Loading...
HomeMy WebLinkAboutGeotech Waiver 802342008DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 1 Fax: 360.379.4451 Web: www.co.iefFerson.wa.us/communitvdevelooment�■h-, Scan the QR E-mail: [�cd@co.iefferson.wa.us code to access rothe digital file. SUPPLEMENTAL APPLICATION WAIVER FROM SPECIAL REPORTS — GEOTECHNICAL REPORT FOR GEOLOGICALLY HAZARDOUS AREAS MLA# PROJECT/APPLICANT NAME: —.r+t f�rn�try 1, /(10/ma 60M17 J 1_A V"r1?" t L. Z Pic- owner of parcel 80z,3112 Uv S Property Owner's Name Parcel number located at Xxxx ,C�>�1�p Q&" -Ice to- ccJ„ Property Address hereby request a waiver from the requirement for a geotechnical report unde 1 9 �s co with the critical area review and protection standards under Jefferson Count (`JGC,' 18.2j.1�6� r I application / �� G�%�?� (if applicable). Jefferson County Code 18.22.370 Waivers - JUSTIFICATION The Unified Development Code Administrator may waive the requirement for a special report when an applicant demonstrates the following: (1) The proposal involved will not affect the critical area in a manner contrary to the goals, purposes and objectives of this code. Specifically, address the following elements of the proposal: (1) a description of the geologic setting; (2) topography; (3) soils; (4) hydrology (explain where/how rainwater flows on the property); and (5) evaluation of the proposal impacts upon known geologic hazards. 1) -0 cc /Y 00 r7 4 X"'le- /S of r/• /- 4,,U , I&C'L f4.G •e /- 4( 4- 6•csc elf A. .70-0 ,�� �C�lJt,t A"//. 2 SCo cs krc me Le��fc, i4v l toc ost r, * . .3) J -,/Is 4—c 'J 9. S � G'ri �[ ifC •e ✓a GC -r-%A eC Z-" 4149.5-7. iv a�,ed S� �'Co in r� r. arc ✓c w�GC .tie /nc.0 <sv i.e in "k,_- r,L/ i r nnc cx .s c.. t ori nfi:�• .srx yc rnrr+ritraP IYL Gpwtr heti rzf�i%+� (2) The minimum protection standards required in 18.22.170(2)(3)(4) are addressed in this proposal. Specifically, address the following protection standards: (1) drainage and erosion control; (2) clearing and grading; and (3) vegetation retention. L5,/X M •L"/ c' •mfr;rwts ;7 .d i // do Gtr a r1 /v c•-" sera W%l/ bt d IYYC'.tr v c s Ar.0/e f lice �S y� nc� �5'CfJfi c .s�j.r/(C rn Lt,rt� is w.t ro ss cc yy�G •e�c iz .4 �[.r�r cc.� 2 it Gras q�nrs � :l�.ci/J,r v 3]��'rt�S /✓i%/ 6r rYypL.e.4 fri( liyr r.L .�� llw/ i s <nsf� Gftif �O'h^C R.,, y •%74y� � c.-,,.,,.r.cn.Le.0 Attach additional pages if necessary. Please also attach a site plan depicting the proposal including stormwater runoff control BMP's to ensure stormwater stays on site. Refer to DCD stormwater forms and information. Last update 12/28/2018 Fees are required in accordance with either of the following_ 1. Any additional time required to review this request in conjunction with an existing permit application_ will be billed $94 per review hour and invoiced separately. 2. A stand-alone review of this request without a concurrent permit application requires a minimum of 3 hours staff time. Required fees: $282 base, $24 scan, and 5% technology fee is due at the time of this application. If additional staff time is required to process the application, it will be billed at an hourly rate of $94. A site visit may be required to inspect the property. Waiver approval is valid for one year and only grants relief from specific requirements within Chapter 18.22 Critical Areas of Jefferson County Code. If the proposal substantially changes, the proponent must submit a new waiver request and fee for DCD review. Upon approval from the Unified Development Code Administrator the property owners will be required to execute an Indemnity and Release & Waiver with Jefferson County. Signed Date Signed Property Owner(s) Date