HomeMy WebLinkAboutlogged023Emma Bolin
From: Leader Legals <legals@ptleader.com>
Sent: Friday, May 18, 2018 11:50 AM
To: Emma Bolin
Subject: Re: Publish MLA17-00095
Attachments: 174518_15833_Bolin_JTALandUse_Proof_05232018.pdf; ATT00001.htm; 174518_15833
_Bolin_JTALandUse_Quote_05232018.pdf; ATT00002.htm
Attached are the proof and quote. Please review and respond with print approval.
Micah
Micah
JEFFERSON COUNTY
PUBLIC NOTICE OF TYPE III LAND
USE APPLICATION
MLA17-00095
APPLICANT:
JEFFERSON TRANSIT
63 4 CORNERS RD
PORT TOWNSEND WA 98368 9366
Application Received Date:
December 20, 2017
Application Complete Date:
May 18, 2018
Application Notice Date:
May 23, 2018
SITE ADDRESS AND PROJECT LOCA-
TION:
Parcel number 001 332 009, Section 33,
Township 30N, Range 1W, WM, located at
63 Four Comers Rd, Port Townsend 98368
PROJECT DESCRIPTION AND REQUIRED
PERMI TSISTUDIES:
TYPE III CONDITIONAL USE PERMIT to
utilize electronic changing message technol-
ogy which is an attribute of a sign previously
installed at the Jefferson Transit Center.
The sign location and size was reviewed
under building permit, BLD14-00015. Sign
Installation and testing was authorized by a
Board of County Commissioners Agreement;
however the Agreement did not authorize the
proponent to utilize the proposed changing
message technology until such time Jeffer-
son County Code Section 18.30.150 would
be amended to reflect that location of such
sign in a residential zone would be a lawful
use. Since the agreement, Ordinance 1f 1-16
amended Jefferson County Code to require
a conditional use permit for governmental
signs in residential zones. The sign is within
150 -feet to the logical outer boundary of a Lo-
cal Area of More Intense Rural Development
(LAMIRD).Because the sign was installed
before the ordinance was approved, BLD14-
00015 approval was denied. A building per-
mit application will be required to formalize
the final county building approval for the sign.
The project is exempt from SEPA review un-
der WAC 197-11-800(2)(c).
COMMENT PERIOD AND WHERE TO
VIEW DOCUMENTS:
The application and any studies may be re-
viewed at the Jefferson County Department
of Community Development. All interested
persons are invited to (a) comment on the
application; (b) receive notice of and par-
ticipate in any hearings; and (c) receive a
copy of the decision by submitting such writ-
ten comment(s)/request(s) to the Jefferson
County Department of Community Develop-
ment, Development Review Division, 621
Sheridan Street, Port Townsend, WA 98368,
(360) 379-4450. Comments conceming this
application should be submitted to the De-
partment by 4:30 p.m. on June 6, 2018. If
the last day of the comment period falls on
a weekend or holiday, then the comment pe-
riod shall be extended to the first wanking day
atter the weekend or holiday. Comments sub-
mitted alter this date may not be considered
in the staff report.
Project Planner:
Emma Bolin, 360-379-4484
For further information, please visit the
Jefferson County Department of Com-
munity Development web page at http://
www.co.jefterson.wa.us/260/Community-
Development
1745185/23