Loading...
HomeMy WebLinkAboutStampedLog Item 1 Site PlanN 47 43.160' W 122 56 586' "4�w L A 36" Steel Penstock 1 3 4 5 6 25 ft. Powerhouse floor elevation: 168 ft. 2500 KVA Transformer I VIEW A -A Nominal high -stream elevation: 158 ft . . average mid to low Flow is 2-3 below this 22 f t. — I N d Q rn Redwood deck Lid, for Walking access. 8-10 ft, 6 Inch Sten/Wing wall Turbine Tailrace Discharge Channel with a decllning base towards the stream edge, (8 a min. fall -rate of 1 -Inch to 1.0 ft.) The water discharge elevation Is above the nominal stream high level. 8 Inch High Strength concretes with footing under stem walls. Turbine Tailrace VIEW A -A PRELIMINARY DRAWING A w > w w w Ce w w Q or � o< co O '� ti N o \ CV O M 4 CL - 1=4 A U m a, a z `O o v C3 d GC J U Phi �O Q ^b p M W N Zd c4 �i 0 0 a � o a � a, +� a, U o) � i O L U t1 �n 2 pq C) ~ �/ O U aj