5.00 6192.00 50.00 125.00 1087.00 20053.00 516.00 1.00 1.00 150.00 9.80 -16.00 56.85 0.14 -436.40 96.66 8.83 48.00 120.00 8.00 -1.00 -1.00 1.00 259.80 144.00 111.85 5.14 5755.60 146.66 133.83 1135.00 20173.00 524.00 0.00 0.00 151.001 $15,750.00 $1,440.00 $825.00 $250.00 $8,668.80 $70.00 $18,000.00 $19,131.20 $22,583.00 $28,380.00 $150.00 $1.00 $5,850.00 $617.40 ($144.00) $852.75 $7.00 ($610.96) $135.32 $1,271.52 $844.80 $1,320.00 $440.00 ($150.00) ($1.00) $39.00 $16,367.40 $1,296.00 $1,677.75 $257.00 $8,057.84 $205.32 $19,271.52 $19,976.00 $23,903.00 $28,820.00 $0.00 $0.00 $5,889.00 LF CY CY SY SY SY LF LF LF CY Est. LF Estimated Net Change: $45,444.74 Deduction from Pay Estimate #4 for WSDOT Fabrication Inspection expenses (per. Spec. 1-06.1(4)): ($7,140.00) Estimate Net Change this Change Order #5 $38,304.74