HomeMy WebLinkAboutStampedLog Item 14 Notice of Public HearingJEFFERSON COUNTY PERMIT CENTER
CASE NO. �/A L 9 — ( O1�-
CERTIFICATION OF MAILING
I make the following certification:
I am competent to testify and make this certification based upon personal knowledge. On this
day of �� , 2019, I deposited into the U.S. Mail with first class postage
affixed, true and correct copies of�� C-0– d C-
0 c.c.6 L�- , CRI --,t-
5
S
in the above matter, addressed to:
Adjacent Property Owners: See attached list. (Notices Only)
C.o C
rV" Agencies: See attached list. E�c.,a k,OG, Sly VA- W'
❑ Interested Parties: See attached list.
Applicant/Representative - Posting Packet: 1 set of laminating sheets with Notices,
Posting Instruction, Affidavit, and a copy of Notice.
1V'*" Newspapers (Notices Only)
,V" Official Posting Places (0)
❑ Other:
I declare under penalty of perjury under the laws of the State of Washington that the foregoing
certification is true and correct.
EXECUTED this day of
Declarant
2019 at Port Townsend, Washington.
P:\DavidWJ\Planner Info2\Noticing\FRM Certification of Mailing updated 01-2018.docx
JEFFERSON COUNTY
NOTICE OF PUBLIC HEARING
TYPE III LAND USE APPLICATION
MLA18-00105
NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County
Hearings Examiner to review and receive comments on a Type III Land Use Application.
APPLICANT:
ROCKY BROOK HYDROELECTRIC
LIMITED PARTNERSHIP
7829 CENTER BLVD SE
SNOQUALMIE, WA 98065-9096
Application Received Date: November 30, 2018
Application Complete Date: December 20, 2018
Application Notice Date: April 10, 2019
SITE ADDRESS AND PROJECT LOCATION:
Parcel Number 602282004 in Section 28, Township 26N, Range 02W, TAX 7, WM,
located at 3020 Dosewallips Road, Brinnon, WA 98325
PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES:
TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an
upgrade to an existing permitted (SH15-85 - SDP85-00015) Hydroelectric facility. The
upgrade includes new turbines in the powerhouse that will decrease the amount of water
needed to power the turbines by up to 50%, and a new outflow structure to return the
water to the creek. All work will be performed above the ordinary high water mark. A
shoreline mitigation plan has been prepared and submitted with the application to
address no net loss of ecological functions and processes. The project requires SEPA
review with public notice and 30 day comment period, and a public hearing with a
decision by the Jefferson County Hearing Examiner.
PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS:
The public hearing will be conducted on Tuesday, April 23, 2019 in the First Floor
Conference Room of the Jefferson County courthouse. The hearing will begin at or
about 2:OOPM. The application and any studies may be reviewed at the Jefferson County
Department of Community Development. All interested persons are invited to (a)
comment on the application; (b) receive notice of and participate in any hearings; and
(c) receive a copy of the decision by submitting such written comment(s)/request(s) to
the Jefferson County Department of Community Development, Development Review
Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450.
JEFFERSON COUNTY
NOTICE OF PUBLIC HEARING
TYPE III LAND USE APPLICATION
MLA18.00106
NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County Hearings Examiner to review and receive comments on a Type
III Land Use Application.
APPLICANT:
ROCKY BROOK HYDROELECTRIC
LIMITED PARTNERSHIP
7829 CENTER BLVD SE
SNOQUALMIE, WA 98065-9096
Application Received Date: November 30, 2018
Application Complete Date: December 20, 2018
Application Notice Date: April 10, 2019
SITE ADDRESS AND PROJECT LOCATION:
Parcel Number 602282004 in Section 28, Township 26N, Range 02W, TAX 7, WM, located at 3020 Dosewallips Road, Brinnon, WA 98325
PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES:
TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an existing permitted (SH15-85 - SDP85-00015)
Hydroelectric facility. The upgrade includes new turbines in the powerhouse that will decrease the amount of water needed to power the turbines by
up to 50%, and a new outflow structure to return the water to the creek. All work will be performed above the ordinary high water mark. A shoreline
mitigation plan has been prepared and submitted with the application to address no net loss of ecological functions and processes. The project requires
SEPA review with public notice and 30 day comment period, and a public hearing with a decision by the Jefferson County Hearing Examiner.
PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS:
The public hearing will be conducted on Tuesday, April 23, 2019 in the First Floor Conference Room of the Jefferson County courthouse The hearing
will begin at or about 2:OOPM. The application and any studies may be reviewed at the Jefferson County Department of Community Development. All
interested persons are invited to (a) comment on the application; (b) receive notice of and participate in any hearings; and (c) receive a copy of the
decision by submitting such written comment(s)/request(s) to the Jefferson County Department of Community Development, Development Review
Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450.
SEPA INFORMATION AND DETERMINATION:
On April 4. 2019 the SEPA Responsible Official issued a Final SEPA Determination of Non -Significance (DNS). If the threshold determination is a
Determination of Non -Significance (DNS) or a Mitigated Determination of Non -Significance (MDNS), parties of record may appeal the decision to the
Hearing Examiner within 14 days of the final Notice of Decision, for consideration by the Jefferson County Hearings Examiner at the schedule public
hearing noted above.
Project Planner: David Wayne Johnson, 360-379-4450
USA OLYMPIC NAT'L FOREST DANIEL BAKER ROCKY BROOK HYDROELECTRIC
DEPARTMENT OF AGRICULTURE 2405 DOSEWALLIPS RD LIMITED PARTNERSHIP
1835 BLACK LAKE BLVD SW BRINNON, WA 98320 7829 CENTER BLVD SE
OLYMPIA, WA 98512-5607 SNOQUALMIE, WA 98065-9096
DENNIS KUKLOK
PO BOX 69
BRINNON, WA 98320-0069
DENNI,.. KLOK
PO,@dX 69
f INNON, WA 98320-0069
F
MATTHEW MORS
R KLECKNER/M AUSTIN TRSTE
R & M KLECKNER TRUST
SEATTLE, WA 98136-2434
JEANINE ROSSELL
DOUGLAS THRESHER
5502 S FLETCHER ST
SEATTLE, WA 98118-5533
DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street I Port Townsend, WA 98368
360-379-4450 1 email: dcd@co.jefferson.wa.us
www.co.jefferson.wa.us/commdevelopment
POSTING INSTRUCTIONS
Please post the attached notice on a 2 -foot by 3 -foot board provided by this department in a conspicuous location
visible to vehicle traffic and pedestrians on or reasonably near the proposed
development by April 10, 2019.
The clear adhesive paper can be put over the notice after you mount it to protect it from the elements
Additional notice boards may be required where the site does not abut a public road, for a large site that abuts more than
one (1) public road, or the Administrator determines that additional notice boards are necessary to provide adequate
public notice.
Notice boards shall be maintained in good and legible condition by the applicant during the notice period, be in place at
least fifteen (15) calendar days prior to the date of the hearing, and be removed within fifteen (15) calendar days after the
end of the notice period.
Complete the affidavit, have it notarized, and return it to this office within three (3) days of posting. If the affidavit is not
filed as required, any scheduled hearing or date by which the public may comment on the application will be postponed in
order to allow compliance with this notice requirement.
If you have any questions, please contact this office at (360) 379-4450.
MLA number: MLA18-00105
Proponent(s): ROCKY BROOK HYDROELECTRIC
JEFFERSON COUNTY
NOTICE OF PUBLIC HEARING
TYPE III LAND USE APPLICATION
MLA18-00105
NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County Hearings Examiner to review and receive
comments on a Type III Land Use Application.
APPLICANT:
ROCKY BROOK HYDROELECTRIC
LIMITED PARTNERSHIP
7829 CENTER BLVD SE
SNOQUALMIE WA 98065-9096
Application Received Date: November 30, 2018
Application Complete Date: December 20, 2018
Application Notice Date: April 10, 2019
SITE ADDRESS AND PROJECT LOCATION: ....................
Parcel Number 602282004 in Section 28, Township 26N, Range 02W, TAX 7, WM, located at 3020 Dosewallips Road,
Brinnon, WA 98325
PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES:
TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an existing permitted
(SH15-85 - SDP85-00015) Hydroelectric facility. The upgrade includes new turbines in the powerhouse that will decrease
the amount of water needed to power the turbines by up to 50%, and a new outflow structure to return the water to the
creek. All work will be performed above the ordinary high water mark. A shoreline mitigation plan has been prepared and
submitted with the application to address no net loss of ecological functions and processes. The project requires SEPA
review with public notice and 30 day comment period, and a public hearing with a decision by the Jefferson County
Hearing Examiner.
PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS:
The public hearing will be conducted on Tuesday, April 23, 2019 in the First Floor Conference Room of the Jefferson County
courthouse. The hearing will begin at or about 2:0013M.
The application and any studies may be reviewed at the Jefferson County Department of Community Development. All interested
persons are invited to (a) comment on the application; (b) receive notice of and participate in any hearings; and (c) receive a copy of
the decision by submitting such written comment(s)/request(s) to the Jefferson County Department of Community Development,
Development Review Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450.
SEPA INFORMATION AND DETERMINATION:
If the threshold determination is a Determination of Non -Significance (DNS) or a Mitigated Determination of Non -Significance
(MDNS), parties of record may appeal the decision to the Hearing Examiner within 14 days of the final Notice of Decision. A
Determination of Significance (DS) may not be appealed to the Hearing Examiner.
Project Planner: David Wayne Johnson, 360-379-4450
JEFFERSON COUNTY
NOTICE OF PUBLIC HEARING
TYPE III LAND USE APPLICATION
MLA18-00105
NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County Hearings Examiner on a Type III
Land Use Application.
APPLICANT:
ROCKY BROOK HYDROELECTRIC
LIMITED PARTNERSHIP
7829 CENTER BLVD SE
SNOQUALMIE WA 98065-9096
Application Received Date: November 30, 2018
Application Complete Date: December 20, 2018
Application Notice Date: April 10, 2019
SITE ADDRESS AND PROJECT LOCATION:
Parcel Number 602282004 in Section 28, Township 26N, Range 02W, TAX 7, WM, located at 3020
Dosewallips Road, Brinnon, WA 98325
PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES:
TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an
existing permitted (SH15-85 - SDP85-00015) Hydroelectric facility. The upgrade includes new
turbines in the powerhouse that will decrease the amount of water needed to power the turbines by
up to 50%, and a new outflow structure to return the water to the creek. All work will be performed
above the ordinary high water mark. A shoreline mitigation plan has been prepared and submitted
with the application to address no net loss of ecological functions and processes. The project
requires SEPA review with public notice and 30 day comment period, and a public hearing with a
decision by the Jefferson County Hearing Examiner.
PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS:
The public hearing will be conducted on Tuesday, April 23, 2019 in the First Floor Conference
Room of the Jefferson County courthouse. The hearing will begin at or about 2:OOPM.
The application and any studies may be reviewed at the Jefferson County Department of
Community Development. All interested persons are invited to (a) comment on the application; (b)
receive notice of and participate in any hearings; and (c) receive a copy of the decision by
submitting such written comment(s)/request(s) to the Jefferson County Department of Community
Development, Development Review Division, 621 Sheridan Street, Port Townsend, WA 98368,
(360) 379-4450.
SEPA INFORMATION AND DETERMINATION:
If the threshold determination is a Determination of Non -Significance (DNS) or a Mitigated Determination of Non -Significance
(MDNS), parties of record may appeal the decision to the Hearing Examiner within 14 days of the final Notice of Decision. A
Determination of Significance (DS) may not be appealed to the Hearing Examiner.
David W. Johnson
From: David W. Johnson
Sent: Thursday, April 04, 2019 10:27 AM
To: ECY RE SEPA REGISTER
Cc: David W. Johnson
Subject: RE: 201900131 attach RE: MLA18-00105 Notice and SEPA Checklist
Attachments: Final SEPA DNS.pdf, mla18-00105nph_APO.pdf
Final SEPA DNS and Notice of Public Hearing.
Thanks!
From: ECY RE SEPA REGISTER <separegister@ecy.wa.gov>
Sent: Thursday, January 10, 2019 8:31 AM
To: David W. Johnson <djohnson@co.jefferson.wa.us>
Subject: RE: 201900131 attach RE: MLA18-00105 Notice and SEPA Checklist
No worries! This was assigned Statewide SEPA Register #201900131.
Morgan Dorner
SEPA Coordinator I Southwest Regional Office
P: 360-407-6313 1 F: 360-407-6305
DUVAi�IAPQ1'df
ECOLOGY
Stole of "Vo-%11;11V.kd-
From: David W. Johnson [mailto:diohnson@co.jefferson.wa.usj
Sent: Wednesday, January 9, 2019 4:14 PM
To: ECY RE SEPA REGISTER <se are ister ec .wa. ov>
Cc: David W. Johnson <diohnson@co.iefferson.wa.us>
Subject: 201900131 attach RE: MLA18-00105 Notice and SEPA Checklist
Sure. Sorry about that.
From: ECY RE SEPA REGISTER <separegister@ecy.wa.gov>
Sent: Wednesday, January 09, 2019 4:11 PM
To: David W. Johnson <diohnson@co.lefferson.wa.us>
Subject: RE: MLA18-00105 Notice and SEPA Checklist
Importance: High
Hi David,
The SEPA Checklist document is out of order, could you please submit a corrected checklist?
Thank you,
1
David W. Johnson
From:
David W. Johnson
Sent:
Thursday, April 04, 2019 10:54 AM
To:
Dell Keehn
Cc:
David W. Johnson
Subject:
RE: Rocky Brook Hydro Pubilc Hearing
Attachments:
Final MLA18-00105 SDP Staff Report.pdf, Final SEPA DNS.pdf;
mla18-00105nph_APO.pdf; Posting Instructions.pdf
Attached is the Staff Report, SEPA DNS and Notice of Public Hearing. The Hearing Examiner will ask you if you've read
the Staff Report and agree to the conditions of approval.
I've ask Wayne to post the notice on-site since I will be out of town next week. Make sure he signs, notarizes and returns
the Affidavit of Posting (also attached) to me for the record.
Thanks!
From: Dell Keehn <dek12@isomedia.com>
Sent: Monday, March 11, 2019 9:54 AM
To: David W. Johnson <djohnson@co.jefferson.wa.us>; herrwayne@yahoo.com; 'Laura Westervelt' <lauraw@eco-
land.com>
Subject: RE: Rocky Brook Hydro Pubilc Hearing
Good Morning David,
That will work for me. When do you think you will finish the report and, given your schedule, when do you think the
county will post the notice?
Thanks,
Dell
From: David W. Johnson <Johnson coJefferson.wa.us>
Sent: Monday, March 11, 2019 9:27 AM
To: Dell Keehn <dek12@isomedia.cam>; herrwa ne ahoo.com; 'Laura Westervelt' <]auraw eco-land.com>
Cc: David W. Johnson <d1ohnson co.iefferson.wa.us>
Subject: Rocky Brook Hydro Pubilc Hearing
Dell,
Sorry, but I'm not able to finish the draft staff report in time for notice of the public hearing. Therefore we will have to
re -schedule. The next available date is April 23rd. Does that date work for you?
Thanks!
David Wayne Johnson - LEED AP - Neighborhood Development
Associate Planner - Port Ludlow Lead Planner
Department of Community Development
Jefferson County
David W. Johnson
From:
Wayne Herr <herrwayne@yahoo.com>
Sent:
Monday, April 08, 2019 3:16 PM
To:
David W. Johnson; Dell Keehn
Cc:
David W. Johnson
Subject:
RE: Rocky Brook Hydro - County Permit
Good afternoon,
I went and got the sign today and posted it. I put it right where the last one was. I also got the letter filled out
and got it noterized. I will bring it to the office tomorrow afternoon.
Wayne
AFFIDAVIT OF POSTING PUBLIC NOTICE
JEFFERSON COUNTY UNIFIED DEVELOPMENT CODE
ORDINANCE #03-0702-01
State of Washington)
County of Jefferson)
I, (A, -e �':' . being duly sworn of oath say that I have posted one (1) public notice poster on or
near the sitb identified in the following development description:
PROPOSAL: TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an existing permitted
(SH15-85 - SDP85-00015) Hydroelectric facility. The upgrade includes new turbines in the powerhouse that will decrease the
amount of water needed to power the turbines by up to 50%, and a new outflow structure to return the water to the creek. All work
will be performed above the ordinary high water mark. A shoreline mitigation plan has been prepared and submitted with the
application to address no net loss of ecological functions and processes. The project requires SEPA review with public notice and
30 day comment period, and a public hearing with a decision by the Jefferson County Hearing Examiner.
The notice was posted in full compliance with UNIFIED DEVELOPMENT CODE on:
the=day of A : J , 2019.
(Signature of person posting notice)
Subscribed and sworn to before me on this_yday of —2019.
Acknowledgement:
c
Notary PubliOn_dvd for the State of Washington,
residing in -
I -I v ,I J_12)_, Washington.
My commission expires: -7- It, 2--0 20
MLA Number: MLA18-00105
Proponent(s): ROCKY BROOK HYDROELECTRIC
\\tidemark\data\forms\F_MLT_HearExam_APO_U. rpt 4/2/2019
Notary Public
State of Washington
JERI JACOBSON
MY COMMISSION EXPIRES
JULY 16, 2020
(VOTARY STAMP
David W. Johnson
From:
Wayne Herr <herrwayne@yahoo.com>
Sent:
Monday, April 08, 2019 3:16 PM
To:
David W. Johnson; Dell Keehn
Cc:
David W. Johnson
Subject:
RE: Rocky Brook Hydro - County Permit
Good afternoon,
I went and got the sign today and posted it. I put it right where the last one was. I also got the letter filled out
and got it noterized. I will bring it to the office tomorrow afternoon.
Wayne