Loading...
HomeMy WebLinkAboutStampedLog Item 14 Notice of Public HearingJEFFERSON COUNTY PERMIT CENTER CASE NO. �/A L 9 — ( O1�- CERTIFICATION OF MAILING I make the following certification: I am competent to testify and make this certification based upon personal knowledge. On this day of �� , 2019, I deposited into the U.S. Mail with first class postage affixed, true and correct copies of�� C-0– d C- 0 c.c.6 L�- , CRI --,t- 5 S in the above matter, addressed to: Adjacent Property Owners: See attached list. (Notices Only) C.o C rV" Agencies: See attached list. E�c.,a k,OG, Sly VA- W' ❑ Interested Parties: See attached list. Applicant/Representative - Posting Packet: 1 set of laminating sheets with Notices, Posting Instruction, Affidavit, and a copy of Notice. 1V'*" Newspapers (Notices Only) ,V" Official Posting Places (0) ❑ Other: I declare under penalty of perjury under the laws of the State of Washington that the foregoing certification is true and correct. EXECUTED this day of Declarant 2019 at Port Townsend, Washington. P:\DavidWJ\Planner Info2\Noticing\FRM Certification of Mailing updated 01-2018.docx JEFFERSON COUNTY NOTICE OF PUBLIC HEARING TYPE III LAND USE APPLICATION MLA18-00105 NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County Hearings Examiner to review and receive comments on a Type III Land Use Application. APPLICANT: ROCKY BROOK HYDROELECTRIC LIMITED PARTNERSHIP 7829 CENTER BLVD SE SNOQUALMIE, WA 98065-9096 Application Received Date: November 30, 2018 Application Complete Date: December 20, 2018 Application Notice Date: April 10, 2019 SITE ADDRESS AND PROJECT LOCATION: Parcel Number 602282004 in Section 28, Township 26N, Range 02W, TAX 7, WM, located at 3020 Dosewallips Road, Brinnon, WA 98325 PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES: TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an existing permitted (SH15-85 - SDP85-00015) Hydroelectric facility. The upgrade includes new turbines in the powerhouse that will decrease the amount of water needed to power the turbines by up to 50%, and a new outflow structure to return the water to the creek. All work will be performed above the ordinary high water mark. A shoreline mitigation plan has been prepared and submitted with the application to address no net loss of ecological functions and processes. The project requires SEPA review with public notice and 30 day comment period, and a public hearing with a decision by the Jefferson County Hearing Examiner. PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS: The public hearing will be conducted on Tuesday, April 23, 2019 in the First Floor Conference Room of the Jefferson County courthouse. The hearing will begin at or about 2:OOPM. The application and any studies may be reviewed at the Jefferson County Department of Community Development. All interested persons are invited to (a) comment on the application; (b) receive notice of and participate in any hearings; and (c) receive a copy of the decision by submitting such written comment(s)/request(s) to the Jefferson County Department of Community Development, Development Review Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450. JEFFERSON COUNTY NOTICE OF PUBLIC HEARING TYPE III LAND USE APPLICATION MLA18.00106 NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County Hearings Examiner to review and receive comments on a Type III Land Use Application. APPLICANT: ROCKY BROOK HYDROELECTRIC LIMITED PARTNERSHIP 7829 CENTER BLVD SE SNOQUALMIE, WA 98065-9096 Application Received Date: November 30, 2018 Application Complete Date: December 20, 2018 Application Notice Date: April 10, 2019 SITE ADDRESS AND PROJECT LOCATION: Parcel Number 602282004 in Section 28, Township 26N, Range 02W, TAX 7, WM, located at 3020 Dosewallips Road, Brinnon, WA 98325 PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES: TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an existing permitted (SH15-85 - SDP85-00015) Hydroelectric facility. The upgrade includes new turbines in the powerhouse that will decrease the amount of water needed to power the turbines by up to 50%, and a new outflow structure to return the water to the creek. All work will be performed above the ordinary high water mark. A shoreline mitigation plan has been prepared and submitted with the application to address no net loss of ecological functions and processes. The project requires SEPA review with public notice and 30 day comment period, and a public hearing with a decision by the Jefferson County Hearing Examiner. PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS: The public hearing will be conducted on Tuesday, April 23, 2019 in the First Floor Conference Room of the Jefferson County courthouse The hearing will begin at or about 2:OOPM. The application and any studies may be reviewed at the Jefferson County Department of Community Development. All interested persons are invited to (a) comment on the application; (b) receive notice of and participate in any hearings; and (c) receive a copy of the decision by submitting such written comment(s)/request(s) to the Jefferson County Department of Community Development, Development Review Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450. SEPA INFORMATION AND DETERMINATION: On April 4. 2019 the SEPA Responsible Official issued a Final SEPA Determination of Non -Significance (DNS). If the threshold determination is a Determination of Non -Significance (DNS) or a Mitigated Determination of Non -Significance (MDNS), parties of record may appeal the decision to the Hearing Examiner within 14 days of the final Notice of Decision, for consideration by the Jefferson County Hearings Examiner at the schedule public hearing noted above. Project Planner: David Wayne Johnson, 360-379-4450 USA OLYMPIC NAT'L FOREST DANIEL BAKER ROCKY BROOK HYDROELECTRIC DEPARTMENT OF AGRICULTURE 2405 DOSEWALLIPS RD LIMITED PARTNERSHIP 1835 BLACK LAKE BLVD SW BRINNON, WA 98320 7829 CENTER BLVD SE OLYMPIA, WA 98512-5607 SNOQUALMIE, WA 98065-9096 DENNIS KUKLOK PO BOX 69 BRINNON, WA 98320-0069 DENNI,.. KLOK PO,@dX 69 f INNON, WA 98320-0069 F MATTHEW MORS R KLECKNER/M AUSTIN TRSTE R & M KLECKNER TRUST SEATTLE, WA 98136-2434 JEANINE ROSSELL DOUGLAS THRESHER 5502 S FLETCHER ST SEATTLE, WA 98118-5533 DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street I Port Townsend, WA 98368 360-379-4450 1 email: dcd@co.jefferson.wa.us www.co.jefferson.wa.us/commdevelopment POSTING INSTRUCTIONS Please post the attached notice on a 2 -foot by 3 -foot board provided by this department in a conspicuous location visible to vehicle traffic and pedestrians on or reasonably near the proposed development by April 10, 2019. The clear adhesive paper can be put over the notice after you mount it to protect it from the elements Additional notice boards may be required where the site does not abut a public road, for a large site that abuts more than one (1) public road, or the Administrator determines that additional notice boards are necessary to provide adequate public notice. Notice boards shall be maintained in good and legible condition by the applicant during the notice period, be in place at least fifteen (15) calendar days prior to the date of the hearing, and be removed within fifteen (15) calendar days after the end of the notice period. Complete the affidavit, have it notarized, and return it to this office within three (3) days of posting. If the affidavit is not filed as required, any scheduled hearing or date by which the public may comment on the application will be postponed in order to allow compliance with this notice requirement. If you have any questions, please contact this office at (360) 379-4450. MLA number: MLA18-00105 Proponent(s): ROCKY BROOK HYDROELECTRIC JEFFERSON COUNTY NOTICE OF PUBLIC HEARING TYPE III LAND USE APPLICATION MLA18-00105 NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County Hearings Examiner to review and receive comments on a Type III Land Use Application. APPLICANT: ROCKY BROOK HYDROELECTRIC LIMITED PARTNERSHIP 7829 CENTER BLVD SE SNOQUALMIE WA 98065-9096 Application Received Date: November 30, 2018 Application Complete Date: December 20, 2018 Application Notice Date: April 10, 2019 SITE ADDRESS AND PROJECT LOCATION: .................... Parcel Number 602282004 in Section 28, Township 26N, Range 02W, TAX 7, WM, located at 3020 Dosewallips Road, Brinnon, WA 98325 PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES: TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an existing permitted (SH15-85 - SDP85-00015) Hydroelectric facility. The upgrade includes new turbines in the powerhouse that will decrease the amount of water needed to power the turbines by up to 50%, and a new outflow structure to return the water to the creek. All work will be performed above the ordinary high water mark. A shoreline mitigation plan has been prepared and submitted with the application to address no net loss of ecological functions and processes. The project requires SEPA review with public notice and 30 day comment period, and a public hearing with a decision by the Jefferson County Hearing Examiner. PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS: The public hearing will be conducted on Tuesday, April 23, 2019 in the First Floor Conference Room of the Jefferson County courthouse. The hearing will begin at or about 2:0013M. The application and any studies may be reviewed at the Jefferson County Department of Community Development. All interested persons are invited to (a) comment on the application; (b) receive notice of and participate in any hearings; and (c) receive a copy of the decision by submitting such written comment(s)/request(s) to the Jefferson County Department of Community Development, Development Review Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450. SEPA INFORMATION AND DETERMINATION: If the threshold determination is a Determination of Non -Significance (DNS) or a Mitigated Determination of Non -Significance (MDNS), parties of record may appeal the decision to the Hearing Examiner within 14 days of the final Notice of Decision. A Determination of Significance (DS) may not be appealed to the Hearing Examiner. Project Planner: David Wayne Johnson, 360-379-4450 JEFFERSON COUNTY NOTICE OF PUBLIC HEARING TYPE III LAND USE APPLICATION MLA18-00105 NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County Hearings Examiner on a Type III Land Use Application. APPLICANT: ROCKY BROOK HYDROELECTRIC LIMITED PARTNERSHIP 7829 CENTER BLVD SE SNOQUALMIE WA 98065-9096 Application Received Date: November 30, 2018 Application Complete Date: December 20, 2018 Application Notice Date: April 10, 2019 SITE ADDRESS AND PROJECT LOCATION: Parcel Number 602282004 in Section 28, Township 26N, Range 02W, TAX 7, WM, located at 3020 Dosewallips Road, Brinnon, WA 98325 PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES: TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an existing permitted (SH15-85 - SDP85-00015) Hydroelectric facility. The upgrade includes new turbines in the powerhouse that will decrease the amount of water needed to power the turbines by up to 50%, and a new outflow structure to return the water to the creek. All work will be performed above the ordinary high water mark. A shoreline mitigation plan has been prepared and submitted with the application to address no net loss of ecological functions and processes. The project requires SEPA review with public notice and 30 day comment period, and a public hearing with a decision by the Jefferson County Hearing Examiner. PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS: The public hearing will be conducted on Tuesday, April 23, 2019 in the First Floor Conference Room of the Jefferson County courthouse. The hearing will begin at or about 2:OOPM. The application and any studies may be reviewed at the Jefferson County Department of Community Development. All interested persons are invited to (a) comment on the application; (b) receive notice of and participate in any hearings; and (c) receive a copy of the decision by submitting such written comment(s)/request(s) to the Jefferson County Department of Community Development, Development Review Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450. SEPA INFORMATION AND DETERMINATION: If the threshold determination is a Determination of Non -Significance (DNS) or a Mitigated Determination of Non -Significance (MDNS), parties of record may appeal the decision to the Hearing Examiner within 14 days of the final Notice of Decision. A Determination of Significance (DS) may not be appealed to the Hearing Examiner. David W. Johnson From: David W. Johnson Sent: Thursday, April 04, 2019 10:27 AM To: ECY RE SEPA REGISTER Cc: David W. Johnson Subject: RE: 201900131 attach RE: MLA18-00105 Notice and SEPA Checklist Attachments: Final SEPA DNS.pdf, mla18-00105nph_APO.pdf Final SEPA DNS and Notice of Public Hearing. Thanks! From: ECY RE SEPA REGISTER <separegister@ecy.wa.gov> Sent: Thursday, January 10, 2019 8:31 AM To: David W. Johnson <djohnson@co.jefferson.wa.us> Subject: RE: 201900131 attach RE: MLA18-00105 Notice and SEPA Checklist No worries! This was assigned Statewide SEPA Register #201900131. Morgan Dorner SEPA Coordinator I Southwest Regional Office P: 360-407-6313 1 F: 360-407-6305 DUVAi�IAPQ1'df ECOLOGY Stole of "Vo-%11;11V.kd- From: David W. Johnson [mailto:diohnson@co.jefferson.wa.usj Sent: Wednesday, January 9, 2019 4:14 PM To: ECY RE SEPA REGISTER <se are ister ec .wa. ov> Cc: David W. Johnson <diohnson@co.iefferson.wa.us> Subject: 201900131 attach RE: MLA18-00105 Notice and SEPA Checklist Sure. Sorry about that. From: ECY RE SEPA REGISTER <separegister@ecy.wa.gov> Sent: Wednesday, January 09, 2019 4:11 PM To: David W. Johnson <diohnson@co.lefferson.wa.us> Subject: RE: MLA18-00105 Notice and SEPA Checklist Importance: High Hi David, The SEPA Checklist document is out of order, could you please submit a corrected checklist? Thank you, 1 David W. Johnson From: David W. Johnson Sent: Thursday, April 04, 2019 10:54 AM To: Dell Keehn Cc: David W. Johnson Subject: RE: Rocky Brook Hydro Pubilc Hearing Attachments: Final MLA18-00105 SDP Staff Report.pdf, Final SEPA DNS.pdf; mla18-00105nph_APO.pdf; Posting Instructions.pdf Attached is the Staff Report, SEPA DNS and Notice of Public Hearing. The Hearing Examiner will ask you if you've read the Staff Report and agree to the conditions of approval. I've ask Wayne to post the notice on-site since I will be out of town next week. Make sure he signs, notarizes and returns the Affidavit of Posting (also attached) to me for the record. Thanks! From: Dell Keehn <dek12@isomedia.com> Sent: Monday, March 11, 2019 9:54 AM To: David W. Johnson <djohnson@co.jefferson.wa.us>; herrwayne@yahoo.com; 'Laura Westervelt' <lauraw@eco- land.com> Subject: RE: Rocky Brook Hydro Pubilc Hearing Good Morning David, That will work for me. When do you think you will finish the report and, given your schedule, when do you think the county will post the notice? Thanks, Dell From: David W. Johnson <Johnson coJefferson.wa.us> Sent: Monday, March 11, 2019 9:27 AM To: Dell Keehn <dek12@isomedia.cam>; herrwa ne ahoo.com; 'Laura Westervelt' <]auraw eco-land.com> Cc: David W. Johnson <d1ohnson co.iefferson.wa.us> Subject: Rocky Brook Hydro Pubilc Hearing Dell, Sorry, but I'm not able to finish the draft staff report in time for notice of the public hearing. Therefore we will have to re -schedule. The next available date is April 23rd. Does that date work for you? Thanks! David Wayne Johnson - LEED AP - Neighborhood Development Associate Planner - Port Ludlow Lead Planner Department of Community Development Jefferson County David W. Johnson From: Wayne Herr <herrwayne@yahoo.com> Sent: Monday, April 08, 2019 3:16 PM To: David W. Johnson; Dell Keehn Cc: David W. Johnson Subject: RE: Rocky Brook Hydro - County Permit Good afternoon, I went and got the sign today and posted it. I put it right where the last one was. I also got the letter filled out and got it noterized. I will bring it to the office tomorrow afternoon. Wayne AFFIDAVIT OF POSTING PUBLIC NOTICE JEFFERSON COUNTY UNIFIED DEVELOPMENT CODE ORDINANCE #03-0702-01 State of Washington) County of Jefferson) I, (A, -e �':' . being duly sworn of oath say that I have posted one (1) public notice poster on or near the sitb identified in the following development description: PROPOSAL: TYPE III SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT - The project is an upgrade to an existing permitted (SH15-85 - SDP85-00015) Hydroelectric facility. The upgrade includes new turbines in the powerhouse that will decrease the amount of water needed to power the turbines by up to 50%, and a new outflow structure to return the water to the creek. All work will be performed above the ordinary high water mark. A shoreline mitigation plan has been prepared and submitted with the application to address no net loss of ecological functions and processes. The project requires SEPA review with public notice and 30 day comment period, and a public hearing with a decision by the Jefferson County Hearing Examiner. The notice was posted in full compliance with UNIFIED DEVELOPMENT CODE on: the=day of A : J , 2019. (Signature of person posting notice) Subscribed and sworn to before me on this_yday of —2019. Acknowledgement: c Notary PubliOn_dvd for the State of Washington, residing in - I -I v ,I J_12)_, Washington. My commission expires: -7- It, 2--0 20 MLA Number: MLA18-00105 Proponent(s): ROCKY BROOK HYDROELECTRIC \\tidemark\data\forms\F_MLT_HearExam_APO_U. rpt 4/2/2019 Notary Public State of Washington JERI JACOBSON MY COMMISSION EXPIRES JULY 16, 2020 (VOTARY STAMP David W. Johnson From: Wayne Herr <herrwayne@yahoo.com> Sent: Monday, April 08, 2019 3:16 PM To: David W. Johnson; Dell Keehn Cc: David W. Johnson Subject: RE: Rocky Brook Hydro - County Permit Good afternoon, I went and got the sign today and posted it. I put it right where the last one was. I also got the letter filled out and got it noterized. I will bring it to the office tomorrow afternoon. Wayne