Loading...
HomeMy WebLinkAbout070218_ca04 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E. Public Works Direc r/Co ty Engineer Agenda Date: July 2, 2018 Subject: Change Order No.1 with Apply-A-Line, LLC and County Project 180 20490; 2018 Pavement Marking on Jefferson County Roads; Statement of Issue: Authorization of Change Order No.1 for the above referenced project, to reduce the total contract amount by $19,291.70. Analysis/Strategic Goals/Pro's Et Con's: Public Works has determined that by substituting one (1) material with another of equal performance capability, but less expensive for the contractor to provide, will result in a net reduction in project costs. Fiscal Impact/Cost Benefit Analysis: This change order will reduce the total contract amount by an estimated $19,291.70, from $306,823.89 to $287,532.19. Funding for this project is accounted for in the 2018 Roads Maintenance Budget. Recommendation: Public Works recommends that the Board approve Change Order No.1 by executing all three (3) originals and returning two (2) completed originals to Public Works for further processing. Department Contact: Dale Seward, Eng.-1, 360-385-9353 Reviewed By: Phifip Morley, Count A 'n' trator Date JEFFERSON COUNTY Sheet: 1 of 2 DEPARTMENT OF PUBLIC WORKS Change 1 Date: 6/25/2018 CHANCE ORDER Order No.: Ordered by County Engineer under terms of ESection 1 -04.4 of the Standard Specifications Contract No.: 180 542 20490 ®Change proposed by Contractor To: Apply-A-Line, LLC Endorsed by: Apply-A-Line,LLC 175 Roy Rd. SW ontractor Firm Name Bldg.C 06/26/18 Pacific WA.98047 Signature Date Michael Liljestrcm,CEO Title Consent given by Surety:(when required) Project Title: 2018 Pavement Marking Jefferson County Roads By Attorney-in-fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order_ • -Replace all solvent-based paint products originally specified for use on this project and under this contract,with the Standard Fast Dty Waterborne paint products described on the Contractor submitted Request for Approval of Material form dated 6/14/2018(copy attached)_ -Provide and install the replacement materials described above,in the quantities originally specified in the Project Bid Proposal for this contract,and at the revised unit costs for those bid items as described in the attached Exhibit A. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provision for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT: AMOUNT: THIS ORDER: AFTER CHANGE: $306,823.89 $306,823.89 $19,291.70 5287,532.19 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME: CONTRACT TIME: CHANGE(Add/Del): TIME: Twenty-five(25) Twenty-five(25) N/A Twenty-five(25) working days working days working days APPROVA RECOMMENDED APPROV ENDED Project.14 r Date County finer ' Date AP94.) APPROVED Engine rg n e'er;Ytanager Dale Chair,Jefferson County Commissioners Date I A s Sheet 2 of 2 JEFFERSON COUNTY Contract No.: 180 542 20490 DEPARTMENT OF PUBLIC WORKS Date: 6/25/2018 Change CHANGE ORDER NO.1; EXHIBIT A Order No.: 1 ESTIMATED ITEM GROUP UNIT UNIT ESTIMATED AMOUNT NO. NO. ITEM DESCRIPTION MEASURE PRICE QUANTITY CHANGE NEW ITEMS _ IN/A N/A N/A N/A $0.00 EXISTING ITEMS REVISED UNIT COSTS 1 SKIP CENTER PAINT LINE(single application) LIN.FT. $0.045 119,345 $5,370.53 2 SKIP CENTER PAINT LINE(double application) LIN.FT. $0.095 8,733 $829.64 3 _ SINGLE NO PASS CENTER PAINT LINE(single application) LIN.FT. $0.110 217,555 $23,931.05 4 SINGLE NO PASS CENTER PAINT LINE(double application) LIN.FT. $0.235 18,876 $4,435.86 5 TWO-WAY LEFT TURN(single app)I LIN.FT. $0.295 4,213 $1,242.84 6 DOUBLE NO PASS CENTER PAINT LINE(single application) LIN.FT. $0.190 522,550 $99,284.50 7 DOUBLE NO PASS CENTER PAINT LINE(double application) LIN.FT. $0.290 26,813 $7,775.77 8 CHANNELIZATION(=Two X Double No Pass CL)(single app) LIN.FT. $0.395 4,992 $1,971.84 9 PAINTED EDGE LINE (single application) LIN.FT. $0.090 1,016,422 $91,477.98 10 PAINTED EDGE LINE(double application) I LIN.FT. $0.220 51,560 $11,343.20 11 ADDITIONAL PAINTED EDGE LINE(single app) LIN.FT. $0.095 10,867 $1,032.37 12 PAINTED WIDE LINE(WHITE)(single application) LIN.FT. $0.295 12,474 $3,679.83 13 PAINTED WIDE LINE(WHITE)(double application) LIN.FT. $4.500 26 $117.00 14 PAINTED WIDE LINE(YELLOW)(single application) LIN.FT. $0.900 272 $244.80 15 PAINTED WIDE LINE(YELLOW)(double application) LIN.FT. $2.900 50 $145.00 REVISED ITEMS SUBTOTAL: $252,882.19 TRAFFIC CONTROL;UNREVISED ITEM SUBTOTAL: $34,650.00 NEW ESTIMATED TOTAL: $287,532.19 ORIGINAL ESTIMATED TOTAL: $306,823.89 ESTIMATED NET CHANGE TOTAL: -$19,291.70