Loading...
HomeMy WebLinkAbout042318_ca03To: From: Agenda Date: Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request Board of Commissioners Philip Morley, County Administrator Monte Reinders, Public Works Director/County Engineer�e April 23, 2018 Subject: Supplemental Agreement for Consultant Services with Shearer Design LLC for Salmon Creek Bridge, West Uncas Road MP 0.804, County Project No. 18019341 Statement of Issue: Public Works staff requests a modification of the scope of work and budget in the basic agreement with Shearer Design LLC to include additional services for the construction of Salmon Creek Bridge at West Uncas Road MP 0.804. Analysis/Strategic Goals/Pro's 8t Con's: This supplement to the existing scope of work between Jefferson County and Shearer Design LLC is for construction support services for the Salmon Creek Bridge at West Uncas Road MP 0.804. Fiscal Impact/Cost Benefit Analysis: The maximum amount payable for this supplement is $17,346.00. The maximum amount payable for the Shearer Design LLC agreement will increase from $102,980.00 to $120,326.00. This project is funded at 85% by the Salmon Recovery Funding Board, with the remaining 15% funded by a $100,000 National Fish Passage Program grant and the County Road Fund. Recommendation: The Board is requested to sign all three originals of the Supplemental Agreement with Shearer Design LLC, and return two originals to Public Works. Department Contact: Mark Thurston, P.E., Project Manager, 385-9160. Reviewed By: Hipp Mo e , C unt Admini rator Date Supplemental Agreement Organization and Address: Number: 2 Shearer Design LLC 3613 Phinney Ave. N. #B Seattle, WA 98103 Phone: (206) 781-7830 Agreement Number: 14-1021P Project Number: 18019341 Execution Date: October 27, 2014 Project Title: Salmon Creek Bridge, West Uncas Completion Date: March 31, 2019 Road Description of Work: New Maximum Amount Payable: $120,326.00 The consultant shall provide construction support services which will include but may not be limited to review of shop drawings and calculations, providing on-site inspection of pile driving, concrete forms and steel reinforcement, bridge rail, punch list preparation, and answering questions as needed throughout construction. The Local Agency of Jefferson County desires to supplement the agreement entered into with Shearer Design LLC and executed on October 27, 2014 and identified as Agreement No. 14-1021P. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: II Section II, SCOPE OF WORK, shall be amended by creating a new task — Task No. 7, Construction Support. The items of work that will be done under Construction Support are set forth in the attached Exhibit A, and by this reference made a part of this supplement. IV Section W, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: This contract will expire on March 31, 2019 V Section V, PAYMENT, shall be amended as follows: The Consultant Fee Determination is set forth in the attached Exhibit E-1, and by this reference made a part of this supplement. Salmon Creek Bridge Paget of 3 Revised 12/2017 Supplemental Agreement No. 2 The Specific Rates of Pay have been revised and are set forth in the attached Exhibit E-2, and by this reference made a part of this supplement. Task No. 7, Construction Support, will have a maximum amount payable of $17,346.00. The new, total maximum amount payable will be $120,326.00, as shown below. Task No. Task Description Current Maximum Amount Payable Supplement #2 New Maximum Amount Payable EXISTING TASKS 1 Project Management $5,948.00 $0.00 $5,948.00 2 PS&E $48,909.00 $0.00 $48,909.00 3 Environmental Services $0.00 $0.00 $0.00 4 Hydraulic Analysis $20,847.00 $0.00 $20,847.00 5 Geotechnical Analysis $14,477.00 $0.00 $14,477.00 6 Load Rating $12,799.00 $0.00 $12,799.00 NEW TASKS: 7 Construction Support $0.00 $17,346.00 $17,346.00 TOTAL $102,980.00 $17,346.00 $120,326.00 Salmon Creek Bridge Page 2 of 3 Revised 12/2017 Supplemental Agreement No. 2 If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. Shearer Design, LLC Consultant Consultant's Signature 4/111 Ltl Date 1-11 COUNTY OF JEFFERSON BOARD OF COMMISSIONERS David W. Sullivan, Chair Kate Dean, Member Kathleen Kier, Member Approved as o form only: 0-- C. Philip C. Hunsucker Date Chief Civil Deputy Prosecutor 7!:::Cp /8 Mont in , .E. Date Public Works Director/County Engineer Salmon Creek Bridge Page 3 of 3 Revised 12/2017 Supplemental Agreement No. 2 EXHIBIT A SUPPLEMENTAL AGREEMENT NO. 2 SCOPE OF WORK Salmon Creek bridge / West Uncas Road INTRODUCTION This supplement provides for additional professional services necessary to provide support during construction for the Salmon Creek Bridge at West Uncas Road. The work is described per task category below. 1. Review Contractor Submittals: The Consultant will assist the Agency with review and approval of Contractor submittals, which will include but may not be limited to: a. Shop drawings and design calculations for the concrete girders b. Review of reinforcing bar layout/size c. Pile driving equipment / Pile driving system d. Shop drawings for Bridge Rail e. Materials approval and acceptance, including concrete mix designs for the Concrete Class 4000P (piling), Concrete Class 4000 (abutments), and Concrete Class 4000A (bridge approach slab). The Agency will handle the majority of materials approval and acceptance, but may request assistance for specific items. A limited time allocation is established to provide this assistance. f. Shop drawings and design calculations for the structural earth wall 2. On-site Construction Support: Time is allocated for five days of on-site inspection by the Consultant, to assist with inspection of piling driving, dynamic pile testing (if necessary), forms and reinforcing bar for cast -in-place concrete, bridge deck, bridge railing, and development of a punch list. 3. Respond to Questions during Construction: The Consultant will assist the Agency in answering questions that may arise during construction. The majority of these requests will be handled by the Agency. A limited time allocation is established for the Consultant to respond to questions when requested by the Agency. Page 1 of 1 Salmon Creek Bridge Supplemental Agreement No. 2 Exhibit E-1 Consultant Fee Determination Project Consultant Date Salmon Creek Bridge / West Uncas Road Shearer Design LLC 3/21/18 Task 7.1 Review Contractor Submittals $8,659.20 Task 7.2 On-site Construction Support $6,056.95' Task 7.3 Response to Questions during Construction $2,630.40 Total $17,346.55 Salmon Creek Bridge Supplemental Agreement No. 2 Exhibit E-1 Consultant Fee Determination Project Salmon Creek Bridge / West Uncas Road Consultant Shearer Design LLC Date 3/21/18 Senior Project Staff Principal Engineer Engineer Engineer Shearer, S.E. Doherty Lindstrom Pruitt Task 7.1 Review Contractor Submittals: Shop Drawings and design calculations for concrete girders 4 16 Review of reinforcing bar layout/size 4' 8 Pile driving equipment / Pile driving system 4 8 Shop drawings for Bridge Railing 4' 8' Materials approval and acceptance (incl. concrete mix designs 4 8 Shop Drawings and design calculations for SEW 4 8 Billing Rates ---F—$136.801 $114.001 $105.601 $96.001 i $3,283.20. $0.00 $0.00 $5,376.00 Direct Indirect Cost Mileage 0 $0.54 $ - Ferry 0 $15.00$ - Per diem 0 $233.00, $ - Expense Total $ - Sub Total Labor Expenses Subconsultants Total A+B+C Salmon Creek Bridge Supplemental Agreement No. 2 A $8,659.20 B $0.00 C $0.00 Exhibit E-1 Consultant Fee Determination Project Salmon Creek Bridge / West Uncas Road Consultant Shearer Design LLC Date 3/21/18 Senior Project Staff Principal Engineer Engineer Engineer Shearer, S.E. Doherty Lindstrom Pruitt Task 7.2 On-site Construction Support Pile driving 8 Cast -in-place Concrete (Forms and Rebar) 8 Deck Inspection 6 Railing and Punch List 8' 6 Dynamic Pile Test 8 8 Lunng males 1$136.801 $114.001 $105.601 $96.00[ r $2,188.80 $0.00 $0.00 $3,456.00 I Direct ; Indirect Cost Mileage 490 $0.535 $ 262.15 Ferry 10 $15.00 $ 150.00 Per diem 0 $233.00 $ - Expense Total $ 412.15 Sub Total Labor Expenses Subconsultants Total A+B+C Salmon Creek Bridge Supplemental Agreement No. 2 A $5,644.80 B $412.15 C $0.00 $6,056.95 Exhibit E-1 Consultant Fee Determination Project Salmon Creek Bridge / West Uncas Road Consultant Shearer Design LLC Date 3/21/18 Senior Project Staff Principal Engineer Engineer Engineer Shearer, S.E. Doherty Lindstrom Pruitt Task 7.3 Response to Questions during Construction Response to Questions during Construction 8 16 Sub Totals 81 01 16 Billing Rates $136.801 $114.001 $105.601 $96.00 $1,094.40 $0.00 $0.00. $1,536.00 Direct Salary Cost $2,630.40 Indirect Cost Mileage 0 $0.54. $ - Ferry 0 $15.00$ - Per diem 0 $233.00. $ _ Expense Total $ - Sub Total Labor A $2,630.40' Expenses B $0.00 Subconsultants C $0.00 Total A+B+C $2,630.40 Salmon Creek Bridge Supplemental Agreement No. Exhibit E-2 Consultant Fee Determination - Summary Sheet (Specific Rates of Pay) Fee Schedule Shearer Design Discipline or Job Title Hourly Rate Overhead @ 110 % Profit @ 30 % Rate Per Hour Pdnci al $57.00 $62.70 $17.10 $136.80 Senior Engineer $47.50 $52.25 $14.25 $114.00 Project Engineer $44.00 $48.40 $13.20 $105.60 Staff Engineer $40.00 $44.00 $12.00 $96.00 DOT 140-089 EF Exhibit E-2 8/07