HomeMy WebLinkAboutMLA16-00094 TESC reportTemporary Erosion and Sediment Control
Nealey Bulkhead Project
Prepared by
Sealevel Bulkhead Builders, President: Craig Powell
Sealevel Bulkhead Builders, Project Manager: Justin Robison
PO Box 375
Kingston, WA 98346
(360) 297-2401
7
SEALEVEL SHALL MAINTAIN A COMPLETE, UPDATED COPY OF THIS
PLAN IN AN ACCESSIBLE LOCATION ON THE PROJECT SITE AT ALL
TIMES.
Project Owner:
Terry Nealey
227 N Cherry St.
Dayton, WA 99328
(509) 520-8383
Terrytiealev65_@gmaii.com
Project Geotechnical Engineer:
Robert Cousins, Coastal Solutions
11027 Manitou Beach Dr NE
Bainbridge Island, WA 98110
(206) 459-7264
rob@coastaisalns.cem
oc�13czn
JEFMRSON COUNTY ®CD
Sealevel Bulkhead Builders I Nealey Bulkhead Project TESC
'TESC Plan Implementation Requirements
The purpose of a Temporary Erosion and Sediment Control Plan (TESC) is to prevent erosion
during and after the work on the subject project is completed.
Sealevel Bulkhead Builders, the Prime Contractor for the Nealey Bulkhead Project (Project), has
developed this TESC to satisfy the request from Jefferson County DCD.
Sealevel Bulkhead Builders shall update this TESC throughout the Project so that the written
Plan reflects actual site conditions and practices. At a minimum, Sealevel Bulkhead Builders
will update this Plan annually. Sealevel Bulkhead Builders shall fully implement this TESC, as
accepted and updated, at all times.
TESC Plan Elements
1. Responsible Personnel
Table 1.1 identifies the name(s), title(s), and contact information for the personnel responsible
for implementing and updating the TESC, and for responding to changes in conditions.
Responsibility
Implementing and Updating
TESC Plan (primary
contact person)
Table 1 Responsible Personnel
Name and Title
Justin Robison -Project Manager
Implementing and Updating Jenny Rotsten-Office Manager
TESC Plan (secondary
contact person)
On -Site Manager I Justin Robison -Crew Manager
2. Project and Site Information
Contact Information
Company: Sealevel Bulkhead Builders
Office Phone: 360-297-2401
Cell Phone: 360-930-1908
Company: Sealevel Bulkhead Builders
Office Phone: 360-297-2401
Cell Phone: 360-710-0899
Company: Sealevel Bulkhead Builders
Office Phone: 360-297-2401
Cell Phone: 360-930-1908
A. The Project work: The project will include the installation of new sheet piling bulkhead.
B. The site location and boundaries: 351 Pleasant Harbor Rd Brinnon, WA
C. The drainage pathways from the site: See Table 2
D. Nearby waterways and sensitive areas and their distances from the site: See Table 2
Sealevel Bulkhead Builders I Nealey Bulkhead Project TESC
Table 2 Nearby Waterways' and Sensitive Areas2
Waterway' or Distance from Direction of Flow Runoff Drainage Pathway
Sensitive Areae Project Site from Project Site from Site
Hood Canal I In Tide Dependent Yes
Notes:
' Waterways include streams, creeks, sloughs, rivers, Puget Sound, etc.
2 Sensitive areas are areas that typically contain populations that could be particularly sensitive to a hazardous
materials spill or release. Such areas include wetlands, areas that provide habitat for threatened or endangered
species, nursing homes, hospitals, child care centers, etc. Sensitive areas also include areas where
groundwater is used for drinking water, such as wellhead protection zones and sole source aquifer recharge
areas.
3. Potential Erosion: During Construction
Since the project is scheduled to be completed during typical dry season, erosion and sediment concerns
are low for during construction. The Best Management Practices (BMP's) that will be implemented as
needed during construction will include, but are not limited to the following:
• Construction Access: Straw bales, silt fencing
• Cut slopes/exposed soils: Silt fencing, straw bales
• Staging areas: Silt fencing, straw bales
• Material stockpiles: Plastic cover and secured, silt fencing
Should a forecast predict inclement weather, preventative BMP's, such as those listed above, will be
installed as needed.
4. Potential Erosion: After Construction
Permanent erosion control includes the installation of jute matting on any areas of the site where
vegetation is damaged/removed and/or the placement of grass seed/native plants. Any requirements
from the geotechnical engineer will be met.
Sealevel Bulkhead Builders I Nealey Bulkhead Project TESC 0"