HomeMy WebLinkAbout701311020 Geotech Assessment NORTHWESTERN TERRITORIES, INC. ..
717 SOUTH PEABODY STREET, PORT ANGELES, WA 98362
Engineers · Land Surveyors · Geologists
Construction Inspection · Materials Testing '~ i i ' ' ~
(360) 452-8491 1-800-654-5545 FAX 452-8498 E-Mail: info@nli4u.com
NTI
www. n ti4u. corn · ·
JAN 2 5 2002
UPDATE GEOTECHNICAL REPORT
For
GLENVIEW SHORT PLAT
Located in
Lot A, in Section 31, Township 27 North, Range 1 West, W.M.
Jefferson County, Washington
Prepared for
GLENN O. GUSTAVSON
Prepared by
NORTHWESTERN TERRITORIES, INC.
717 S. Peabody Street
Port Angeles, Washington 98362
Januaw 24,2002
Januaw 24,2002
Glenn Gustavson
PO Box 609
Quilcene, WA 98376
Subject:
Update Geotechnical Report for Lot A, Glenview Short Plat in
Section 31, T 27 N, R 1 W, W.M., Jefferson County, WA
Dear Mr. Gustavson:
At your request, Bill Payton of Northwestern Territories, Inc. (NTI) met with you at
the above location on January 15, 2002 to conduct an update geotechnical
inspection of Lot A. It is understood that you plan to sell Lot A, and that this
report will be used to satisfy Jefferson County's requirement for a geotechnical
report. The original report, completed in August, 1993 by NTI for Lots A, B and C,
is included with, and made a part of, this update.
The update geotechnical inspection consisted of a visual inspection of the lot
including a traverse of the bluff and beach via a pathway down the face of the
bluff to determine if there had been any new slide activity since the original
report. No evidence of further instability was noticed and thus, the conclusions
and recommendations of the original report are still valid.
The following recommendations should also be considered with regards to
development of the subject property:
Heavy irrigation or other activities that would contribute large quantities of
water to the soil should be avoided. One cause of landslides is the
presence of excessive groundwater in the soil near the bluff.
o
Runoff from roofs and other hard surfaces such as driveways and decks
should be controlled and routed to a detention basin, dry well, other
drainage control device or to the existing natural ravines such that surface
water discharge or sedimentation to adjacent properties will not be
significantly higher than pre-development conditions. The water should not
be infiltrated between the house and the bluff. An engineered drainage
control plan should be developed for this propertY to address these issues.
2
Septic systems and/or detention basins should not be constructed
between the house and the bluff.
All drainage control devices should be maintained in good working order
and inspected at least once a year.
Silt fences or other sediment control devices may need to be utilized in
order to prevent sedimentation to adjacent properties during construction.
Based on the findings, recommendations and limitations of this report:
There has been landslide activity on the bluff face in the past, however,
the report recommendations should provide for minimal landslide hazard
to the proposed home.
An analysis of slope stability indicates that the proposed home would not
be subject to risk of landslide under normal conditions.
The proposal would not increase surface water discharge or
sedimentation to adjacent properties.
4. The proposal would not decrease slope stability on adjacent properties.
5. The proposed home site would be stable under normal geologic
conditions.
Limitations
This report is based on a visual inspection of the existing site conditions, barring
major catastrophic events such as earthquakes or abnormal weather conditions,
No scientific measurements, tests or calculations were performed. The findings
and report are limited to the normal standard of care of the industry for an
investigation without benefit of scientific data and calculations.
The sole objective of this investigation has been to diagnose the geotechnical
conditions at the subject property. The property may be affected by regulations
pertaining to issues such as wetlands or wildlife habitat that are not addressed in
this report.
3
The report has been prepared for the exclusive use of our client in conjunction
with the above referenced project. It may be used by others only with expressed
written permission of the Engineer. The report has not been prepared for use by
others or for other uses. The observations, interpretations, and conclusions
herein are based on generally accepted professional engineering and geologic
principles and practice. This warranty is in lieu of all others, either expressed or
implied.
Sincerely,
NORTHWESTERN TERRITORIES, INC.
J. R. Jerry Newlin, P.E.
Principal Engineer
Bill Payton, L.E.G.
Engineering Geologist'
G:\Gen\Bill\Repods\GUSG0201.bluff stability.31(27-1).Bolton Peninsula.doc
4
NORTHWESTERN TERRITORIES, INC.
Engineers · Land Su~eyors · Planners
Construction Coordination · Materials Testing
SLOPE STABILITY EVALUATION
GUSTAVSON SHORT PLAT
Lot 3, Pope Resource Subdivision of
Government Lots 1 and 2
Section 31 North, Township 27 North, Range 1 West, W.M.
Jefferson County, Washington
Prepared for
GLENN 0. GUSTAVSON
Prepared by
NORTHWESTERN TERRITORIES, INC.
August, 1993
717 SOUTH PEABODY, PORT ANGELES, WA 98362 (206) 452-8491 1-800-654-5545 FAX 452-8498
SLOPE STABILITY EVALUATION
SCOPE AND PURPOSE
Our evaluation of bluff stability was reconnaissance in nature and
consisted of visual observations by Mr. Blase Cylwik, Engineering
Geologist. Observation efforts included traverse of the bluff
slope, shoreline and upper areas of the property designated for
residential construction. No subsurface exploration was performed.
The purpose of our study was to provide information concerning the
proposed division of the property into three residential lots--Lots
A and B west of Quilcene Road, and Lot C east of the road. Por-
tions of Lots A and B are also present east of the road. Our study
concerns that portion of the property lying west of the road.
PROPERTY DESCRIPTION
The property proposed to be divided is near the south terminus of
the Bolton Peninsula and consists of Lots A and B that extend about
350 feet west of Quilcene Road down to Quilcene Bay. Each of the
lots are 150 feet wide except that an area of about 200 feet by 200
feet and another of irregular shape about 600 feet long east of the
road are portions of Lots A and B, respectively. These areas are
to be used for septic drainfields. Lot C lies east of these latter
areas (Figure 1).
REGIONAL GEOLOGY
The bluff and property to the east are underlain by massive but
highly jointed grey to brown, well consolidated siltstone of the
Twin River formation that is of lower Miocene age. This formation
is overlain in the upper bluff and portions of the property by
poorly sorted silt, sand and gravel sediments. These sediments are
of glacial outwash origin and were deposited over 10,000 years ago.
They are generally dense but are not well consolidated and rela-
tively permeable.
The bluff has been formed by marine erosion and undercutting along
the shoreline, resulting in oversteepening and subsequent periodic
downward movement of bluff materials by erosion, slow creep of
surface soils and slumping. In general, the rate of average annual
bluff retreat can vary from a few inches to several feet. In this
area, the bluff does not appear to be aggressive marine undercut-
ting, perhaps because of the relatively firm siltstone and protec-
tion afforded by Quilcene Bay.
LOCAL CONDITIONS
The bluff area along Lots A and B is 75 to 100 feet in height and
has an overall slope of about 37 degrees. The slope is densely
tree and brush covered. Most of the trees appear to be second to
third growth. Over most of the bluff the trees stand nearby
vertically indicating surficial and grass slope stability during
their growth.
A landslide is present on the bluff between Lots A and B (Figure
1). The base of the landslide is about 100 feet wide along the
shoreline. It narrows and extends to near the top of the bluff.
The slide probably occurred over 50 years ago and appears to have
been subject to slow downward creep since that time. The landslide
probably was caused by a combination of adversely oriented jointing
in the siltstone, erosion along the ravine and over-steepening of
the bluff by marine erosion. The base of the landslide is seen in
Photos 1 and 2.
A shallow ravine extends northwest from Quilcene Road across the
northeast corner of Lot B and western slope of Lot A. The sides of
the ravine are brush and tree-covered (Photo 3). Another similar
ravine extends across the northeast corner of Lot A (Photo 4).
Erosion or downcutting in the ravines appears to have been negligi-
ble over the past at least several years.
A shallow bowl-shaped depression along the south side of the ravine'
in Lot B may represent pg.st shallow slumping of soils exposed by
ravine erosion. Slumping does not appear to be presently active
(Photo 3).
The large relatively level areas adjacent to and west of Quilcene
Road appear to be largely natural and appear permanent as a result
of having been recently cleared.
CONCLUS IONS
(i)
The relatively level portions of Lots A and B west of Quilcene
Road appear to be adequately stable to support residential
construction. It is understood that septic drainfields for
each lot will be east of Quilcene Road.
(2)
(3)
(4)
Runoff carried by the ravine down the bluff on Lot A may have
been a contributing factor to formations of the landslide on
the bluff. However, the ravine does not appear to be aggres-
sively eroding the slope or adjacent landslide.
The bluff appears to be grossly stable. The upper part of the
bluff above the landslide is relatively steep and may be
subject to accelerated sloughing or erosion because of this.
The possible shallow slump area along the ravine on Lot B
appears to be stable and should not present a hazard if
structural footings are founded in the underlying firm or
dense earth materials.
RECOMMENDAT IONS
(i)
Permanent structures should be located a minimum of 50 feet
back (east) of the existing top-of-bluff edge and 25 feet back
of the top of ravine slopes.
(2)
Structural foundations should be founded at least 18 inches
into firm or dense in-plate natural earth materials. Addi-
tional considerations may be necessary if any fill or loose
soils are encountered adjacent to the top-of-ravine banks.
(3)
Septic system drain fields should be located east of Quilcene
Road as proposed.
(4)
(5)
Sloping areas along the ravines and top of bluff should be
planted with deep-rooted ground cover to minimize erosion and
surface sloughing.
Runoff from roof d6Qnspouts and paved areas should be con-
ducted via lined downdrains to velocity dissipators in the
flowline of existing natural ravines.
STANDARD DISCLOSURE STATEMENT
This report is based on a visual inspection of the existing site
conditions. No scientific measurements, tests or calculations were
performed. The findings and report are limited to the normal
standard of care of the industry for an investigation without
benefit of scientific data and calculations. Unless construction
plans are reviewed and the construction work is inspected by the
Engineer, no warranty is made by the Engineer concerning conformity
of the construction to the conclusions and recommendations of this
report.
The sole objective of this investigation has been to diagnose the
geotechnical conditions at the site. The report has been prepared
for the exclusive use of Glenn 0. Gustavson and may be used by
others only with expressed written permission of the Engineer. The
report has not been prepared for use by others or other uses. The
observations, interpretations, and conclusions herein are based on
generally accepted professional engineering and geologic principles
and practice. This warranty is in lieu of all others, either
expressed or implied.
Blase Cylwik
ing Geo
Engineer lo
Professiona
fc: Gustvsn. Rpt
Dir: Eng/Rpt.
S T R J DATE: /7'
DESIGNED BY: ~'~./I :~' ~'yz&J//<'
PROJECT : ~TAU~ ~ ~
FOR : ~ ~.
SHT. / OF /
NORTHWESTERN TERRITORIES, INC.
Engineers · Land Sm'veyors · FYanners
Construction Coordination · Materials Testing
717 SOUTH PEABODY. PORT .ANGELES. WASHINGTON 98362 - (206) 452-8491
- SOUTH -
RAVINE
BASE OF LANDSL
LOT A
PHOTO 1
- NORTH -
BASE OF LANDSLIDE
LOT B
PHOTO 2
H