HomeMy WebLinkAbout121817_ca07JEFFERSON COUNTY
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
TO: Board of County Commissioners
Philip Morley, County Administrator
FROM: Philip C. Hunsucker, Chief Civil Deputy Prosecuting Attorney
DATE: December l �, 2017
RE: Consent Agenda: Approval of Temporary Easement to Use Memorial Field
for Water Street Construction by City of Port Townsend
STATEMENT OF ISSUE:
The City of Port Townsend ("City") plans to do construction work on Water Street and replace
some 100 -year old water and sewer lines beginning in January 2018. The City already has let the
construction contract. The City needs space for a staging area for this work, and space is
available for this purpose at Memorial Field.
ANALYSIS:
This is a temporary measure while the City completes the construction. This use will not
interfere with any of the multiple uses of Memorial Field, including sports. The City will protect
the area with a chain link fence and will place a temporary pad upon the field. When the City is
finished with the staging area, it will remove the fence and temporary pad. The City will then,
and will then restore the staging area to its original condition.
The Board of County Commissioners (BoCC) approved a similar arrangement in 2010 when the
City was doing work on Madison Street.
This work will benefit citizens of the County, will foster positive relations with the City, and will
generate revenue for the County.
FISCAL IMPACT:
The City agrees to pay a fee for the temporary easement of $1000 per month, generating an
additional approximately $6,000 of revenue for Memorial Field.
RECOMMENDATION:
Sign the attached temporary easement and forward it the City forthwith.
A.40
REVIEWED BY:
A4ft'-Orley,C4L6A Aor
Date
After recording return document to:
City of Port Townsend
250 Madison Street, Suite 2
Port Townsend, WA 98368
TEMPORARY CONSTRUCTION EASEMENT
Reference Number of Related Documents:
Grantor(s): Jefferson County, a Washington municipal corporation
Grantee(s): City of Port Townsend, a Washington municipal corporation
Legal Description (the Property): Lots 1-8, Block 53 of the original Map of the Town of Port
Townsend, Records of Jefferson County, Washington
Assessor's Tax Parcel Number: 989705301
City of Port Townsend Reference: Water Street Overlay Project
TIB Project Number: 3-W-151(002)-1 Work Order Number: 110G
THE GRANTOR, Jefferson County, a Washington municipal corporation, for valuable
consideration, including One Thousand Dollars ($1,000) per month paid by the City of Port Townsend by
check delivered to Jefferson County on or before the first business day each month during the term of this
temporary construction easement, conveys and grants to the Grantee, the City of Port Townsend, its
successor and assigns, a temporary, exclusive easement, over, under, in, along, across and upon, that
certain land legally described as follows:
See Exhibit A — Temporary Construction Easement Area (a portion of the Legal Description above, and
depicted on a map Exhibit B — Construction Staging Area.
Temporary Construction Easement Area to be used as a Construction Staging Area, along with the right
of ingress and egress thereto across adjacent land of the Grantor for these purposes. The term of this
Easement commences January 1, 2018, and expires (unless extended by written agreement) on June 30,
2018, or sooner if the Grantee notifies Grantor that the easement is no longer needed. This easement is
granted subject to the following terms and conditions:
Page 1 of 3
1. The Grantee, and its contractor, will use the gate on the south side of the Grantor's
property (Memorial Field) to access the stating area and will install a gravel construction entrance and
running pad. A semi-permanent chain link fence (posts set in concrete) with a locking gate will be
installed on the north and west sides of the staging area. The NW corner post will have a protective pad
to protect athletes using the field in case they run into the corner. When Grantee is done using the staging
area, it will remove the fencing and gravel and restore the field to grass. The Grantee, through its
Contractor, will purchase seed through Jefferson County Parks so the seed used is the same seed the
County uses on the field.
2. Any costs associated with inspection, maintenance, improvement, repair, construction,
reconstruction, and improvements upon the property undertaken by the Grantee shall be borne by the
Grantee.
3. This Agreement shall be binding upon the Grantors and Grantee and their successors and
assigns, and constitutes a covenant running with the land.
4. Grantee agrees to indemnify, defend, and hold harmless Grantor from any and all claims,
losses, costs, liabilities, injuries and/or damages (including reasonable attorney's fees) suffered by any
person or property which may be caused by or arising out of, directly or indirectly, the Grantee's or its
agents', contractors', licensees' or invitees', exercise of the rights granted herein, including but not
limited to, claims arising from or resulting from any construction, repair or maintenance within the
easement area, provided that Grantee shall not be responsible for any claims arising from the negligence
or intentional conduct of Grantor, Grantor's successors and assigns, employees, agents or independent
contractors.
Due to the short duration of this temporary easement, no recordation is necessary.
Grantor covenants that it is the lawful owner of the above-described property and has authority to convey
such easement.
Dated this day of 52017.
(SIGNATURES FOLLOW ON NEXT PAGE)
Page 2 of 3
GRANTOR: JEFFERSON COUNTY
Board of County Commissioners
Jefferson County, Washington
By:
In
LOW
Kathleen Kler, Chair
Kate Dean, Commissioner
David Sullivan, Commissioner
SEAL:
ATTEST:
Carolyn Avery
Deputy Clerk of the Board
GRANTEE: CITY OF PORT TOWNSEND
I:
David Timmons, City Manager
ATTEST:
Joanna Sanders, MMC
City Clerk
Page 3 of 3
Approved as to form only:
GP'C'1�61 l Zf" 1 %
Philip C. Hunsucker, Chief
Civil Deputy Prosecuting Attorney
Exhibit A
Temporary Construction Easement Area
Starting at the SE comer of the Property described in the Legal Description, then extending 150'
along the southerly boundary of Lots 1, 3 and 5, then generally northerly and parallel to the
easterly boundary of Lot 1 a distance of 501, then generally easterly a distance of 150' parallel to
the southerly line of Lots 1, 3 and 5, then generally southerly along the easterly line of Lot 1 a
distance of 50' to the point of beginning.
Exhibit B
Construction Staging Area
[
BLOCK 5,
hFenoo
ow
BOetli Fe11Ee
OU
.1,
I
—
A[I�!
7'1�32�.,.,,
s PAVCANY
�
4'27'S""�
.AJIAYM 4«n
f•
iR
Lepad
A SM" pan
0 SUM Aieo 6fha
w Type 4 CbWn Lien Fbmfrs GW8 flw VV800T S� Plops L-
?0.'!l� gild L-aQ_90�y