HomeMy WebLinkAboutBLD1996-00303I
LO
I
I
I
:l.
M
I
A
30'-0"
5/8
9'-10 1/4"
9'-10 1/4"
9'-10 1/4"
2 5/8"
_
______________
6 x 10 DF Beam-------------�
6 x 6 DF Post, Typ
I
I
I
I
I
I
I
I �
c�
I
IR
@I
w
10.�1
n U
0 O
m
rn
q
o_
Garage Area
qi
I
® 30" x
30" Col. Footing
I
I
I
I
h
I
G.
"
I
I
I
o
I
I
I
Simpson Column Cap
o c
I
#CC5 1/4-6, Typ. U.O.N.
I �
�
Simpson Column Base
I
#CB66, Typ. U.O.N.
I
6 x 10 DF Beam
I V
- -
- - - --
-- - _ -
- -
' 5/8
- - - -
9'-10
- - - - - - t -
1/4"
- - - - - - - - - - -
9-10 1/4"
- - - - - ----
9'-10 1/4"
- -
Ground Floor/Foundation Plan
Scale 1/4' = 1'-0"
M
West Elevation - East Elev. Mirrored
NN
Scale 1/4" = 1'-0"
30'-0
2'-0" 6'-0" 2'-0" 2'-0" 2'-0" 2'-0" 1 2'-0" 1 2'-0" 2'-0" 2'-0"
2'-0" 1 2'-0" 2'-0"
Note: This Building is Unheated Space Only, Both Levels
in
Window Headers 4 x 8 DF Beams Unless Otherwise Noted
Storage
r i
�
20 Min. Fire Rated Door &Frame Ass'y
m
5/B" Fire Rated
Gyp. Bd. Wall @ o
o
Stair Enclosure
Handrail, Per Code 6
10'-0 3/4" 2'-8" w
q
cox
a
i
�
o
1
9 1 /4"
9'-10 3/4"
3'-0"
3'-6" 5'-6 1/4" 3'-6"
3'-9 3/4"
,.,
1rP (a 7?R.1 14T @ 9°
Upper Floor/Framin
Scale 1/4" = 1'-0"
Plan I )
3 #4
Bars Each
Way;
4 #4 Bars
Each
Way @
Sim.
Condition
6 Mil
Vinyl —
Vapor Barrier
4" Pea Gravel /
Scale 1/4" = 1'-0" v
6 X 6 @ DF Post
Simpson CB66
CB66 @ Sim.
Condition
6 X 6 WWM
4" Slab On Grade
,Ll
2'-6„
nn Pad Footing
= 1'-Y
-e Rated Gyp. Bd. Ceiling
1/2" Anchor Bolt @ 46' O.C.
#4 Bar Vert. 16" O.C.
One #4 Bar Top of
Foundation Wall Horiz.
& #4 Bars Horiz.
@12"O.C.
6 x 6 W.W.M.
4" S.O.G. w/ 6 x 6 W.W.M.
Over 4" Pea -gravel Base
2 #4 Bars Hot. of
Footing Horiz.
12
3
3 Tab Asphalt Shingles
Roof Paper
3/4 " Plywood
2 x 12 DF Roof Joist @ 16" O C
Metal Gutter
22 Ga. Metal Flashing run
12" up Roof Typ.
1'-0"
2 x Cedar Fascia Board
4 x 8 DF Header, Typ, U.O:N.
1 x 3 Cedar Trim
1 x 3 Fir Trim
1 x Fir Sill
5/8" Gypsum Board Ceiling
Thermal Insulated Window System
by Window Visions Inc.
1 x 3 Fir Trim
1 x Fir Sill
1 x 3 Cedar Trim
5/5" Gypsum Wall Board
2 x 4 DF Studs @ 16" O.C.
T-111 Siding
1 x 6 Fir Base
3/4' Plywood Subfloor
2 x 10 DF Joist
2 x 10 DF Rim Joist
6 x 10 DF Beam
Cedar Brick Mould
1 x Cedar Trim
2 x 3 DF Header
�2 x 3 DF Studs @ 16" O.C.
6 x 6 DF Column Beyond
See Plans For Base & Cap
1 x 6 Cedar Siding W/
Vent Spaces
2 x 3 Wood Sill Plate
2 x 3 Treated Mud Sill
I' 4" 0 T.L. D.S. Drain
I 4" 0 Perf. Ftg. Drain
N
L
6'
d
+ 16'-4
er Floor
+ 9'-1
z
`IN—NINNIN
V
Z
QM
W
W
V
Z
W
M
CIO
W
cc
M
cc
J
TJ
i
0 0 0
0 0
_—
v
C
CNNNNNN
_.
CD
'
- —
N
North Elevation
Scale 1/4" = 1'-0"
Section A -A
Scale 1/4" = 1'-0"
Wall Section
Scale 1 1/2" = 1'-O"
Da