Loading...
HomeMy WebLinkAbout051418_ca06Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners; Philip Morley, County Administrator From: Monte Reinders, PE, Public Works Director/County Engineer ' Agenda Date: May 14, 2018 Subject: Recommendation of Award of Contract for; Pavement Marking on Jefferson County Roads for Calendar Year 2018 Statement of Issue: Public Works staff has completed checking the bids opened on Monday, April 30, 2018 for the project referenced above, and finds it to be in the best interest of the County to award the Contract to the low bidder, Apply -A -Line, Inc. of Pacific, WA. Analysis/Strategic Goals/Pro's £t Con's: Award of this Bid is consistent with the County's goals in that it provides for safety of the motoring public. Signing the attached Recommendation for Award of Contract memo authorizes the contract amount. Fiscal Impact/Cost Benefit Analysis: Provisions for pavement marking services are included in the 2018 Road Operations Budget. The anticipated amount for this one (1) year Contract period is $306,823.89. Recommendation: It is recommended that the Board award this Bid by signature of the Chair where indicated on the attached memo, and then return of the memo to Public Works for further processing. A prepared Contract will then be provided to the Board for final execution at a later date. Department Contact: Date Seward, Project Manager 385-9353 Reviewed By: Date MEMORANDUM DATE: May 14, 2018 TO: Board of County Commissioners Jefferson County Department of Public Works 623 Sheridan St. Port Townsend, WA 98368 (360) 385-9160 Monte Reinders, P.E. Public Works Director/County Engineer FROM: Monte Reinders, PE, Public Works Director/County Engineer SUBJECT: Recommendation for Award of Contract for; Pavement Marking on Jefferson County Roadways for Calendar Year 2018 Public Works staff has completed checking the bids opened on April 30, 2018 for the above named project, and have verified the bidder's qualifications. In accordance with the Contract Documents and Specifications, Public Works staff finds it to be in County's best interest to award the Contract in the amount of $306,823.89 to the lowest responsive bidder named below: Apply -A -Line, Inc. 175 Roy Road SW Bldg. C Pacific, WA 98407 The Jefferson County Board of Commissioners approves award of this bid to the above-named contractor. David Sullivan, Chair Date Board of County Commissioners CC: (Project file). REVIEWED BY-.N"',- ERIC Y:ERIC KUZMA, ENGR.�SE VICES MANAGER/ASSIST. PW DIRECTOR M. REINDERS, P.E., PUBLIC W KS D OUNTY ENGINEER DATE: 5W I8 DATE: Page 1 of 1 COMMENTS: 1. Apply -A -Line made an incorrect entry for item #7 on their Proposal Form: $7,983.90 should have been $8,043.90 as above. Their $306,763.89 proposal total should have been $306,823.89 as above. However, Apply -A -Line remains the low bidder. 2. For item #15 on the Proposal Form, the Engineer entered an Approx. Quantity of 50 - Lin -ft. as a place holder. The quantity for item #15 on the Engineers Estimate was zero (0.00) Lin -ft. Therefore there is a $75.00 difference between the amounts in the Proposal Form and in the Engineers Estimate. BID TABULATION SHEET CONTRACTORS' BIDS 2018 PAVEMENT MARKING ON VARIOUS Contractor #1 Contractor #2 JEFFERSON COUNTY ROADWAYS ENGINEERS ESTIMATE Apply -A -Line, Inc. Stripe Rite, Inc. COUNTY PROJECT NO. 180 20490 $277,306.07 175 Roy Road SW Bldg. C 1813 137th Avenue East COPY Pacific, WA 98407 Sumner, WA 98390 Bid Opening Date: April 30, 2018 Ph.: 253-299-1200 Ph.: 253-863-2987 Bid Opening Time: 10:00 A.M. (Approx.) I e-mail: kathy@applyaline.comle-mail: steve@striperite.com ITEM APPROX. NO. ITEM DESCRIPTION UNIT QUANTITY UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID 1 SKIP CENTER PAINT LINE (single application) LIN.FT. 119,345 $0.08 $9,547.60 $0.05 $5,967.25 $0.05 $5,967.25 2 SKIP CENTER PAINT LINE (double application) LIN.FT. 8,733 $0.18 $1,571.94 $0.10 $873.30 $0.12 $1,047.96 3 SINGLE NO PASS CENTER PAINT LINE (single application) LIN.FT. 217,555 $0.12 $26,106.60 $0.12 $26,106.60 $0.09 $19,579.95 4 SINGLE NO PASS CENTER PAINT LINE (double application) LIN.FT. 18,876 $0.30 $5,662.80 $0.24 $4,530.24 $0.14 $2,642.64 5 TWO-WAY LEFT TURN (single app) LIN.FT. 4,213 $0.12 $505.56 $0.30 $1,263.90 $0.09 $379.17 6 DOUBLE NO PASS CENTER PAINT LINE (single application) LIN.FT. 522,550 $0.16 $83,608.00 $0.20 $104,510.00 $0.20 $104,510.00 7 DOUBLE NO PASS CENTER PAINT LINE (double application) LIN.FT. 26,813 $0.35 $9,384.55 $0.30 $8,043.90 $0.25 $6,703.25 8 CHANNELIZATION ( = Two X Double No Pass CL) (single app) LIN.FT. 4,992 $0.16 $798.72 $0.40 $1,996.80 $0.15 $748.80 9 PAINTED EDGE LINE (single application) LIN.FT. 1,016,422 $0.10 $101,642.20 $0.10 $101,642.20 $0.10 $101,642.20 10 PAINTED EDGE LINE (double application) LIN.FT. 51,560 $0.26 $13,405.60 $0.23 $11,858.80 $0.18 $9,280.80 11 ADDITIONAL PAINTED EDGE LINE (single app) LIN.FT. 10,867 $0.10 $1,086.70 $0.10 $1,086.70 $0.09 $978.03 12 PAINTED WIDE LINE (WHITE) (single application) LIN.FT. 12,474 $0.30 $3,742.20 $0.30 $3,742.20 $0.45 $5,613.30 13 PAINTED WIDE LINE (WHITE) (double application) LIN.FT. 26 $1.00 $26.00 $5.00 $130.00 $0.45 $11.70 14 PAINTED WIDE LINE (YELLOW) (single application) LIN.FT. 272 $0.80 $217.60 $1.00 $272.00 $0.45 $122.40 15 PAINTED WIDE LINE (YELLOW) (double app) (See Comment 2) LIN.FT. 50 $1.50 $75.00 $3.00 $150.00 $0.45 $22.50 ��161PROJECT TEMPORARY TRAFFIC CONTROL L. S. 1 $20,000.00 $20,000.00 $34,650.00 $34,650.00 $50,000.00 $50,000.00 1 -YEAR TOTAL AMOUNT: $277,381.07 $306,823.89 $309,249.94 Bid Bond Provided: YES Bid Bond Provided: YES UBI #: 600-553-941 UBI #: 601-048-084 PREPARED BY: DATE: L & 1#: 879,987-00 L & 1#: 477,182-01 DALE SEWARD, PROJECT MANAGER WA Contractor's #: APPLYLL8340J WA Contractor's #: STRIPRI*121JM FED ID #: 91-1270515 FED ID #: 91-1387668 Addendum's: N/A i Addendum's: N/A REVIEWED BY-.N"',- ERIC Y:ERIC KUZMA, ENGR.�SE VICES MANAGER/ASSIST. PW DIRECTOR M. REINDERS, P.E., PUBLIC W KS D OUNTY ENGINEER DATE: 5W I8 DATE: Page 1 of 1 COMMENTS: 1. Apply -A -Line made an incorrect entry for item #7 on their Proposal Form: $7,983.90 should have been $8,043.90 as above. Their $306,763.89 proposal total should have been $306,823.89 as above. However, Apply -A -Line remains the low bidder. 2. For item #15 on the Proposal Form, the Engineer entered an Approx. Quantity of 50 - Lin -ft. as a place holder. The quantity for item #15 on the Engineers Estimate was zero (0.00) Lin -ft. Therefore there is a $75.00 difference between the amounts in the Proposal Form and in the Engineers Estimate.