Loading...
HomeMy WebLinkAbout080618_ca04 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Engineer Agenda Date: August 6, 2018 Subject: Change Order No. 1 Dosewallips Road MP 1.67 Permanent Repair County Project No. 18019960 Statement of Issue: Change Order No. 1 with Hanson Excavation, LLC. for Dosewallips Road MP 1.67 Permanent repair, Project No. 18019960, County Road No. 250008. Analysis/Strategic Goals/Pro's £t Con's: The objective of the project is to complete the repairs to Dosewallips Road at the location of a slide in 2014.The work has been completed and Change Order #1 is necessary to increase the total contract amount to reflect actual final quantities for each bid item in the contract and to the add the cost of additional work items added in response to unanticipated conditions encountered during construction. Fiscal Impact/Cost Benefit Analysis: This change order will increase the total contract amount by $5,387.66 from $131,667.10 to $137,054.76 Construction of this project is funded 90% by RAP grant funds administered by the County Roads Administration Board. Recommendation: Public Works recommends that the Board execute all three (3) originals of Change Order No. 1 with Hanson Excavation, LLC and return two signed (2) originals to Public Works for further processing. Department Contact: Bruce D. Patterson, P.E., Project Manager, 385-9169. Reviewed By: "If P'ip Morle Co my Administr for Date JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change Order No. 1 Date: 7/6/2018 CHANGE ORDER Ordered by County Engineer under terms of []Section 1-04.4 of the Standard Specifications Contract No. 18019960 LIChange proposed by Contractor To Hanson Excavation, LLC Endorsed by: Hanson Excavation, LLC 86 SE Banjo Ln. r Firm Name Shelton,WA 98584 Air 7/ch/IN Signature " Date Title Consent giv by Surety.'(when required) Project Title Dosewallips Road MP 1.67 Permanent Repair By Attorney-in-fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: This change order will make the following changes to the contract: 1.Add item#24-Removal of Existing Culvert 2.Add item#25-Retaining Wall to Support Embankment 3.Add Item#26-Catch Basin Modifications 4. Add Item#27-Additional 2 foot post length for bid item#13 Guardrail (11' post installed instead of the 9' post) 5.Adjust the quantities for existing pay items to reflect the actual quantities incorporated into the project. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $131,667.10 $131,667.10 $5,387.66 $137,054.76 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME CONTRACT TIME CHANGE(Add/Del) TIME 20 Working days (work 20 Working days 0 20 completed) APPROVAL RECOMMENbp APP D VAL RECOMI'''DED .\L-„...).34.."--....--........ . 7/10/18 . ti Project Mai ager Date County Engin--+ Date ROVAL R'I OMMENDED APPROVED i'y6 Engineering Servi,es Manager Date Chair,Jefferson County Commissioners Date JEFFERSON COUNTY Contract No. 18019960 Sheet 2 of 2 I DEPARTMENT OF PUBLIC WORKS 1 I ___I_ Change 1 Date: 7/7/2017 CHANGE ORDER ESTIMATE Order No. _ ESTIMATED ESTIMATED — — - - - ITEM GROUP DESCRIPTION UNIT UNIT QUANTITY AMOUNT - NO. NO, MEASURE PRICE CHANGE CHANGE — - -- - NEW ITEMS L 24 REMOVE EXISTING CULVERT LUMP SUM $1,128.00 1.00 $1,128.00 25 RETAINING WALL TO SUPPORT ENBANKMENT LUMP SUM $5,794.85 1.00 $5,794.85 26 CATCH BASIN MOFIFICATIONS LUMP SUM $1,340.00 1.00 $1,340.00 -,- 27 ADDITIONAL 2'POST LENGTH FOR BID ITEM 13 L.F. $21.00 62.50 $1,312.50 EXISTING ITEMS —r- 5 LIGHT LOOSE RIPRAP C.V. $57.50 -4.7 ($270.25) 7 DUCTILE IRON SEWER PIPE 12 IN.DIAMETER L.F. $54.00 0.9 $48.60 8 CRUSHED SURFACING BASE COURSE TON $46.00 9.11 $419.06 9 HMW CL.1/2 IN.PG 64-22 TON $118.00 -13 ($1,534.00) 10 EROSION/WATER POLLUTION CONTROL EST. $1,000.00 -1 ($1,000.00) 11 EXTRUDEDCURB TYPE 3 L.F. $12.00 2.5 $30.00 12 BEAM GUARDRAIL TYPE 31 L.F. $45.50 -20 ($910.00) 13 BEAM GUARDRAIL TYPE 31 -9'LONG POST L.F. $54.00 12.5 $675.00 15 PAINT LINE LF $1.20 -210.5 ($252.60) 16 PLASTIC DRAINAGE MARKER EACH 40 2 $80.00 17 TEMPORARY PAVEMENT MARKING L.F. $1.00 -73.5 ($73.50) 19 FLAGGERS HOUR $50.00 -28 ($1,400.00) - T- 1 - I ESTIMATED NET CHANCE TOTAL: $5,387.66