Loading...
HomeMy WebLinkAbout043018_ca02Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E. Public Works Director/County Engineer Agenda Date: April 30, 2018 Subject: Transfer Station: Power Pack Slab Execution of Contract Change Order #1 County Project No.: 4012030 Statement of Issue: Execution of Change Order #1 to the Contract for Construction with Christensen Inc., of Tumwater, WA for construction services at the Jefferson County Transfer Station on County Landfill Rd. for the above referenced project. Analysis/Strategic Goals/Pro's Et Con's: This additional construction work is in association with the replacement of the "Grizzly" packer crane at the Transfer Station, and has been coordinated with the manufacturer. Fiscal Impact/Cost Benefit Analysis: With the addition of $4,649.12 the new contract amount will be $29,719.12 (tax inclusive). This project is funded with local funds. Recommendation: We recommend that this Contract Change Order #1 be signed by the BoCC. Please sign all three (3) Change Order originals and return two (2) originals to Public Works, retaining one original for your records. Department Contact: Gordon D. Ramstrom, Architectural Projects Planner, 385-9380 Reviewed By: i ` Philip Mo0w, County Admini5frator Date JEFFERSON COUNTY Sheet I of 3 DEPARTMENT OF PUBLIC WORKS Change TRANSFER STATION: POWER PACK SLAB order 1 Date: l2-Apr-18 CHANGE ORDER #1 Number Ordered by County Engineer under terms of Contract No✓ x Contract documents Project number:: 4012030 ❑ Change proposed by Contractor To: CHRISTENSEN INC Endorsed by: CHRISTENSEN INC. Attn: Kevin Christensen ontractor Firm Name 2840 Crites Street SW Tumwater, WA 98512-6117 Project Title: Signature Date Title Consent given by Surety: (when required) TRANSFER STATION: By: POWER PACK SLAB Attorney-in-fact Date You are directed to perform the following described work upon receipt of an approved copy of this change order: COP No. DAYS ADDED COST WSST @ 9.0 % COST W/ WSST REMARKS COP #1 $ 4,265.25 $ 383.87 — $ 4,649.12 Revisions to stairs to 0 suit "Grizzly" l0-Apr-18 COP #1 is attached TOTAL ADD 0 $ 4,265.25 $ 383.87 = $ 4,649.12 All work materials and measurement to be in accordance with the provisions of the specifications and special provisions for the VAX of construction involved. See the attached Change re uest #I and #2 ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGF. $25,070.00 $25,070.00 4,649.12 $29,719.12 ORIGINAL CONTRACT CURRENT CONTRACT TIME NEW CONTRACT COMPLETION DATE CONTRACT TIME CHANGE (Add/Del) TIME 5-Jul-18 Ninety calendar (90) days 0 5-Jul-t8 APPROVAL RECOMMENDED APPR ED Pr ect '.nage Cordon D. Ranrstrom Date CorurN riga r Dare PRO AL COMMENDED APPROVED Manager Date Chair, Jefferson County Commissioners Date Engineering S))14-11