Loading...
HomeMy WebLinkAbout180-595 - Roads Construction PrgmPublic Works JEFFERSON COUNTY 2015 BUDGET REQUEST BUDGET: County Roads 180-000-010 PROGRAM: 595 - Construction Program MISSION: To provide for the improvement of the County roadway system. 2012 2013 2014 2014 2015REVENUE:Actual Actual Projected Adopted Request Discretionary Funds 353,043$ 754,311$ (285,935)$ 328,325$ 710,610$ Operating Transfer from PIFF 96,525 122,850 1,000 State & Federal Grants CAPP Funds - - - - - Construction/Capital Funds 678,303 3,240,709 2,305,009 5,565,007 4,631,601 Total Revenues 1,031,346$ 3,995,019$ 2,115,599$ 6,016,182$ 5,343,211$ 2012 2013 2014 2014 2015EXPENDITURES:Actual Actual Projected Adopted Request Salaries/Benefits 361,285 466,661 523,359 549,563 582,856 Supplies 5,134 91,116 11,850 15,000 Professional Services 492,850 955,836 456,348 302,438 256,450 Other services/Charges 1,633 8,095 13,298 9,000 4,500 Intergovernmental Serv.6,259 21,391 87,000 17,500 Land 28,747 228,307 124,558 60,000 5,000 Construction Outlay 139,720 2,215,527 964,513 4,993,181 4,476,905 Interfund Services 1,977 23,218 282 Total Road Construction 1,031,346$ 3,995,019$ 2,115,599$ 6,016,182$ 5,343,211$ STAFFING: Road Construction 3.73 4.78 5.61 5.61 6.00 Public Works JEFFERSON COUNTY 2015 BUDGET REQUEST BUDGET: County Roads 180-000-010 PROGRAM: 595 - Construction Program CONSTRUCTION PROJECTS (Motorized):2012 2013 2014 2015 Actual Actual Projected Budget 59500-Road Construction Administration 17,960 27,377 45,336 2,954 27,658 10,000 40,612 1805951799 - Dowans Creek Road Relocation 246,423 94,416 753,213 1,094,052 1805951951 - Dosewallips Permanent Repair 132,000 132,000 12,334 618,489 630,823 1805451848- Quinault South Shore Road Washout MP 1.2 ER 90,622 243,325 333,947 1805951896 - Access Preservation Hoh Rain Forest Olympic Nat'l Park PE 186,984 273,605 117,212 15,000 592,801 1805951896 - Access Pres. Hoh Rain Forest Olympic Nat'l Park MP 3.338 0 723,628 723,628 1805951896 - Access Pres. Hoh Rain Forest Olympic Nat'l Park MP 4.38 0 0 1805951896 - Access Pres. Hoh Rain Forest Olympic Nat'l Park MP 6.95 0 0 1805951626 - Donkey Creek Culvert Replacement 2,685 2,207 0 62,000 66,892 1805951873 - Paradise Bay Rd. Improvement MP 0.37 - MP 1.53 84,159 18,310 89,533 1,249,175 1,441,178 1805951881 - Queets Bridge Painting 206,492 2,333,722 395,647 2,935,861 1805951886 - Run Off Road & Intersection Safety Project 71,070 598,045 34,281 703,396 1805951933 - Quilcene Pedestrian & Bicycle Project Phase 1 3,050 57,387 126,889 187,326 1805951917 - Safe Routes to School: SR 19 & W. Valley Rd.44,740 98,331 285,000 428,071 1805951899 - Snow Creek Road Culvert Replacement 67,782 72,593 301,425 441,801 1805951918 - Duckabush Road Pavement Preservation 57 124,543 124,599 1805951934 - W. Uncus Road Culvert Replacement MP 0.804 1,881 38,904 40,785 180595xxxx - Upper Hoh RD./Olympic Nat'l Park FLAP MP 0.0 - 12.0 8,124 15,000 23,124 180595xxxx - W. Spruce & E. Alder Surfacing 50,000 50,000 County-wide Surfacing Upgrades 0 County-wide Various Improvements 0 30,000 30,000 Motorized Subtotal 650,684 3,761,783 1,933,125 3,734,134 10,066,371 Project totals 2012 - 2015 1805951927 - Center Road Overlay Phase 5 MP 0.00 - 2.26 1805951928 - Center Road Overlay Phase 6 MP 4.39 - 6.86 Public Works JEFFERSON COUNTY 2015 BUDGET REQUEST BUDGET: County Roads 180-000-010 PROGRAM: 595 - Construction Program CONSTRUCTION PROJECTS (Non-Motorized):2012 2013 2014 2015 Actual Actual Projected Budget 1805951069-Larry Scott Memorial Trail 281 3,736 4,017 1805951069-2 Larry Scott Trail Head 0 1805951935-Olympic Discovery Trail - NOVA Grant 8,072 15,077 23,149 180595xxxx - Discovery Bay Estuary Trail Connection - Planning 71,265 71,265 180595xxxx - Olympic Discovery Trail Segment A Phase 1 29,256 555,000 584,256 180595xxxx - Olympic Discovery Trail Segment A Phase 2 890,000 890,000 180595xxxx - TAP Nonmotorized Planning 39,000 39,000 1805951069-4 Larry Scott Trail Seg. 4 Acquisition 15,209 15,209 1805951069-7 Larry Scott Trail Seg. 4 Construction 245,456 79,801 325,258 1805951815 - Rick Tollefson Trail Phase 1 134,925 126,418 81,953 25,000 368,296 180595xxxx - Rick Tollefson Trail Ballfield Connection 85,000 85,000 Non - motorized Subtotal 380,662 233,237 182,474 1,609,077 2,405,450 Capital Expenditures Total $ 1,031,346 $ 3,995,020 $ 2,115,599 $ 5,343,211 $ 12,471,821 Project totals 2012 - 2015 SUMMARY OF KEY FUNDING/SERVICE ISSUES: The capital (construction) program relies heavily on grant funding. These funds are competitive and do not always provide the flexibility needed to meet County capital transportation needs. For example, many transportation grants are tied to a Federal Functional Classification system set for county roads. This means that many county roads are not eligible for federal or state grant funds even though they may be very important local roads with substantial traffic volumes. The Secure Rural Schools and Communities Program is funded at a reduced level and expected to be eliminated. This federal subsidy was created in the 1990’s to replace revenue lost in rural timber counties (like Jefferson County) as a result of drastic reductions in federal forest harvests in the wake of new environmental laws. This revenue source has historically represented the third largest source of regular road funding in Jefferson County (after property tax and motor vehicle fuel tax). Since these dollars can typically leverage grant funds at a 3:1 ratio in the capital program, this loss will dramatically affect Jefferson County’s ability to use grants for road improvements. Road preservation projects (sometimes referred to as “heavy maintenance”) are included in the construction program. While these projects are arguably the most important of the program, they often do not receive the attention (or the grant funding) they deserve. Preservation projects extend the life of existing infrastructure and include asphalt overlays, culvert replacement, bridge painting, etc. Much of the Jefferson County road infrastructure is over 50 years old. While the County’s chip sealing program has done a good job of preserving many of the road surfaces, underground infrastructure (culverts) are underfunded in the extreme. Replacing a single culvert can cost between $500,000 and $2,000,000 since most roads cannot be closed during construction and many of these culverts are very deep. There are over 2,500 culverts under Jefferson County’s roads. Since infrastructure preservation needs cannot be deferred forever, it is clear that either the revenue will need to be made available or the infrastructure will fall into disrepair to the point of being unusable. The 2015 Annual Construction Program (included) reflects projects selected from the 2015 – 2020 Six Year Transportation Improvement Plan. Public Works JEFFERSON COUNTY 2015 BUDGET REQUEST (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) IT EM NU M BE R 6 YE A R ROA D PROG RAM IT EM NO. ROAD LOG NO. ROAD/PROJECT NAME AND LOCATION (Include brief termini description or MP's; Bridge #) (Miles) FU N C T I ONAL CLA S S WO R K CODE ( S ) ENVIR ONM ENT AL AS S E S S MENT SOURCES OF FUNDS E S T I M A T E D E X P E N D I T U R E S - DOLLARS (shown is an example) COUNTY FUNDS $1,234,567 OTHER FUNDS PRELIM. & CONST. ENGRING 595.10 $1,234,567 RIGHT OF WAY 595.20 $1,234,567 CONSTRUCTION GRAND TOTAL ALL 595. AMOUNT $1,234,567 PROGRAM SOURCE CONTRACT $1,234,567 COUNTY FORCES $1,234,567 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 9 10 11 12 13 14 15 16 17 22 24 25 30 34 93150 14680 91160 25000 91420 91420 91420 50360 n/a n/a 51410 n/a 10750 n/a 50650 50020 n/a n/a n/a variable Center Road Overlay - Phase 5 Dowans Creek Road Permanent Repair Quinault-South Shore Road Repair Dosewallips Rd. Permanent Slide Repair Access Preservation: Hoh Rain Forrest OlympicNationalPark Access Preservation Hoh Rain Forrest Oly Nat Park MP3.338 Upper Hoh Rd/Oly Nat Park FLAP Project MP 0.00 - 12.0 Paradise Bay Rd, Phase 2, MP0.37 - 1.53 Rick Tollefson Trail, Phase 1 (Chimacum Valley) Rick Tollefson Trail - Ballfield Connection Safe Routes to School, SR 19 & West Valley Rd Quilcene Pedestrian & Bicycle Project, Phase 1 Donkey Creek Culvert, Clearwater Rd, MP 1.29 ODT South Discovery Bay Segments A & B - Planning West Spruce & East Alder Streets - Surface Upgrade W. Uncas Rd Culvert Replacment - MP 0.804 ODT South Discovery Bay - Segment A, Phase I ODT South Discovery Bay - Segment A, Phase 2 TAP Non-motorized Planning Multiple Locations Countywide Various Improvements 2.26 0.67 n/a 0.15 n/a n/a 12.00 1.16 0.30 0.25 n/a n/a n/a 1.08 0.30 n/a 0.50 0.25 1.01 var. 07 09 07 08 07 07 n/a 08 n/a n/a 06 02 08 n/a 09 09 n/a n/a n/a var. C B K A I I I A, B, D H H G, H G,H I H C I H H F, H A, C, G, H E I E I I I E E I I I I I E E I I I E E 97,205 31,500 13,200 15,000 124,916 85,000 62,000 1,524 50,000 55,000 140,000 5,265 30,000 10,000 656,008 211,825 118,800 15,000 723,628 1,124,259 25,000 285,000 126,889 13,553 38,904 500,000 750,000 33,735 RAP EMD/FEMA FHWA ER RAP PLHD PLHD RAP STP-R SRTS SRTS- PBSP RCO-NOVA RCO RCO-ALEA RCO TAP 10,000 30,000 233,325 15,000 15,000 38,083 25,000 15,000 55,300 126,889 15,077 38,904 39,000 5,000 10,000 4,808 5,000 723,213 132,000 723,628 1,206,284 229,700 62,000 555,000 890,000 25,000 65,000 50,000 10000 753,213 243,325 132,000 15,000 723,628 15,000 1,249,175 25,000 85,000 285,000 126,889 62,000 15,077 50,000 38,904 555,000 890,000 39,000 30,000 710,610 4,632,601 0 661,578 19,808 4,546,825 115,000 5,343,211 PROJECT LE NGTH STRATEGIC BUDGET OBJECTIVES: Transportation improvements support effective economic development as well as the safety of the public. ANNUAL CONSTRUCTION PROGRAM: [INSERT CRAB FORM] ANNUAL CONSTRUCTION PROGRAM FOR 2015 TOTAL $'S (A) TOTAL CONSTRUCTION PROGRAM - columns (14)+(15) $4,661,825 (B) PUBLISHED COUNTY FORCES LIMIT (see instructions) $1,261,950 (C) TOTAL COUNTY FORCES CONST PROGRAM-column (15) $ 115,000 AGENCY ACTION: COUNTY >> Jefferson DATE RECOMMENDED PROG. SUBMITTED DATE OF ENVIRONMENTAL ASSESSMENT DATE OF FINAL ADOPTION ORDINANCE/RESOLUTION NO. ** Line (B) must be smaller than Line (A ** DATE OF AMENDMENT PAGE / PROGRAM TOTALS, CONSTRUCTION Public Works JEFFERSON COUNTY 2015 BUDGET REQUEST PLANNED ROADS EQUIPMENT PURCHASES: [INSERT FROM ER&R per WAC 136-16-030] The annual road program shall also include a list of all major road equipment purchases and repairs contemplated for the year, together with the estimated costs thereof. 594.00.64.000 Machinery & Equip Public Works 1 Sedan (0731)R 17,500.00 17,500$ 1 SUV (0756)R 24,000.00 24,000$ 2 Pickup truck, 3/4-ton (0767 & 0768)R 26,500.00 53,000$ 2 Dump truck, 5-yard (0468 & 0212)R 115,000.00 230,000$ 1 Snowplow for 5-yard dump truck R 9,000.00 9,000$ 1 Spreader for 5-yard dump truck R 13,500.00 13,500$ 2 Dump truck, 10-yard (0600 & 0601)R 150,000.00 300,000$ 1 Snowplow for 10-yard dump truck R 12,000.00 12,000$ 2 Spreader for 10-yard dump truck R 18,000.00 36,000$ 1 Motor grader (0544)R 300,000.00 300,000$ 1 Loader, front-end (0412)R 205,000.00 205,000$ 1 Backhoe (0627)R 110,000.00 110,000$ 1 Roller, pneumatic (0549 R 70,000.00 70,000$ 1 Trailer, tilt (0624)R 30,000.00 30,000$ 1 Trailer, 10-yard pup (0663)R 38,000.00 38,000$ 1 Chipper, brush (0702)R 49,500.00 49,500$ 1 Truck, semi tractor (0539)R 120,000.00 120,000$ 1,617,500$ TOTAL