Loading...
HomeMy WebLinkAboutChristensen General Contract, Inc., Change Order No. 1 - 043018SJEFFERSON COUNTY Sheet I of 3 DEPARTMENT OF PUBLIC WORKS Change TRANSFER STATION: POWER PACK SLAB order 1 Date: l2 -Apr -18 CHANGE ORDER #1 Number Ordered by County Engineer under terms of Contract No./ 11 Contract documents Project number:: 4012030 0 Change proposed by Contractor To. CHRISTENSEN INC Endorsed by: CHRISTENSEN INC. Attn: Kevin Christensen ontractor Firm Name, J 2840 Crites Street SW Tumwater, WA 98512-6117 Project Title: Signature Date ,�O/ C-5 Title Consent given by Surety: (when required) TRANSFER STATION: By: POWER PACK SLAB Attorney-in-fact Date You are directed to perform the following described work upon receipt of an approved copy of this change order: COP No. DAYS ADDED COST WSST @ 9.0 % COST W/ WSST REMARKS COP #1 $ 4,265.25 $ 383,8? _ $ 4,649.12 Revisions to stairs to 0 suit "Grizzly" l0 -Apr -18 COP #1 is attached TOTAL ADD 0 $ 4,265.25 $ 383.87 = $ 4,649.12 All work materials and measurement to be in accordance with the provisions of the specifications and special provisions for the qw of construction involved. See the attached Change request #I and #2 ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFrER CHANGE $25,070.00 $25,070.00 4,649.12 $29,719.12 ORIGINAL CONTRACT CURRENT CONTRACT TIME NEW CONTRACT COMPLETION DATE CONTRACT TIME CHANGE (Add/Del) T04E 5 -Jul -18 Ninety calendar (90) days 0 5 -Jul -18 APPROVAL RECOMMENDED APPR DED — / Pr ect A anage ; Gordon D. Ramstrom Date Catmty ngt r Date PRO ALR COMMENDED APPY.6VED Engineering S es Manager Date Chair, Jefferson rotenty mmisstoners Date Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E. Public Works Director/County Engineer Agenda Date: April 30, 2018 Subject: Transfer Station: Power Pack Slab Execution of Contract Change Order #1 County Project No.: 4012030 Statement of Issue: Execution of Change Order #1 to the Contract for Construction with Christensen Inc., of Tumwater, WA for construction services at the Jefferson County Transfer Station on County Landfill Rd. for the above referenced project. Analysis/Strategic Goals/Pro's Et Con's: This additional construction work is in association with the replacement of the "Grizzly" packer crane at the Transfer Station, and has been coordinated with the manufacturer. Fiscal Impact/Cost Benefit Analysis: With the addition of $4,649.12 the new contract amount will be $29,719.12 (tax inclusive). This project is funded with local funds. Recommendation: We recommend that this Contract Change Order #1 be signed by the BoCC. Please sign all three (3) Change Order originals and return two (2) originals to Public Works, retaining one original for your records. Department Contact: Gordon D. Ramstrom, Architectural Projects Planner, 385-9380 Reviewed By: Philip Morle , County Adr-rani rator Date