Loading...
HomeMy WebLinkAboutBLD1997-00049 INSTRUCTION SHEET PLOT PLAN STORMWATER CALCULATIONS INDICATE the following information. ❑ LAND DISTURBING ACTIVITY Draw entire parcel to scale. Indicate scale of plot plan: Drainfield area cleared sq.ft. One inch equals Driveway Length /6-0 ft. X Width /0 ft it 1. North arrow = Total Driveway /3----O0 sq.ft. JZ( 2. All property boundaries and dimensions Clearing and Grading for Site Development ,121/ 3. Names of adjacent streets (Well/Structures/Utilities/etc.) /' sq.ft. Zi 4. Driveway/s & parking spaces Total Land Disturbance /9C sq.ft. ,6 5. Major features such as ravines, seasonal creeks, bodies of water, etc. ❑ IMPERVIOUS SURFACE p 6. Septic tank and drainfield location, Proposed Structures (all roof area) ( sq.ft existing or proposed, and distance to Existing Structures (all roof area) 32o sq.ft. closest structure Sidewalks / sq.ft. ❑ 7. Sewer lines Concrete Patios % sq.ft. 8. Wells and/or water lines Driveway Length /15-0 ft. k] 9. Neighboring wells within 150 feet X Width /e) ft 10. Paved surfaces (patios) = Total Driveway /.�c sq.ft. 12/1 1. Structures, existing and/or proposed Total Impervious Surface 2 6 e` sq.ft. ,012. Setbacks (distances to property The Stormwater Manual sets forth the following Small boundaries, structures, banks, Parcel Minimum Requirements: and shorelines) • Construction Access Route: Construction vehicle access shall be, whenever feasible, ,1A/13. Easements for access or utilities limited to one route. Access points shall be stabilized with C�14. Arrows showing direction of slope-- quarry spalls or crushed rock to minimize the tracking of sediment onto roads. If sediment is inadvertently assume an elevation of 100 feet at one transported onto roads, they shall be cleaned thoroughly by shoveling or sweeping. Street washing should only be done lot corner and indicate the other lot after the bulk of the sediment has been removed. • Stabilization of Denuded Areas: corner elevations in relation to it All exposed and unworked soils shall be stabilized by applying sod, seeding, mulch, plastic covering or other appropriate BMPs within seven days during the period from FOR APPLICATIONS ADJOINING SHORELINES, May 1 to September 30 and within two days during the INDICATE: period from October 1 to April 30. If seeding is conducted during July and August, mulch shall be applied to a ❑ 15. Ordinary high water mark minimum depth of two inches. • Protection of Adjacent Properties: O 16. Top of bank, if over 10 feet high Adjacent properties shall be protected from sediment 0 17. Slope of bank in degrees deposition by appropriate use of vegetative buffer strips, sediment barriers or filters, dikes, seeding, mulching, or other appropriate Best Management Practices (BMPs). • Maintenance: BMPs shall be regularly inspected and maintained to ensure continued performance.