HomeMy WebLinkAboutOn-Site Sewage (OSS) and Septic Operations and Monitoring (O and M) Programs (PDF)Jefferson County Public Health Performance Measures
2014 Year-end Report
ONSITE SEWAGE (OSS) and SEPTIC OPERATIONS & MONITORING (O&M) PROGRAMS
1
PROGRAMS: Onsite Sewage (OSS) Permitting and Onsite Operations and Monitoring (O&M) Programs
MISSION: The mission of the Onsite Sewage Program is to minimize the threat of surface and ground water contamination from failing or improperly designed,
installed or maintained onsite sewage systems. The mission of the Operation and Monitoring Program is to protect public health by ensuring onsite sewage
systems are monitored, identify failures, and items that may lead to costly premature failures of OSS that contaminate ground and surface waters.
Goal Objective Task Performance
Measure
2010
Actual
2011
Actual
2012
Actual
2013
Actual
2014
Planned
2014
Actual
Goal 1:
Educate
homeowners,
builders, real estate
personnel, banks,
installers, designers
and onsite system
maintenance
personnel in the
proper operation
and maintenance of
onsite sewage
systems
Develop written
informational materials and
conduct workshops for the
public addressing OSS
operation and maintenance,
program incentives for
initial inspection,
installation of monitoring
access risers and
homeowner inspection
program
Provide training to
community groups to
increase awareness of OSS
regulatory requirements
Conduct OSS operations
and maintenance needs and
requirements workshops
for homeowners &
professionals
# of workshops and
presentations
19 4 4 20 13 4
Issue press releases about
OSS training opportunities
and general OSS info
# of press releases
provided -- -- -- 6 4 4
Create OSS operation and
maintenance information to
be included in Monitoring
Inspection Reminders
Statements/info
created
--
--
--
4 6 4
Goal 2:
Ensure a high
quality-onsite
sewage system
monitoring program
Send Monitoring
Inspection Reminders to
property owners
Create and send inspection
reminders # of reminders sent --
--
--
800 4,000 0
Review monitoring and
inspection reports, provide
timely follow-up and
coordinate with online
submittal program data
Develop procedure and
standards to triage reports
with corrective actions
required
% of OSS receiving
monitoring inspection 3.4% 3.4% 3.8% 4.7% 6% 5.1%
Pass/Fail -- -- -- PASS PASS PASS
Review reports, triage,
send follow-up
letters/notices
# reports reviewed -- -- -- 641 800 685
# follow-up letters
sent -- -- -- 154 150 156
Ensure Local Sewage
Management Plan is
consistent with current
status and practices
Update Local Sewage
Management Plan to reflect
progress and needed
Pass/Fail -- -- -- FAIL PASS FAIL
Jefferson County Public Health Performance Measures
2014 Year-end Report
ONSITE SEWAGE (OSS) and SEPTIC OPERATIONS & MONITORING (O&M) PROGRAMS
2
Goal 3:
Investigate
complaints and
action requests in
a timely manner to
reduce the threat
of human contact
with untreated
wastewater
Utilize existing data
systems to track action
requests and complaints1
Develop system to quantify
response time for
complaints within 30 days
Pass/Fail --
--
--
FAIL PASS FAIL
Create a report to track
response time
Pass/Fail -- -- -- FAIL PASS FAIL
% OSS complaints
investigated within 30
days
-- -- -- 90% 90% 94%
Goal 4:
Document all onsite
sewage systems in
Jefferson County
Identify previously
unknown onsite sewage
systems
Complete sanitary surveys
to move sites served by
OSS from unknown to
known status
# of systems identified 69 100 107 204 120 69*
% of estimated
existing 13,500
systems identified
73% 74% 75% 78% 80% 79%
Goal 5:
Implement the
Homeowner
Inspection
Program adopted
in code revisions
May 2012 to
comply with
monitoring
requirements
under WAC 246-
272A
Establish Homeowner
Authorization program
Complete database upgrade
incorporating all elements
of Homeowner Inspection
Authorization
Pass/fail -- -- -- PASS PASS PASS
Establish online portal for
monitoring inspection
report submittal
Link database to online
report portal
Pass/fail
-- -- -- PASS PASS PASS
Establish access to training
programs (Septics 101 and
201) for homeowners to
obtain authorization to
complete monitoring
inspections
Provide trainings and link
to online trainings
# of homeowners who
take in person and
online trainings
-- -- -- 410 200 81
Respond to requests for
authorization to inspect by
homeowners
# of homeowners
authorized -- -- -- 192 150 75
# of homeowners that
submit inspection
reports
-- -- -- 15 50 3
1 Complaints include all reports from the public and others regarding onsite sewage issues. These range from reports of someone parking or driving on their drainfield, living on
property without a permitted septic system to surfacing sewage.
Jefferson County Public Health Performance Measures
2014 Year-end Report
ONSITE SEWAGE (OSS) and SEPTIC OPERATIONS & MONITORING (O&M) PROGRAMS
3
SUMMARY OF KEY FUNDING/SERVICE ISSUES:
Tracking is done with existing data systems to evaluate effectiveness of permitting and monitoring programs. Ongoing O&M activities are funded through state
and federal grants as well as the ‘filing’ fee that is submitted with monitoring inspection reports. Implementation is focused on: follow-up with homeowners on
inspection results, implementing the code revisions adopted in May 2012 to allow homeowners to be trained, completing monitoring inspections and report results
to meet state requirements for assurance of a properly functioning OSS system. Follow-up with homeowners on inspection results is critical to the understanding of
how systems work and why maintenance and proper operation is important. A system for correspondence and follow-up is being implemented. The system allows
us to identify different levels of severity and type of problem as well as target problems of a serious nature for additional action. Additionally, an incentive
program to assist homeowners in completing inspections and install access risers and monitoring ports was available for all of 2013.
Identification of previously unknown onsite sewage systems is ongoing as part of a project in the Marine Recovery Area (MRA) along the Hood Canal. The state
requirement that all unknown systems be identified by 2012 was not met but we are continuing to pursue identification of all unknown systems.
Due to a lack of staffing resources, our goal to complete the Local Management Plan was not met. We continued in 2014 to refine the goals and revisions of the
Management Plan in light of changes in Clean Water District funding and legislative action.
Onsite sewage permitting and staffing has declined due to the economic downturn of the past several years. The number of permits received dropped
significantly from 20017 to 2011. Activity has increased annually since 2011. Overall, current activity has increased 60% since 2011 with little
change to staffing resources. The team continues to strive to maintain effective communication with our clients and partners (other state and local
departments) to effectively manage workload and requests for information while diligently reviewing and enforcing county code and policies.
Coordination with our Environmental Health Tech is assisting staff in timely review and documentation of activities in the database.
Training and Round Table meetings continue with professionals certified by JCPH. These meetings assist in improving the quality of submittals and
offer an opportunity to resolve questions about the codes and challenging site conditions.
2014 STUDY/ANALYSIS OF RESULTS
Septic system monitoring
Homeowner Authorization
It was a successful year for implementing Homeowner Authorization for monitoring septic systems. Although the online system is not yet up, we held 3
classes for 81 individuals with 75 getting the authorization to inspect their OSS. We will continue to provide ‘classroom’ trainings on a regular basis, at
least once a year to accommodate those who prefer that style of learning.
All classes include information on funding available for repair or upgrade of an OSS as well as the rebate program for access riser and monitoring
inspection. These have been very well received.
Work continues on the online Homeowner Authorization Program. We have very limited access to a database administrator which hampers our ability to
move forward on this program. However, one substantial barrier that was present has been removed with the establishment of a fiber optic line to the area.
Jefferson County Public Health Performance Measures
2014 Year-end Report
ONSITE SEWAGE (OSS) and SEPTIC OPERATIONS & MONITORING (O&M) PROGRAMS
4
System identification, Reminders and Incentives
The incentive/rebate program for access risers for your first monitoring inspection by a professional was available during all of 2014. This assists
homeowners of previously unknown systems as well as many older systems that have never been inspected. It was not as heavily used as expected. We
provided the brochure and application with all letters and sanitary surveys conducted by staff. We are now evaluating additional methods of stimulating
use of these funds. We expect the interest to increase when we start sending regular reminders to property owners.
General Inspection reminders were sent as part of the Sanitary Survey mailers. We anticipate sending site and system specific reminders as soon as the
online homeowner authorization program is up and running. This may also stimulate use of the rebate program.
We did not succeed in identifying all unknown onsite sewage systems by the end of the 2012. Work continues toward this goal into next year by
partnering with the Water Quality Department on a project in the lower Duckabush and the Hood Canal Watershed project. The project has effectively
identified more than half of the unknown systems in the lower Duckabush River area. Completion of the Sanitary Surveys helps us to identify that a
system is on a property but do not generally include a detailed inspection of the system. These systems are tracked separately from systems that have a
regular monitoring inspection completed.
Septic System Operation - Monitoring Inspection Follow-up and Complaint Investigation
Monitoring Inspection Reports are reviewed. Follow-up letters were sent to 108 property owners where problems/deficiencies are noted that indicate either
imminent failure or identify a violation of the permit. Response to these letters has been excellent and offer an opportunity to give additional information
to new property owners. Letters were sent to 48 property owners that did not complete a monitoring inspection prior to property transfer.
Results from monitoring inspections or complaint investigation- 96 Follow-up inspections by O&M providers were submitted to the online inspection
database to document correction of deficiencies/problems that they observed. Of the 46 repair applications that were received, 15 resulted from
monitoring inspections and 2 resulted complaint investigation. Of the 12 upgrade or expansion applications 3 resulted from monitoring inspection reports
and one from complaint investigation.
Process Management and Planning
The Local Management Plan is being reviewed and updated to identify successes and update information. We intended this project to be completed in
2014 but were unsuccessful due to workload issues.
The Onsite Sewage, Solid Waste and Water Quality Divisions continue to add to our Standard Operating Procedures around enforcement and investigation
of complaints and identified problems.
The Onsite Sewage Division is working on the procedures for all regular practices: permit review and issuance, data entry and reporting, and tracking
monitoring inspections and response to necessary corrections. Activities associated with our review of JC Development Review projects such as
subdivision and building permits is included in this project.
Use of the notice to property title for unresolved violations was reviewed by JC legal counsel and presented to the BOH. A fee proposal for removing the
notice was approved by the Board of Health. The notice will only be considered after our regular efforts have failed. Funding was approved in one of our
grants to pay for the recording fees associated with filing the notice to title.
Response to complaints and identification of problems is coordinated with staff from the Water Quality Department. We are using both the database as
well as a tracking calendar to document communications and assure that all staff can see and understand what the status is on a particular site. The
‘complaint/action request’ form was revised to ease data input.
A system to track the response time to complaints was developed but is not consistently used. Staff training is ongoing.
Jefferson County Public Health Performance Measures
2014 Year-end Report
ONSITE SEWAGE (OSS) and SEPTIC OPERATIONS & MONITORING (O&M) PROGRAMS
5
Septic Permit Applications/cases
The number of permits received is slightly above 2013, approximately 6% more. We currently have one FTE carrying primary responsibility for all septic
permit applications. A sustained increase in the permit load necessitated reallocating staff to maintain timeliness in permit review and issuance. In the fall
of 2014 .2 FTE (8 hr/week) was added to the program enabling permitting staff to focus on timely review of applications. Assessment of permit
application activity and adding staff resources to the program will be a primary focus of action for 2015 as the current pace is unsustainable by the 1.2
FTE.
All paper septic case records that could be identified to a parcel have been scanned and are available on the Jefferson County Laserfiche Weblink. These
records are used extensively by property owners, onsite sewage professionals, realtors, and interested parties. Staff assists clients in using the site and can
also email a file if necessary.
Jefferson County Public Health Performance Measures
2014 Year-end Report
ONSITE SEWAGE (OSS) and SEPTIC OPERATIONS & MONITORING (O&M) PROGRAMS
6
PROGRAM STATISTICS
PERMITS 2008 2009 2010 2011 2012
2013
2014
Projected
2014
Actual
# of septic permit applications submitted 1 231 169 158 118 147 148 160 156
# of evaluations of existing system (EES) 295 255 463 469 511 641 800 781
# of systems repaired/upgraded 32 32 37 31 43 40 45 46
% of system failures less than 5 years in use 0 0 0 0 0 0 0 0
% of failures/major maintenance <2% <2% <2% <2% <2% <2% <2% <4%
# of complaints received 42 43 52 36 20 60 45 52
# of complaints closed* 24 19 33 25 26 25 30 43
# of Installers Certified 37 37 36 34 31 34 31
OPERATION, MAINTANANCE &
MONITORING 2008 2009 2010 2011 2012 2013 2014
Projected
2014
Actual
% of existing systems receiving regular 3rd party
monitoring. 2
2.20% 1.80% 3.40% 3.40% 3.80% 4.7% 6% 5.1%
# of previously unknown systems having a
monitoring inspection
15 9 10+ 595 15+ 855 14+935 204 120 69
% of monitoring inspections resulting in some
maintenance needed.
29% 28% 56%4 68%4 59%4 63%4 60% 63%4
% of monitoring inspections resulting in
required significant maintenance or repair.
12.5 16% 18.70% 12.40% 18.50% 13% 15% 23.3%
EDUCATION AND OUTREACH 2008 2009 2010 2011 2012 2013 2014
Projected
2014
Actual
# of educational workshops 6 5 19 4 9 20 13 4
# of workshop participants 239 102 355 156 220 410 300 131
*The number of Closed complaints can be greater than Received because cases from previous years may have been closed during the current year.
1Number of applications does not equal approved permits
2 Based on estimated 13,500 systems in the County (from the Local Sewage Management Plan)
4 Includes inspections where the only maintenance item identified was that the tank needed to be pumped. Previous years did not include this maintenance item.