Loading...
HomeMy WebLinkAboutFloor Plan25' ON I \ 2660Fx TRU55 MANUFACTURER / r+ 1WTfrD1�166@ SHALL DESIGN TRUSSES STEPS AS REO'D 10" MIN TREADS T 3/4' MAX R15ERS YEPIFYLOCATION ON SITE BASED UPON LAYOUT IN STAIRS: 1O11r TREADS(10-Wr MIN) Y -T" 16 RISERS ®T-112' H-(1-314' MAX) RAILING PER CODE 1-1 0. SITE 3'•9' T314"MAX RISERS �XyX I 6 �1 ^SEE NOTE —SEE NOTE '••SEE NOTE ATTACHED ENGINEERING, 6/12 NAILING SCHEDULE PER CODE FOR FLOOR AND DN VERIFY LOCATION B'-51/2" 32' 4' GROUND FLOOR PLAN ONSITE BEDROOM OR NOTIFY ENGINEERIARCHITEGT — — — — — — — — — — — — `- m '� $ 50 �j OF CHAN6E5 TO LAYOUT PRIOR TO FABRICATION. DECK "SPECIAL ANCHORAGE REQUIRED 1 '•b" a•�i• 2-6' 3SIMPSONOMFSMF 91216X10o f VERIFY Y41TH J MANUFACTURER 4adaPx 4oeoFx STEP5 AS REO'D ON I \ 2660Fx 26wPx / r+ 1WTfrD1�166@ STICK FRAME GABLE YNALL 1 STtGK FRAME GABLE WALL MASTER BORM I 15/32" C-C;C-D SHEATHING w/ 8d's @ 2" T 3/4' MAX R15ERS YEPIFYLOCATION ON SITE gyp( STAIRS: 1O11r TREADS(10-Wr MIN) Y -T" 16 RISERS ®T-112' H-(1-314' MAX) RAILING PER CODE 1-1 0. SITE 3'•9' 2-5" O.C. EDGES; 3' IN FIELD (1280) �XyX I 6 �1 ^SEE NOTE —SEE NOTE '••SEE NOTE In T 1I2' HPLF VVALL VE lHNGHF ON SITE 6/12 NAILING SCHEDULE PER CODE FOR FLOOR AND �1 I WIN so M 10'-2" 31•19` B'-51/2" 32' 4' GROUND FLOOR PLAN 1206 SQ FT BEDROOM DEN sD —• m '� $ 50 �j ATH �X B3 -HEADER I "P 111 4zd DF p2 � LIVING T4' S-6" F -b" 20' 12' 32 u �6 In ooU I rc�o I ' omm it S "rorbreeAp4ATwoo I U' IIIDrLwq JOMT3 P ( (V 101 TS ON HANGERS QBB -FLOOR DEAN I-TH TRUSS LOAD) N U -21Y- 21YV21 = 21 X51 BB - NO TRU55 LOAD; M TRUSSES PARALLEL TO BEAM U TX 24•VL O W 615-X 24'GLB --- rc I N� DINING O o 13 -+1-ON / oma STEPSAS REQ'D I -ADS r I- 10 TREADS T 3Iq' MAX RISERS •� om w v 1� " VERIFY ON SITE FRY P f4 X 'r. yl m $ rnrM"ELr.ct � KITCHEN VERIFY DIMENSIONS O SITE COVERED 11g,'I 2'-1 3/4" PORCH x 2'-1314" r7� b6P 1111,2'" REF 55-ROORBEAM > 3125'% 12•GLB � ® f``4 UP $ 4' 6'•5 f!2" 3'-6 117' A"-10' 7 " 11'-3" x 111 (y q5 PANTRY b"b Post } PWDR STEP5 AS REO'D ON I \ 2660Fx 26wPx / r+ 10" MIN TREAD5 STICK FRAME GABLE YNALL 1 STtGK FRAME GABLE WALL MASTER BORM I 15/32" C-C;C-D SHEATHING w/ 8d's @ 2" T 3/4' MAX R15ERS YEPIFYLOCATION ON SITE gyp( STAIRS: 1O11r TREADS(10-Wr MIN) Y -T" 16 RISERS ®T-112' H-(1-314' MAX) RAILING PER CODE 1-1 0. SITE 3'•9' 2-5" O.C. EDGES; 3' IN FIELD (1280) �XyX I 6 �1 1/2" OR 5/8" GLIN-B. w/ Ed's @ 6' O.G. In T 1I2' HPLF VVALL VE lHNGHF ON SITE 6/12 NAILING SCHEDULE PER CODE FOR FLOOR AND �1 I WIN so M 10'-2" 31•19` B'-51/2" 32' 4' GROUND FLOOR PLAN 1206 SQ FT FLOOR PLAN 114"=1' 1208 50 FT OR055 HEATED GROUND FLOOR AREA 1233 50 FT 6R055 HEATED SECOND FLOOR AREA 37 50 FT UNHEATED MECHANICAL 504 50 FT UNHEATED BA5EMENT 256 50 FT COVERED PORCH 336 50 FT UNCOVERED DECK l 9' 1-1/8" WALL HEIGHT STAIRS: 10-11Y TREADS (10-5'4' MIN) 16 RISERS ®T-1IY I- (1-3/4' MAX) RAILING PER CODE VERIFY ON SITE SHEAR -WALL SCHEDULE 15/32" C -QC -D SHEATHING wt 8d's @ W O,C. (260) 15/32" C-C;C-D SHEATHING w/ 8d's @ 4" O.C, (380) r+ 15132' CL;C-D SHEATHING wl 8d's @ 3" O.C. (490) STICK FRAME GABLE YNALL 1 STtGK FRAME GABLE WALL MASTER BORM I 15/32" C-C;C-D SHEATHING w/ 8d's @ 2" (Dwhle plates @ panel edges.) gyp( 15132" STRUCTURAL #1 SHEATHING M 10d's @ 2.5' 2-5" O.C. EDGES; 3' IN FIELD (1280) �XyX I 6 �1 1/2" OR 5/8" GLIN-B. w/ Ed's @ 6' O.G. In T 1I2' HPLF VVALL VE lHNGHF ON SITE 6/12 NAILING SCHEDULE PER CODE FOR FLOOR AND �1 I WIN so M ROOF DIAPHRAGMS 4' 2B' WeOFX ww5 AA e AA STICK FRAME GABLE YNALL 1 STtGK FRAME GABLE WALL MASTER BORM I SLOPED CEILING 10/12 OVER 5/12 SC155OR TRUSSES 24"0 G 2'•L" 5'-0" 12' B' In T 1I2' HPLF VVALL VE lHNGHF ON SITE r-9 ar,• �1 I WIN so M I 2090FX 1 ;# 4X4 DF p2 XI OF 111 MASTER 1I BATH 1r1 1D661 4.3. T 7 Is Y N -1 BEDROOM DEN sD —• m '� $ 50 �j ATH �X B3 -HEADER 111 4zd DF p2 � F T4' S-6" F -b" 20' 12' 32 SECOND FLOOR AREA 8' 1-1/8" WALL HEIGHT 1203 5Q FT HOLD-DOWN SCHEDULE SIMPSON CMST 14/16 (6490/4585) SIMPSON HD513, HTT5, HDU5; (4505, 4670, 5645) A.B.: PABS-24 SIMPSON HDQ8-SDS2,5, HDU8-SD2,.5; (5715, 6970) w/4x4 A.B.: PABT-24 SIMPSON HDU11-SDS2"5, HDQ14-SOS2.5, HDU14-SDS2.5 (9539, 13710, 14445) 0>40 A.B.: PABB-24 ALL HARDWARE SHALL BE INSTALLED PER MANUFACTURERS SPECS. TO ACHIEVE MAXIMUM DESIGNATED STRENGTHS. APPROVED PLANS TO BE AVAILABLE ON SITE ADDRESS I. D. TO BE V151BLE FROM STREET U! v Z } W Q o iz- In ED LU 2 0� Q � vm ry to DATE: 5/11/2018 n=1 SHEET: 1 OF 4 0 g c"