Loading...
HomeMy WebLinkAboutShearer Design, LLC, Supplement No. 3 - 031119 ami - IHC k: 6 Supplemental Agreement Number: 3 Organization, Address, and Phone: Shearer Design LLC 3613 Phinney Ave. N. #B Agreement Number: 14-1021P Seattle, WA 98103 (206) 781-7830 Project Number: 18019341 Execution Date: Completion Date: October 27, 2014 March 31, 2019 Project Title: Salmon Creek Bridge, West Uncas New Maximum Amount Payable: Road $122,942.00 Description of Work: At the request of Jefferson County, the Consultant provided construction support services that exceeded the scope of the construction support services identified in Supplemental Agreement Number 2. These services included extra days for pile driving inspection, additional engineering time to evaluate foundation capacity, and additional engineering time for bridge girder shop drawing review. SUPPLEMENTAL AGREEMENT The Local Agency of Jefferson County Public Works hereby amends the agreement with Shearer Design LLC ("the Agreement"), executed on October 27, 2014 (and later amended through Supplemental Agreement(s) 1 and 2, executed on May 23, 2016 and March 23, 2018.) All provisions in the Agreement remain in effect, except as expressly modified by this Supplemental Agreement. The changes to the Agreement are described as follows: II Section II, SCOPE OF WORK, is hereby amended by adding extra days for pile driving inspection, additional engineering time to evaluate foundation capacity, and additional engineering time for bridge girder shop drawing review. V Section V, PAYMENT, shall be amended as follows: Task No. 7, Construction Support, will have a revised maximum amount payable of$19,962.00. The new, total maximum amount payable will be $122,942.00, as shown below. Supplemental Agreement(to A& B) Contract C, Version 1, Risk Legal Review Date 04/30/2018 Page 1 ora Task No. 7, Construction Support, will have a revised maximum amount payable of$19,962.00. The new,total maximum amount payable will be $122,942.00, as shown below. Task Task Description Current Supplement#3 New Maximum No. Maximum Amount Payable Amount Payable EXISTING TASKS 1 Project Management $5,948.00 $0.00 $5,948.00 2 PS&E $48,909.00 $0.00 $48,909.00 3 Environmental Services $0.00 $0.00 $0.00 4 Hydraulic Analysis $20,847.00 $0.00 $20,847.00 5 Geotechnical Analysis $14,477.00 $0.00 $14,477.00 6 Load Rating $12,799.00 $0.00 $12,799.00 NEW TASKS: 7 Construction Support $17,346.00 $2,616.00 $19,962.00 TOTAL $120,326.00 $2,616.00 $122,942.00 Supplemental Agreement(to A& B) Contract C, Version 1, Risk Legal Review Date 04/30/2018 Page 2 of 3 This Supplemental Agreement shall be effective upon execution by both parties. Work performed consistent with the Agreement prior to execution of this Supplemental Agreement is hereby ratified. In witness whereof,the parties hereto have executed this Supplemental Agreement Number 3 as shown below. S N EA1Z U2-- 5 t('13 COUNTY OF JEFFERSON (Consultant Firm Name) BOARD OF COMMISSIONERS Consultant's Name (Please print) Kat Dean, D' i 'ct Date /9-0.9 3/11M Consultant's SignatureDavid ullivan, i Date rIkT) D Date Greg :rotherton,District 3 D to Approved as to form only: PRE-APPROVED CONTRACT FORM Philip C. Hunsucker Date Chief Civil Deput Prosecuting Attorney C � s i Monte de *.E. Date Pub s Director/County Engineer Supplemental Agreement(to A& B) Contract C, Version 1, Risk Legal Review Date 04/30/2018 Page 3 of 3 Department of Public Works 0 Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Engineer Agenda Date: March 11, 2019 Subject: Supplemental Agreement No. 3 for Consultant Services with Shearer Design LLC for Salmon Creek Bridge, West Uncas Road MP 0.804, County Project No. 18019341 Statement of Issue: Public Works requests a modification of the scope of work and budget in the basic agreement with Shearer Design LLC to include additional services for the construction of Salmon Creek Bridge at West Uncas Road MP 0.804. Analysis/Strategic Goals/Pro's Et Con's: This supplement to the existing scope of work between Jefferson County and Shearer Design LLC is for construction support services for the Salmon Creek Bridge at West Uncas Road MP 0.804. At the request of Jefferson County, Shearer Design provided construction support services that exceeded the scope of the construction support services identified in Supplemental Agreement No. 2. These services included extra days for pile driving inspection, additional engineering time to evaluate foundation capacity, and additional engineering time for bridge girder shop drawing review. Fiscal Impact/Cost Benefit Analysis: The maximum amount payable for this supplement is $2,616.00. The maximum amount payable for the Shearer Design LLC agreement will increase from $120,326.00 to $122,942.00. This project is funded at 87% by the Salmon Recovery Funding Board, with the remaining 13% funded by a $100,000 National Fish Passage Program grant and the County Road Fund. Recommendation: The Board is requested to sign all three originals of the Supplemental Agreement with Shearer Design LLC, and return two originals to Public Works. Department Contact: Mark Thurston, P.E., Project Manager, 385-9160. evie y:y: 91-/X- - Philip Morley, Cou ty AdmiDist-rafor Date Local Agency Consultant/Address/Telephone Standard Consultant Shearer Design, LLC Agreement 3613 Phinney Ave. N. #B ®Architectural/Engineering Agreement Seattle, WA 98103 ❑ Personal Services Agreement Agreement Number Project Title And Work Description 14-1021P Engineering for: West Uncas Road, Salmon Creek Federal Aid Number Culvert Replacement Agreement Type(Choose one) ❑ Lump Sum DBE Participation Lump Sum Amount$ ❑ Yes ®No ❑ Cost Plus Fixed Fee Federal ID Number or Social Security Number Overhead Progress Payment Rate Overhead Cost Method 90-0949003 ❑ Actual Cost ❑ Actual Cost Not to Exceed % Do you require a 1099 for IRS? Completion Date ❑ Fixed Rate ❑ Yes ®No 12/31/16 Fixed Fee $ ®Specific Rates Of Pay Total Amount Authorized $ 76,241 ® Negotiated Hourly Rate Management Reserve Fund $ 0 ❑ Provisional Hourly Rate ❑ Cost Per Unit Maximum Amount Payable $ 76,241 Index of Exhibits (Check all that apply): ®Exhibit A-1 Scope of Work ®Exhibit G-2 Fee-Sub Specific Rates ❑Exhibit A-2 Task Order Agreement ®Exhibit G-3 Sub Overhead Cost ❑Exhibit B-1 DBE Utilization Certification i4 Exhibit H Title VI Assurances ®Exhibit C Electronic Exchange of Data ®Exhibit I Payment Upon Termination of Agreement ❑Exhibit D-1 Payment—Lump Sum ®Exhibit J Alleged Consultant Design Error Procedures ❑Exhibit D-2 Payment—Cost Plus ®Exhibit K Consultant Claim Procedures ®Exhibit D-3 Payment—Hourly Rate ❑Exhibit L Liability Insurance Increase ❑Exhibit D-4 Payment—Provisional ®Exhibit M-l a Consultant Certification ®Exhibit E-1 Fee Consultant Fee Determination ®Exhibit M-lb Agency Official Certification ®Exhibit E-2 Fee Specific Rates of Pay ®Exhibit M-2 Certification—Primary ❑Exhibit F Audited Overhead Rate ❑Exhibit M-3 Lobbying Certification ®Exhibit G Subcontracted Work ❑Exhibit M-4 Pricing Data Certification ®Exhibit G-1 Subconsultant Fee ❑App. 31.910 Supplemental Signature Page 2 THIS AGREEMENT, made and entered into this -� day ofC1' , /i7' between the Local Agency of Jefferson County, Washington, hereinafter called the"AGENCY", and the above organization hereinafter called the"CONSULTANT". Appr, ed by the Ba'' of DOT Form 140-089 EF J&l erssorI County Cern c1tv Revised 3/2008 PW_Forms/Standard Consultant Agreement with Exhibits Revised 12/30/2013 Page 1 of 40 Organization and Address: Supplemental Agreement Shearer Design LLC Number 1 3613 Phinney Ave N. #A Seattle, WA 98103 Agreement Number: 14-1021P Phone: (206) 781-7830 Project Number: 18019341 Execution Date: Completion Date: October 27,2014 December 31, 2018 Project Title: New Maximum Amount Payable: Salmon Creek Bridge Construction,West Uncas Road $102,980 Description of Work: Amend the current PS&E per the RCO technical review panel comments so as to accommodate a 24 ft natural bankfull width. Supplement also establishes a new contract completion date due to a delay attributable to the agency. The County of Jefferson, State of Washington, desires to supplement the agreement entered into with Shearer Design LLC and executed on October 27, 2014 and identified as: 14-1021P All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: II Section II, SCOPE OF WORK, shall be amended by supplementing Task No. 2 —PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E), Task No. 4—HYDRAULIC ANALYSIS, and Task No. 6—LOAD RATING. The revised scope of work under Task Numbers 2, 4, and 6 are set forth in the attached Exhibit A, and by this reference made a part of this supplement. IV Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended to establish a new contract completion date. The previous contract completion date was 12/31/16. The new contract completion date is 12/31/18. V Section V, PAYMENT, shall be amended as follows: Task No. 2, PLANS, SPECIFICATIONS, AND ESTIMATE will have a new maximum amount payable of$48,909. Task No. 4, HYDRAULIC ANALYSIS will have a new maximum amount payable of$20,847. Task No. 6, LOAD RATING will have a new maximum amount payable of$12,799. The new, total maximum amount payable for the Agreement will be $102,980, as shown below. West Uncas Road Page 1 of 3 Revised 1/2016 Supplemental Agreement No. 1 Task Original Maximum New Maximum No. Task Description Amount Payable Supplement#1 Amount Payable 1 Project Management $5,948.00 $0.00 $5,948.00 2 Plans, Specifications, & Est. $29,919.00 $18,990.00 $48,909.00 3 Environmental Services $0.00 $0.00 $0.00 4 Hydraulic Analysis $17,898.00 $2,949.00 $20,847.00 5 Geotechnical Analysis $14,477.00 $0.00 $14,477.00 6 Load Rating $7,999.00 $4,800.00 $12,799.00 TOTAL $76,241.00 $26,739.00 $102,980.00 West Uncas Road Page 2 of 3 Revised 1/2016 Supplemental Agreement No. 1 • If you concur with this supplement and agree to the changes as stated above,please sign in the appropriate spaces below and return to this office for final action. COUNTY OF JEFFERSON Consultant BOARD OF COMMISSIONERS • I q23/c", Consultant's Signature Kat 1!`i - ►!it 5 ()\ Via Date - Phil ohns t WIZ David W. Sullivan, Member AppIt )nnon1Y:4) ) 1 David Alvarez / Date Deputy Prosecuting Attorney Monte einders,P.E. ate Public Works Director/County Engineer West Uncas Road Page 3 of 3 Revised 1/2016 Supplemental Agreement No. 1 Supplemental Agreement Organization and Address: Number: 2 Shearer Design LLC 3613 Phinney Ave. N. #B Seattle, WA 98103 Agreement Number: 14-1021P Phone: (206)781-7830 Project Number: 18019341 Execution Date: October 27, 2014 Project Title: Salmon Creek Bridge, West Uncas Road Completion Date: March 31,2019 Description of Work: New Maximum Amount Payable: $120,326.00 The consultant shall provide construction support services which will include but may not be limited to review of shop drawings and calculations,providing on-site inspection of pile driving, concrete forms and steel reinforcement,bridge rail,punch list preparation, and answering questions as needed throughout construction. The Local Agency of Jefferson County desires to supplement the agreement entered into with Shearer Design LLC and executed on October 27, 2014 and identified as Agreement No. 14-1021P. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: II Section II, SCOPE OF WORK, shall be amended by creating a new task—Task No. 7, Construction Support. The items of work that will be done under Construction Support are set forth in the attached Exhibit A, and by this reference made a part of this supplement. Iv Section N,TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: This contract will expire on March 31,2019 V Section V,PAYMENT, shall be amended as follows: The Consultant Fee Determination is set forth in the attached Exhibit E-1, and by this reference made a part of this supplement. Salmon Creek Bridge Page 1 of 3 Revised 12/2017 Supplemental Agreement No. 2 The Specific Rates of Pay have been revised and are set forth in the attached Exhibit E-2,and by this reference made a part of this supplement. Task No. 7,Construction Support, will have a maximum amount payable of$17,346.00. The new,total maximum amount payable will be$120,326.00,as shown below. Task Task Description Current Supplement#2 New Maximum No. Maximum Amount Payable Amount Payable EXISTING TASKS 1 Project Management $5,948.00 $0.00 $5,948.00 2 PS&E $48,909.00 $0.00 $48,909.00 3 Environmental Services $0.00 $0.00 $0.00 4 Hydraulic Analysis $20,847.00 $0.00 $20,847.00 5 Geotechnical Analysis $14,477.00 $0.00 $14,477.00 6 Load Rating $12,799.00 $0.00 $12,799.00 NEW TASKS: 7 Construction Support $0.00 $17,346.00 $17,346.00 TOTAL $102,980.00 $17,346.00 $120,326.00 Salmon Creek Bridge Page 2 of 3 Revised 12/2017 Supplemental Agreement No. 2 If you concur with this supplement and agree to the changes as stated above,please sign in the appropriate spaces below and return to this office for final action. Shearer Design,LLC COUNTY OF JEFFERSON Consultant BOARD OF COMMISSIONERS C..--1-L i\,../' --- A......c.,„._ ,,/ /2/ oit/z 3(/y Consultant's Signature David . livan, Chair Date Kat Dean,Member ( (L,c,c,,,"1 � , Kathleen Kler,Member t Approved as t fo only: 12- C, 7 D 34g/' Philip C.Hunsucker Date Chief Civil D-• ' • -cutor j l-i. '/ Mont- t - :,� , '.E. Date Public Works Director/County Engineer Salmon Creek Bridge Page 3 of 3 Revised 12/2017 Supplemental Agreement No. 2