Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3_0 General Site Plan
ENGINEER: M. BUEHRER DESIGNED BY.- R. KOPKA DATE: 5-1-07 DRAWN BY.- M. BUEHRER DATE: 5-1-07 CHECKED BY- M. BUEHRER DATE: 5-1-07 PROD. MNGR: M. BUEHRER 2 11-30-07 REK MSB REVISIONS PER JEFFERSON COUNTY COMMENTS PROD. NO: 445dbg 1 5-07-071 REK MSB REVISIONS PER JEFFERSON COUNTY COMMENTS FILE NAME.- 445_WPD7 GenSite.dwg NO. DATE 1 BY APPR. REVISION SCALE: I "=200' 1w ENGINEERING 2020 ENGINEERING, INC. 700 DUPONT STREET POST OFFICE BOX 1621 BELLINGHAM, WA. 96227-1621 USA P: (360)671-2020 F: (360) 671-0322 www.2020enqineering.com WeFore � !K ` a 7401 CAPE GEORGE ROAD 25353 �ww l PORT TOWNSEND, WA 98368 I�IVA� / �O ��, \0 (425) 822-5242 EXPIRES FEBRUARY 16, 2009 z GRAPHIC SCALE 200' 0 200' 400' LEGEND: SCALE IN FEET — — — — — — DIVISION BOUNDARY TRAIL / PATH MAXIMUM CLEARING LIMITS (TYP) ss SANITARY SEWER LINE w WATER LINE s SURVEY POINT • REMOVABLE BOLLARD © PUMP CART PATH - EXISTING/TO REMAIN CART PATH - PROPOSED PAVED ROAD / SURFACE GRAVEL ROAD / SURFACE WETLAND AREA - - - - - HIGH WATER FLOOD 'NO -BUILD' PROTECTION ZONE LOW WATER FLOOD PROTECTION ZONE DISCOVERY BAY GOLF CLUB s""T C3.0 GENERAL SITE PLAN OF 37