Loading...
HomeMy WebLinkAbout052918_ca04 Department of Public Works 0 Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E. Public Works Director/County Engineer Agenda Date: May 29, 2018 Subject: Transfer Station: Power Pack Slab Execution of Contract Change Order #2 County Project No.: 4012030 Statement of Issue: Execution of Change Order #2 to the Contract for Construction with Christensen Inc., of Tumwater, WA for construction services at the Jefferson County Transfer Station on County Landfill Rd. for the above referenced project. Analysis/Strategic Goals/Pro's Et Con's: This additional construction cost was incurred to coordinate with work by others, in the replacement of the pedestal mounted transfer station crane at the JC Transfer Station on County Landfill Road (JC Contract 17FS01). This last Change Order No. 2 will reconcile final project costs. Fiscal Impact/Cost Benefit Analysis: With the addition of $739.24 the new contract amount will be $30,458.36 (tax inclusive). This project is funded with local funds. Recommendation: We recommend that this Contract Change Order be signed by the BoCC. Please sign all three (3) Change Order originals and return two (2) originals to Public Works, retaining one original for your records. Department Contact: Gordon D. Ramstrom, Architectural Projects Planner, 385-9380 Reviewed By: $0". Morle • my Adfin . is for Date JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change TRANSFER STATION:POWER PACK SLAB Order 2 Date: 17-May-18 CHANGE ORDER#2 Number i Ordered by County Engineer under terms of Contract No./ 4012030 Contract documents Project number:: EX Change proposed by Contractor To: CHRISTENSEN INC Endorsed by: CHRISTENSEN INC. Attn:Kevin Christensen Contractor Firm Name 2840 Crites Street SW Tumwater,WA 98512-6117 Signature Dale Title Project Title: Consent given by Surety:(when required) TRANSFER STATION: POWER PACK SLAB By: Project#4012030 Attorney-in-fact Date You are directed to perform the following described work upon receipt of an approved copy of this change order: COP No. DAYS ADDED COST WSST @ 9.0% COST W/WSST REMARKS COP#2 $ 678.20 $ 61.04 = $ 739.24 Cost impact to 0 coordinate with crane 19-Apr-18 COP#2 is attached TOTAL ADD 0 $ 678.20 $ 61.04 = $ 739.24 All work materials and measurement to be in accordance with the provisions of the specifications and special provisions for the type of construction involved. See the attached Change request#1 and#2 ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $25,070.00 $29,719.12 $739.24 $30,458.36 ORIGINAL CONTRACT CURRENT CONTRACT TIME NEW CONTRACT COMPLETION DATE CONTRACT TIME CHANGE(Add/Del) TIME 5-Jul-18 Ninety calendar(90)days 0 5-Jul-18 i APPROVA RECOMME n ► APP ALRECOMME D D � `/1 Wig" '.ler1B Pro ct Mana er: io don D. Ramstrom Date County Engineer Date i 1 AP ti A RE'4MMENDED APPROVED Engineering)ervic Manager Date Chair.Jefferson County Commissioners Date