HomeMy WebLinkAbout092418_ra01 Regular Agenda
10:00 a.m.
Commissioners Chambers
JEFFERSON COUNTY
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
TO: Board of County Commissioners
Philip Morley, County Administrator
FROM: Leslie Locke,Executive Assistant
DATE: September 24,2018
SUBJECT: Briefing re: Washington State Ferries' Long Range Plan
STATEMENT OF ISSUE:
Tom Thiersch, Ferry Advisory Committee Chair will give a briefing on the Washington State Ferries' Long
Range Plan. A copy of a powerpoint presentation, and a comment letter by the Island County Board of
Commissioners is attached to this memo.
RECOMMENDATION:
No Action Required
RE WED BY:
APTVW
�' ip Morl i '. my Adminis for Date
:Ti WSDOT
Washington State Ferries
Draft 2040 Long Range Plan
Presented to the Jefferson County
Board of County Commissioners
Original PPT by Ray Deardorf, WSF Senior Planning Manager
Additional material by Tom Thiersch, Chair of Ferry Advisory Committee,
Jefferson County/Port Townsend Terminal
September 24, 2018
Topics
• Draft Long Range Plan elements
— Reliable service
— Customer experience
— Manage growth
— Sustainability and resilience
— Implementation, investments and financial outlook
• Consistency with other plans
• Port Townsend-Coupeville: Route -Specific
— Improvements
— FAC Comments
• Fall 2018 community engagement plan
• Sources for more information
Reliable
* Replace aging vessel and invest in new vessels to maintain reliable service.
* Preserve and improve terminals to enhance safety and operations.
* Invest in attracting} retaining, and strengthening the workforce .
Customer experience
* Provide better trip planning information.
* Reduce customer wait times.
* Enhance multimodal connections and accessibility.
Manage growth
* Increase walk-on, ridership.
* Spread out demand and maximize existing assets.
Sustainability and resilience
* Green the fleet and reduce our environmental footprint.
* Plan for emergencies and climate change to sustain reliable service through 2040.
�'WSDOT
3
Service and terminal enhancements
2040
aYN , Sidney
Orcas
I
Shaw,
I Friday Lopes
bac r;' HarbGr AnaeorteS
Upgrade terminal
Add overhead loading Jrrprove terminal
and seiand slip for reservadons atr
f M! l - Norton
CANADA
USA zo
Port Canpeville
Pan.�ngeles Townsend
Jul,. _ Add overhead loading
SERVICE ENHANCEMENTS
24 E,ventt
Route capacity increase
Cli niton
Newvessef New terminal
10 IMluldlte€r
Additional service hours Improve access and
Kingston
Increase Passenger capacity quruenrana$ement _Cmtyres Address
R 8 p � _ operational
Edmonds constraints
TERMINAL, ENHANCEMENTS Replace pverhe d
loading
Major preserva tia n )
yr improvement Bainbridge Island ,����5catile
0 Electrification`,.r
BreII1C�rl � New terminal
r
Fsrrntleroy
Add second slip Preserve terminal and
address constraInts
5authworth 'rxaSiron
Sil..G
Tahlequah
6y. Pt. Defiance
urairt pian i
7Fount] erey,Vashon/ TEdmlonds/Kingstof
Southworth decision decision milestone
milestone • New vessels
■ New vessels (124) (144 or 202)
Southworth . Edmonds term
2nd slip and improvements
Fauntleroy terminal
improvements
Vt
2
New
build program
U VIDecislon milestone
=LNew vessels Oympic
d
0 Jumbo Mar4 II Hybrid
7 Electric Conversion 5 nv v C]Iyn7pi.r Cl.asc Anew vessels(12A)
h
W
w i
..j
LL
2 ..
.i _2
Mukittea Colman Dock Gauntleray Girton
Eric4ay l-larbar
Lu� Ba3rriFridge Sauthwtrth Arsacartcs Caprz
CL
17e�1'fiky 18 iaminak
W 30% of employees ellgible to retire from 2014.2024
[] WSF Workforce Increase investment In warkfaree development
V- ¢kwelgprnent
` for rnentpr and tralning programs
0:
supplemental plain
WSDOT
2030 2040
S lrS duhn Initr. I;Und
Increase ees$tl capacity-
h+ iukllteaXIinten lfalflwlnUerlspr ngi
� lrscreasav+esselcapac[ty:
Edmcrids/Kingttorr i1?ptyera p�: third vosx�q
k Add service hours:
Anacenes/San Juan [stands. Faundaray/VashowSouthworth Cwlrhtertspringfsurn"r & 2 -season schedule), Pt, Defiance/Tahlequah inwddsyl
Add scrvicc hours:
Port TbwaserWCrwpertiie ispring/stsmmerl
Increasepassenger capaclty:
Seattle/Ralnbrldge and SeattleMro"rton
Iowa -di Ta'hil Hybrid Electric iCanverslon -
Optipo A_ 7 new v4 s5t l5 {144}
Option B. b new vessels {two 2012 and four
Edmonds
Reliable service —Stabilize the system
to maintain reliable service through 2040.
Draft Plan recommendations:
• Stabilize the fleet by building new vessels.
• Maintain and improve terminal efficiency.
• Develop workforce.
rrr 1 ..�
-
M r
A
H
:TarF40161 r_
- ■ r • I ■ V - A .
Tillkum
Hyak'
WSF's current
Kaleetan plans assume
Yakima terry vessels will
11wha� last for 60 years.
Between nava and
Spokane 20440, 13 vessels
Walla Walla will be at or near
the end of their
Issaquah planned lifespan.
Kittitas
Kitsap
Cathlarnet
Chelan
Sealth
Tacoma
Wenatchee
Puyallup
Chetzemoka
Salish
Kennewick
Takitae
Samish
Chimacum
Suquamish
Aw
wr,FWSDOT
7
Reliable service — Replace aging
vessels to maintain reliable service.
Draft Plan recommendations:
• Near -term -
Top reasons for service cancellation:
Crewing
— Build five new vessels, 7(3.0) Other'
replace Super class Emergency/ 3(1.3%)
• Long-term: security Schedule reset
— Comprehensive construction
program — replace Issaquah
and Jumbo Mark I class.
• Review policies-
- Vessel lifespan
— Contracting restrictions
— Vessel procurement
processes
— Performance measures
Weather/ Vessel/
tides mechanical
78 J33.3%11 116(49.6%)
Reliable service — Invest in new
vessels to maintain reliable service.
Draft Plan recommendations:
• Build new vessels to provide reliable service during scheduled maintenance and
allow for needed maintenance time.
• Plan more time for maintenance.
• Enhance service when relief fleet is complete.
Existing policy
Long Range Plan
recommendation
Planned
maintenance
=feet size weeks
22 8
26 1 12
Reliable service —Preserve and improve
terminals to enhance safety and operations.
WCW5
,M Amples
0
Oras
Shaw
o
Friday P
Fl8rhor
Bellingham
Draft Plan recommendations:
Improve dwell time and reduce
5 •
operational conflicts.
*Verilon
Enhance multimodal
Mtconnections.
Port Upevilie
Townsend
Bainbridne Island
Bremer -ton
FM21
Clinton
hlukil#eo
ng Ston
Edmonds
eat'tle
s�
f -~
Fauntleroy
0
I Vashon
S
Tahlequah
Pt Def lance
Ta�onws
• Add electric vessel charging and
infrastructure.
• Establish dwell time performance
measures.
Reliable service — Invest in attracting,
retaining, and developing workforce.
Draft Plan recommendations:
• Develop program to retain, recruit, train, and mentor staff.
• Update salary survey to reflect market conditions.
Deck. officers eligible to
retire in five years
Second Mate IN
Chief Mate 29
:ter (Iulu4es
Staff Mai.ters]
Licensed engineers eligible
to retire in fire years
,t Engineer 25%
Chief Engineer 53%
Customer experience - use
technology to enhance customer experience.
Draft Plan recommendations:
• Give customers better trip planning information.
— Ticketing and reservation system.
— Customer alerts.
— Accurate terminal conditions and wait times.
— Terminal wayfinding and real-time
information.
— Real-time parking information.
• Reduce wait times.
— Improve terminal operations.
— Increase service and maintenance relief
vessels.
— Upgrade technology.
Manage growth — Invest in technology
and adjust schedules to spread demand and
encourage walk-on riders.
Draft Plan recommendations:
• Promote walking and biking to improve
efficiency.
• Use technology to measure vehicle wait time.
• Evaluate expanding reservations.
• Further consider pricing demand
management.
• Policy:
— Add passenger level of service.
— Measure space available for reservations.
— Add vehicle wait time performance
measure.
Manage growth — Adjust schedules and
vessel capacity to manage demand.
Draft Plan recommendations:
• Increase service hours.
— Restore service hours.
— Adopt two -season schedule.
— Consider options for Central Sound routes.
• Strategically increase vessel capacity.
Manage growth — Adjust schedules and
vessel capacity to manage demand.
4,500,000
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
Annual Vehicle Capacity Changes*
PT/Coup Pt Def/Tahl Sea/Brem Sea/Bain Ed/King Muk/Clin FVS ANA/Sid ANA/SJI
Baseline Vehicle Capacity Service Enhancement Vessel Change
*Includes Option A for Edmonds/Kingston
Manage growth — Increase passenger
capacity to encourage walking and biking.
Draft Plan recommendations:
• Increase passenger capacity on Bremerton and Bainbridge routes.
Peak sailing ridership with
vessel passenger capacity increases
3,000
2,500
2,000 11800
1,500
1
1,000 ,458
500
Ia
Sea-Brem
Baseline PAX Capacity
2040 fPAX +Driver)
2,400
nmp�
2,126
Sea -Bain
Vessel Capacity Increase
Manage growth — Operational Strategies to
spread demand and encourage walk-on ridership.
Draft Plan recommendations:
• Expand reservations.
• Consider pricing and fare structure.
• Partner with transit providers to improve multimodal connections.
• Give customers real-time trip planning information.
• Improve fare collection.
Options for Central Sound
routes —Relieve congestion
• Option A: Replace two large vessels with three mid-sized vessels.
• Option B: Continue operating two large vessels.
Sustainability and resilience -
Green the fleet and reduce our
environmental footprint
Draft Plan recommendations:
• Green the fleet.
— Reduce fuel consumption.
— Electrify fleet.
— Quiet ferries to reduce impact to Orca
whales.
• Promote walk-on ridership.
• Improve operational efficiency.
— Reduce idle time for queued vehicles.
— Improve buildings' energy efficiency.
• Organizational strategy.
— Baseline and reporting.
Projected CO2 emissions
Annual CO2 Emissions
RCW 70.235.050 Reduction Requirements
180
a 140
0
•L
120
O
N
100
N
7
O
80
N
0
N 60
E
W
N
0 40
20
x
15% Reduction by 2020
Recommended fleet composition by 2040
Plug-in hybrid
Diesel
Tyrtal fleet size
2018 fuel consumpt.Gn
17 ftsiiiian 80110rrs
2040 fuel consumption
millian gaffons
36% Reduction by 2035
1
1
57.5% Reduction by 2050
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
Year
0
23
x
18
23
12 22
13 4
25 26
23
36% Reduction by 2035
1
1
57.5% Reduction by 2050
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
Year
Resilient system - Pian for
emergencies and climate change to
sustain reliable service through 2040
Draft plan recommendations:
• Plan for earthquakes and long term rising
sea level.
— Establish key routes for repair.
— Identify and prioritize seismic upgrades.
— Develop emergency response plan.
— Explore alternative landing sites and
loading methods.
— Identify fuel supplier emergency access.
— Increase fleet size for emergency relief.
— Assess terminal elevation needs.
— Evaluate design standards.
• Identify potential partners and funding
sources.
Investment and implementation -
Plan for a safe, reliable, sustainable, and
integrated system.
Near term (0-2 years) — Stabilizing the system
Medium term (3-7 years) — Building the infrastructure
Long term (8-20 years) — Responding to growth
• Capital costs
— Vessels
— Terminals
— Technology
• Operating costs
— Labor increases
— Fuel (Energy) decreases
— Other
Investment and implementation -
Draft capital costs (in millions)
PF'W $5,500
$1,800 $187
$- $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 $7,000 $8,000
Vessels:
• 16 New vessels (hybrid -
electric).
• 6 Existing vessel
conversions.
Vessel Terminal IT
Terminals: Information technology:
• Operational improvements System upgrades and
projects. enhancements to support
• 18 Terminal conversions operations.
and utility upgrades for
electric charging.
Investment and implementation -
Draft operational costs
Dollars by category and biennium (in millions):
$700
i'
$500
i'
$300
$200
$100
N N N N N N N N N N N
O O N N N N N O O O O
Cfl � W Cn �I Cfl � W Ui �I Cfl
Biennium (2019 through 2039)
tLabor
Energy/Fuel
Other
Investment and implementation -
Draft operating revenue recovery
100.0%
80.0%
60.0%
40.0%
20.0%
0.0%
Biennium (2019 through 2039)
N
N
N
N
N
N
N
N
N
N
N
O
O
O
O
O
O
O
O
O
O
0
N
N
N
N
N
W
W
W
W
W
Cn
(0
W
�I
�
N
N
N
N
N
GJ
W
GJ
GJ
W
W
01
-1
CO
W
U1
�1
CO
Biennium (2019 through 2039)
Investment and implementation -
Draft total planCOMS (in millions)
Funding Capital Investments:
M
$- $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 $7,000 $8,000
Funding Operations:
$0 $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 $7,000
Dedicated Tax Revenue
Shortfall
Operating Revenue
Dedicated Tax Revenue
Shortfall
Investment and implementation -
Draft total plan costs
Capital and operating costs through 2040: $14.2 billion
Dedicated tax revenue and fare collection: $7.5 billion
Capital and operating funding needs through 2040: $6.7 billion
Historically the Legislature has appropriated additional revenues to cover the
shortfall between dedicated WSF revenues and WSF operating and capital
funding needs.
Consistency with other plans
The Washington Transportation Plan (WTP) and WSF Long
Range Plan have been developed in parallel. The plans
emphasize common themes:
• Improve system reliability and efficiency
• Enhance multi -modal connections
• Manage demand
• Improve resilience and sustainability
Plans of local jurisdictions were also reviewed to assess:
• Potential impacts of planned development near terminals.
• Adequacy of transit and non -motorized connections.
• The extent to which policies in local plans support ferry service
and the multi -modal facilities needed for that service.
Port Townsend Routes Improvements
The LRP includes these actions for the Port Townsend-
Coupeville Route (see Page 108)
• 2020 Add 2 hours of service per day
• 2027-09 Trestle and bridge structure preservation (PT)
• 2028 Extend 2 -boat spring service season
• 2031 Terminal electrification
• 2032-33 Hybridization of existing 64 -car ferries
Port Townsend - FAC Comments
The Ferry Advisory Committee's joint comments on the Draft
LRP are (1):
• Support letter from Island County Commissioner Helen Price
Johnson
— Add 2 hours of service per day in 2019
— Extend 2 -boat service season sooner than 2028
— 2 -boat service should start before Easter, end after
Thanksgiving
— Add 2 -boat service for year-end 3 -week holiday season
• Conduct new study for Keystone Harbor / PT Terminal
— Allow use of common medium-size fleet vessels
— Potentially avoid cost of hybridization of 64 -car ferries
— Reduce/eliminate tidal current cancellations, grounding
errors
Port Townsend - FAC Comments
The Ferry Advisory Committee's joint comments on the Draft
LRP are (2):
• "144 -car" should be the new, common medium-size vessel
• "124 -car" size seems unnecessary and costly
• Fewer classes of vessels will reduce costs for
— Design / engineering / construction
— Training
— Maintenance
— Parts
• Incorporate solar energy systems into electrification plan
— Large-scale energy storage at terminals
— Reduce load on grid
— Improve resiliency in the event of natural disaster
Fall community engagement
• 11 system -wide open houses
• Expanded onboard outreach
• Online open house
WSFlongrangeplan. com
_r
Sidney
16.- r Orcas
Bellingham
ti � *4anaw
I 1
►s
victoria 1 Friday Lopez Anacortes
Harbor
CAWA • 20 Mi. Vernon
USA
Shelton
Southworth �` Vashon
16 *Tahlequah
9P1. defiance
0 Tacoma
Port Coupeville j
Townsend
ark Angeles 101
1`
525 Everett
20 Freeland AGI rlton 2
North
104 M u ki lteo
Open house
Hood Kingston
location
Canal
Bridge •# 4'
Edmonds
3
Seattle
Bainbridge Island g
Bremerton
Shelton
Southworth �` Vashon
16 *Tahlequah
9P1. defiance
0 Tacoma
•I•] :r. I I [:4ro 1 •
Summer Rall ',V rater Spring Summer
li
Develop Long Range Plan
Ridership forecasting (Summer 2017 - February 2018)
Analysis (Winter -- Spring)
Develop draft plan (Spring - Fall)
Progress report to legislature (June)
Stakeholder engagement
Executive Advisory Group meetings
Community engagement
Fall
Winter
l•
Finalize plan
Deliver final plan to Legislature (January 2010
Apri I -May Sept. -Oct.
Open houses Public meetings
33
WSDOT
More Information
Assistant Secretary Amy Scarton's LRP message is here-
https-//www.youtube.com/watch?v=Od XR4d97YA&feature=youtu.be
The LRP with Appendices is here as a list of separate documents:
https-//www.wsdot.wa.gov/ferries/plannin_. /q lon_q range-plan/the-plan
The presentation boards that we'll see at the PT open house in October are here:
https-//www.wsdot.wa.gov/sites/default/files/2018/09/13/WSF LRP boards fall 2018.pdf
See also https-//wsflongrangeplan.com/ for links to the online version of the Open House
presentation as well as an online Comment form.
Ferries are a vital part of our local economy,
and
would
be an essential lifeline in the
event of a widespread natural disaster such
as a
large
earthquake.
Please spread the word, review the Plan materials, and participate in the public
comment process.
Deception
Pass
WHIDBEY ISLAND
NAS Whidbey
Oak Harbor
Sea Aane
San de Fuca B ise
CAMANO
Coupeville ISLAND
Camano
Keysto ie
Q06
Island County Board of Commissioners
P.O. Box 5000
Coupeville, Washington 98239-5000
Saratoga
Langley
Freeland Bayvie%v
Clinton
Re,rY.
Maxivelton
September 7, 2018
Amy Scarton
Assistant Secretary
Washington State Ferries
2901 Third Avenue, Suite 500
Seattle WA 98121
Subject: Coupeville Ferry Route Capacity Increase Request
Dear Ms. Scarton,
Phone: (360) 679-7354
From Camano: (360) 629-4522
From S. Whidbey: (360) 321-5111
Fax (360) 679-7381
www.islandcounty.net
Demand for ferry service on the Coupeville to Port Townsend route exceeds supply and has not been
restored to historic levels that existed prior to the advent of the Kwa-di Tabil class of boats which began
to come into use in 2010. Specifically we request that both the 2019 budget and the long range plan
(LRP) be amended to include additional service as follows:
• 2019 budget: add 2 additional service hours daily during the peak season (May through October)
• LRP — extend 2 boat service prior to the Easter holiday and through the Thanksgiving weekend.
Additionally, resume 2 boat service for the 3 week period surrounding Christmas and New Year,
weather dependent as usual but more so considering the winter season aspect.
The current version of the LRP calls for expanded service in 2028. We are confounded by this date. In
the seven years since 2010 ridership on this route is up 43%. Further, the first quarter of 2018 numbers
were up 7.4% and the 2nd quarter 3.7%. The peak 3rd quarter has been equally heavy, with the exception
of the crab pot incidents. What is important is to avoid anything like the 10 week loss of the Salish in
2017. See the attached route growth table.
WSF has the vessel capacity needed to expand the service here, and these vessels are really only good
for this route. The KDTs (64 -car ferries) are a very poor fit on any other route for other than emergency
replacement situations. They are not very practical as "maintenance relief' vessels due to limited vehicle
and passenger capacity and high fuel consumption.
Lastly, there is much evidence that this route is constrained. It is true that the implementation of the
reservation system has provided a much improved experience for those who can use it. This has been
particularly important for commercial and military traffic. However during peak season, reservation slots
are constantly booked out. Further, the reservation system doesn't capture those who wish to ride but
can't. During the last two summers complaints about lack of availability have continued to increase.
WSF's route congestion chart shows likely drive up (standby) success on only 11% of the 216 weekly
sailings. Whidbey might not always be the final destination for tourists, but the lack of connections via
CV -PT reduces Whidbey tourism, and redirects those traveling to/from the Olympic peninsula,
increasing traffic onto the 1-5 corridor and the Edmonds -Kingston route.
Thank you for your attention to this issue. Please contact me or the Coupeville FAC Chairman Ralph
Young for more information. We look forward to continuing ferries success with the LRP.
Sincerely,
4b&:,w:._=fir — —
Helen Price Johnson
Island County Commissioner
Cc: Ralph Young, Coupeville Ferry Advisory Committee, Chair
Brian Wood, Island County Transportation Planner
CV PT Change in Ridership
Total Ridership % Change
Q2 18
3.7 total ferry system down .4%
Q1 18
7.4 total ferry system up 2.7%
2017
806,823
-1.5 loss of 1 boat for 10 weeks during 3rd qtr peak (crabpot)
2016
819,285
4.1
2015
787,391
8.9
2014
723,045
6.5
2013
678,622
-0.8
2012
683,944
3.2 2/14 Salish replaces Chet
2011
662,026
17.4 7/1 Kennewick
2010
563,804
11/14 Chetzemoka