Loading...
HomeMy WebLinkAboutMLA17-00095 Conditional Use Permit ApprovalJEFFERSON COUNTY w DEPT. OF COMMUNITY DEVELOPMENT UNIFIED DEVELOPMENT CODE Al,,�O' TYPE III LAND USE PERMIT APPLICANT: JEFFERSON TRANSIT 63 4 CORNERS RD PORT TOWNSEND WA 98368-9366 DATE ISSUED: July 13 2018 DATE EXPIRES: July 13, 2021 MLA NUMBER: MLA17-00095 CASE NUMBER: ZON17-00028 PROJECT CONTACT: Emma Bolin PROJECT DESCRIPTION: TYPE III CONDITIONAL USE PERMIT to utilize electronic changing message technology which is an attribute of a sign previously installed at the Jefferson Transit Center. The Department of Community Development (DCD) reviewed the location and size of the sign under building permit, BLD14-00015, but said sign was not to include changing message capability. A Board of County Commissioners Agreement authorized Jefferson Transit to install and test the sign but did not authorize Transit to utilize the proposed changing message technology "until such time as County Code Section 18.30.150 is amended to reflect that location of such sign in a residential zone would be a lawful use." Since the agreement, Ordinance # 1-16 amended the Jefferson County Code allowing changing messages signs which are also governmental signs through a conditional use permit process if the sign is placed or installed within 150 feet of the logical outer boundary of a Limited Area of More Intense Rural Development (LAMIRD). The sign is within 150 -feet to the logical outer boundary of the 4 Corners LAMIRD. Because Transit installed the sign before ordinance approval, DCD denied BLD14-00015. A building permit application will be required to formalize the final county building approval for the sign. The project is exempt from SEPA review under WAC 197-11-800(2)(c). PROJECT LOCATION: Parcel number 001 332 009, Section 33, Township 30N, Range 1W, WM, located at 63 Four Corners Rd, Port Townsend 98368 CONDITIONS: 1.) The applicant shall adhere to all conditions in the Hearing Examiner Decision (dated July 9, 2018) as indicated in Conditions #2-7 below. 2.) The sign image or message shall remain fixed for at least three seconds before changing to a different message. 3.) Animated graphics shall not be displayed on the sign. 4.) The proponent shall test the sign, initially in July, and annually in December thereafter with the final test submitted in December 2020, and shall submit testing results to Jefferson County of the foot-candle measurement. If the sign exceeds the 0.3 foot candle limit above ambient light, Jefferson Transit Authority shall program the sign timer to turn off from 10:00 p.m. to 4:00 a.m. The measurement shall be taken from a point 316 feet away from the east and the west of the sign as well as from the right of way adjacent to 40 Four Corners Road. The measurement shall be taken during the hours of 10:00 p.m. and 2:00 a.m. 5.) A conditional use permit automatically expires and becomes void if the applicant fails to file for a building permit or other necessary development permit within three years of the effective date (the date of the decision granting the permit) of the permit unless the permit approval provides for a greater period of time. 6.) Extensions to the duration of the original permit approval are prohibited. 7.) The Department of Community Development shall not be responsible for notifying the applicant of an impending expiration. FINDINGS: 1.) The Administrator finds that this application complies with applicable provisions of the Unified Development Code, all other applicable ordinances and regulations, and is consistent with the Jefferson County Comprehensive Plan and Land Use map. 2.) A public hearing was held on June 26, 2018 at 2:00 pm. The Hearing Examiner granted approval subject to the conditions contained within the Hearing Examiner Report on July 9, 2018. 3.) The staff report prepared for the hearing examiner includes findings for this permit (dated June 15, 2018). Findings are also within the Report and Decision prepared by the Hearing Examiner dated July 9, 2018. APPEALS: Pursuant to RCW 36.70C, the applicant or any aggrieved party may appeal this final decision to the Hearing Examiner within fourteen (14) calendar days of the date of issuance of this land use decision. For more information related to administrative appeals see JCC 18.40.340. July 13.2+018 AWCMrm6lnistr�a�tor Date MLA17-00095