HomeMy WebLinkAboutPBS Engineering and Environmental, Inc., Supplemental No. 1 - 050718Supplemental Agreement
Organization and Address:
Number: I
PBS Engineering and Environmental, Inc.
1180 NW Maple St., Suite 160
Issaquah, WA 98027
Phone: (425) 654-8755
Agreement Number: PBS 2018-1
Project Number: 18020310
Execution Date: January 22, 2018
Project Title: Snow Creek Road MP 0.84 Culvert
Completion Date: March 31, 2019
Replacement — Preliminary Design
Description of Work: New Maximum Amount Payable: $117,750.00
The consultant shall perform additional drilling and geotechnical analysis at Snow Creek Road MP
0.84 to better assess options for culvert replacement.
The Local Agency of Jefferson County Public Works hereby amends the agreement with PBS
Engineering and Environmental, Inc., executed on January 22, 2018.
All provisions in the original agreement remain in effect except as expressly modified by this
Supplemental Agreement.
The changes to the agreement are described as follows:
II
Section Il, SCOPE OF WORK, shall be amended by supplementing Task No. 200, Geotechnical
Explorations and Report. The additional work that will be done under Task No. 200 is set forth in the
attached Exhibit A, and by this reference made a part of this supplement.
u
Section V, PAYMENT, shall be amended as follows:
Task No. 200, Geotechnical Explorations and Report, will have a new maximum amount payable of
$44,884. The new, total maximum amount payable will be $117,750, as shown below.
Snow Creek Road MP 0.84 Page 1 of 3 Revised 4/2018
Supplemental Agreement No. 1
Task
No.
Task Description
Current Maximum
Amount Payable
Supplement #1
New Maximum
Amount Payable
100
Topographic Survey
$1,044.00
$0.00
$1,044.00
200
Geotechnical Explorations and
Report
$30,060.00
$14,824.00
$44,884.00
300
Biologic Fieldwork and
Reporting
$10,311.00
$0.00
$10,311.00
400
Hydrologic and Hydraulic
Analysis
$7,137.00
$0.00
$7,137.00
500
Open -Cut Culvert Replacement
Alternative and Earth Work
Analysis
$6,481.00
$0.00
$6,481.00
600
Bridge Alternative
$15,200.00
$0.00
$15,200.00
700
Trenchless Alternative
$10,331.00
$0.00
$10,331.00
800
Alternatives Analysis and
Constructability Review
$3,480.00
$0.00
$3,480.00
900
Final Report
$4,102.00
$0.00
$4,102.00
1000
Project Management
$9,280.00
$0.00
$9,280.00
1100
Management Reserve and Final
Drawings
$5,000.00
$0.00
$5,000.00
Expenses
$500.00
$0.00
$500.00
TOTAL
$102,926.00
$14,824.00
$117,750.00
Snow Creek Road MP 0.84 Page 2 of 3 Revised 4/2018
Supplemental Agreement No. 1
This Supplemental Agreement Number 1 shall be effective upon execution by both parties, below. Work
performed consistent with the agreement prior to execution of this Supplemental Agreement is hereby
ratified.
In witness whereof, the parties hereto have executed this Supplemental Agreement Number 1 as shown
below.
(Consultant Firm Name)
094VIO 5A!�aa,9z-
Consultant's Name (Please print)
zzeo��7 zz��)4
onsultant's Signature
4 18
Date
Monte em .E. f5ate
Public Works Director/County Engineer
Snow Creek Road MP 0.84
Supplemental Agreement No. 1
COUNTY OF JEFFERSON
BOARD OF COMMISSIONERS
Davilgullivan, Chair Date
K e Dean, Member Date
Kathleen Kler, Member Date
Approved as to form only:
-5rllrz�
-1-7 //"r
/
Philip C. Hunsucker Date
Chief Civil Deputy Prosecuting Attorney
Page 3 of 3 Revised 4/2018
EXHIBIT A
SNOW CREEK ROAD CULVERT REPLACEMENT STUDIES
Project No. 170524, PBS Engineering and Environmental, Inc.
Geotechnical Engineering Evaluation
Scope of Work for Supplemental Investigations (April 11, 2017)
Background: Initial geotechnical explorations have revealed highly variable embankment fill thickness
and a steeply sloping bedrock surface. In some locations, the hollow stem auger was able to advance into
highly weathered bedrock and in other locations the hollow stem auger met with refusal near the surface
of the bedrock; this suggests the rock strength and degree of weathering is variable. During a design team
alternatives review meeting with Jefferson County Public Works, it was agreed that supplemental field
explorations were warranted to better define subsurface stratigraphy at the culvert site.
Field Explorations: Aspect will return to the site to advance three additional explorations. We will
identify the planned boring locations in the field and call for utility locates. We will communicate with
Jefferson County Public Works, who will provide traffic control support services (cones, signs, and
flaggers as required) to support the drilling work near the roadway fog lines/shoulders. We will mobilize
a drilling subcontractor to the site to complete three exploratory borings over two -days. These borings
will be advanced through the embankment fill utilizing mud rotary methods, and will continue through
highly weathered siltstone, until practical refusal. At that depth, we will switch to HQ drilling and coring
methods, and the borings will continue an additional 10 feet into the siltstone.
All borings will be drilled from the paved roadway shoulders at the locations marked on the attached site
plan. Each proposed boring location is also described here, relative to the existing boring data points and
the existing culvert:
• One boring about 30 feet east of the existing culvert, generally aligned with B-1, B-4, and 13-5;
• Two borings about 30 and 90 feet west of the existing culvert, generally aligned with B-2 and
B-3.
Laboratory Testing and Geologic Interpretations: Disturbed soil and rock samples obtained from the
borings will be placed in air -tight jars or bags. Intact rock core will be placed in core boxes and
transported to Aspect's geotechnical laboratory in Seattle for further examination. Selected samples will
be submitted for laboratory testing of index and engineering properties. Rock quality designation (RQD)
will be determined on recovered cores. Unconfined compressive strength testing will be performed on
intact core samples.
The results of these supplemental field explorations and laboratory testing will enable us to characterize
and map out the three-dimensional contact between embankment fill and siltstone bedrock. The
geotechnical engineering report will be updated to reflect this information.
Project and Contract Management and Administration: Aspect will manage their work and that of
their subcontractors/subconsultants to complete this supplemental work. Aspect will correspond with PBS
as needed with respect to contracts, insurance certificates, billing cycles, etc. Progress reports will be
provided with each monthly invoice.
Attached: Site Plan with Proposed Borings
Project Management Plan
xoL:Nlmm'u�nnoW 4wo oio.,uev+
�3ec'euode3w wtws'a�lmw3m
:�I{do rvxacle
NOi0NIHSVM `AlNn00 N0SNa=uAr
nyY
I
n
• �
aroL nins�arooe enn91w�xnaiiie`� ,.
1N3W30d1d3N 1N3A1f10 ad0H X33N0 MONS
I
i�
I
1
E-
}N a
II
'11111p1ItltlOdtlW '
l
�u
�,6'�, ..�p;''�
wio
e
y
Fp
I
NJ
:NOj NOIlt/A313 (INV NVId
_
Z N31d l
I
1
II
i 'OlHS 3NVl 3r 'OIHS
I � .0-,0 ,0 -,OL ,0 -.OL
�I I AtlMOVO!!
,l -,L
` I -
I 31JOl00Nls 1f10 -1f10
F
I I
I
I
I I
I
I
I
¢<
CZ U
II
II
F
I
i�
I
1
}N a
II
.oI
l
wio
/
I
Fp
I
NJ
�
_
Z N31d l
I
1
i U
I
<¢ I U
AUW31d
pmo
( I I
I a
I I I I
d
I I I
I
I
I I I i
a
o
I
j
I I am
f I I
I'
I
f I
0
I I �
L 631d
_
1 I t m�-
II
_
II
i 'OlHS 3NVl 3r 'OIHS
I � .0-,0 ,0 -,OL ,0 -.OL
�I I AtlMOVO!!
,l -,L
` I -
I 31JOl00Nls 1f10 -1f10
F
I I
I
I
I I
00'64+OL_vis_
L a31d
3
0
mI
1 � 1
133! NI NOLLYA313
0
wW
¢<
CZ U
Z Z
F
V V
J
}N a
.oI
l
wio
/
Fp
I
NJ
OS'lB+LL 'Ills
_
Z N31d l
00'64+OL_vis_
L a31d
3
0
mI
1 � 1
133! NI NOLLYA313
0
wW
...
Snow Creek Culvert Replacement
Supplemental Geotechnical Explorations
Project Management Plan
'ASPedconsutting
I O -Apr -18
job Number. 170524 Date Authorized.
Project Manager. Erik Andersen Budget: $ 17,524
Communications Charge: 47. Target Completion Date: 5/10/18
Task #
1
2
3
I r .s� J L $ /1614 $ 1 l $ 9,80U $ 11,524
Task Title
1. Project Management and Correspondence
$
Labor Budget Basis in Hours
DOC Subs Total
$ 804
2. Supplemental Explorations
$
4,143 $
110 $ 8,800 $ 13,053
3. Sample Reviews, Testing, Updated Cross Sections
EOA AH MO I SC
2,668 1
1 $ 1,000 $ 3,668
Total Project Budget
$
7,614 $
Sr. Senior Sr. Project
Remaining budget from original agreement
Other
($2,700)
Total supplement amount
Principal Associate Project Sr. Staff GISICAD Assistant
Total
Direct
Labor
Charges
Task
Work Element
Budget
(ODC) Subs
End Date
$ 24966 $ 21266 $ 171.67 l $ 141.23 $$ 118 11 ! $""95.82
1
I. Project Management and Correspondence
4/17118
1
Project Management, Invoicing, Progress Reports
2 1 I
$8042
2. Supplemental Explorations
4/28/18
2Plan
and Coordinate Field Work (Traffic Control,
72-1—
Subcontractors, Utility Locates)
6 1
$ 1,115
2
Geotechnical Borings (three additional hollow stem auger
explorations with 10-15 feet of HQ rock coring)
2 2 16
$ 3,028
$ 110 $ 8,800
Traffic Control Support
pp to be provided by Jefferson
-- -
_-
2
County
3
3. Sample Reviews, Testing, Updated Cross Sections
5/10/18
3
Visual Manual Classifications, Boring Logs
I I 2
$ 667
3
Assign and Review Lab Testing
I I
$ 313
Updated Subsurface Profiles (parallel and perpendicular to
3
the culvert)2
2 4 3
$ 1,688
Task #
1
2
3
I r .s� J L $ /1614 $ 1 l $ 9,80U $ 11,524
Task Title
1. Project Management and Correspondence
$
Labor
804
DOC Subs Total
$ 804
2. Supplemental Explorations
$
4,143 $
110 $ 8,800 $ 13,053
3. Sample Reviews, Testing, Updated Cross Sections
$
2,668 1
1 $ 1,000 $ 3,668
Total Project Budget
$
7,614 $
110 $ 9,800 $ 17,524
Remaining budget from original agreement
($2,700)
Total supplement amount
$14,824
Aspect Consulting, LLC
PW 10(1
M: Waw creek cuhen MIT— munty,Contmc.Wv b..I Nwteric;ASuppk—ntd Inresrigatidul5rww Geek Cohen Replacement Supplemental Eiylone— by —,b,
Department of Public Works
O Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, P.E., Public Works Director/County Engineer,
Agenda Date: May 21; 2018
Subject: Supplemental Agreement for Consultant Services with PBS
Engineering and Environmental, Inc. for Snow Creek Road MP 0.84
Preliminary Design, County Project No. 18020310
Statement of Issue: Public Works staff requests a modification of the scope of work
and budget in the original agreement with PBS Engineering and Environmental to
include additional geotechnical exploration and analysis for the Snow Creek Road MP
0.84 Preliminary Design.
Analysis/Strategic Goals/Pro's Et Con's: This supplement to the existing scope of
work between Jefferson County and PBS Engineering and Environmental is for
additional geotechnical exploration and analysis for the Snow Creek Road MP 0.84
Preliminary Design.
Fiscal Impact/Cost Benefit Analysis: The maximum amount payable for this
supplement is $14,824.00. The maximum amount payable for the PBS Engineering and
Environmental agreement will increase from $102,926.00 to $117,750.00. This
preliminary design work is funded by the County Road Fund. Public Works intends to
seek grant funding for project construction.
Recommendation: The Board is requested to sign all three originals of the
Supplemental Agreement with PBS Engineering and Environmental, and return two
originals to Public Works.
Department Contact: Mark Thurston, P.E., Project Manager, 385-9160.
Date
CONTRACT REVIEW FORM
CONTRACT WITH: PBS Engineering and Environmental, Inc.
(Contractor/Consultant)
CONTRACT FOR: Snow Creek Road MP 0.84 Preliminary Design — TERM: March 31, 2019
Supplemental Agreement No. 1
COUNTY DEPARTMENT: Public Works
For More Information Contact: Mark Thurston
Contact Phone #: (360) 385-9210
RETURN TO: Mark Thurston RFTURN BY: 5/9/2018
(Person in Department) (Date)
AMOUNT: $14,824.00 PROCESS:
Revenue:
Expenditure:
Matching Funds Required:
Sources(s) of Matching Funds
180000010.333.20.22
180000010.595
Exempt from Bid Process
X Consultant Selection Process
Cooperative Purchase
Competitive Sealed Bid
Small Works Roster
Vendor List Bid
RFP or RFQ
Other
Step l: REVIEW BY NT
Review by:
d Date Reviewed:
APPROVED FORM ❑ Returned for revision (See Comments)
Comments
Step 2: REVIEW BY PROSECU=NgATTORNEY
Review by:
Date Reviewed:
APPROVED AS TO FORM ❑ Returned for revision (See Comments)
Comments
Step 3: (If required) DEPARTMENT MAKES REVISIONS AND RESUBMITS TO RISK
MANAGEMENT AND PROSECUTING ATTORNEY
Step 4: CONTRACTOR/CONSULTANT SIGNS APPROPRIATE NUMBER OF
ORIGINALS
Step 5: SUBMIT TO BOCC FOR APPROVAL
Submit originals and 9 copies of Contract, Review Form, and Agenda Bill to BOCC Office.
Place "Sign Here" markers on all places the BOCC needs to sign.
MUST be in BOCC Office by 4:30 p.m. TUESDAY for the following Monday's agenda.
(This form is to stay with contract throughout the contract review process.)