Loading...
HomeMy WebLinkAboutBLD2004-00148A FINAL AS BUILT' DATE -zr- SURVEY POINT ELEVATIONS 1. 103.7 TOE BANK) 2 103.6 TOE BANK 3. 102-8 TOE BANK 4. 99.6 TOE BANK 5. 92.8 TOP BANK 6. 85.2 TOE BANK 7, 92.0 TOP BANK 8. 97.9 10. 93.4 (TOP BANK) 11. 82.1 (TOE BANK) POTENTIAL FUTURE BEAUTY SHOP IN SINGLE -WIDE HOUSE TRAILER- PVC BALL VALVE ON EACH LINE Q �t 4 a I_- . 3e � o 2 J Q 0 � l PVC BALL VALVE ON EACH LINE - ENTRANCE FMAINTENANCE ACTIVITY JBUILDING \ I EXISTING 750 GAL CAPACITY SEPTIC TANK / SEE NOTE 1 PARKING / 63' / 2 /e l I I ! ! 10 20' l ! 28'- 9" IIII oa / �o PUMP STATION I l I8 (SEE DETAIL) / IN-UNE FILTER / WELL ( MONITORING 3 PLACES) T T t ) SEE DETAIL. I IIi \I l l �lI /•I I l � l I I I I SEE NOTE 2. Q 0 5 3 � SEE NOTE 3 z- 7-�- - v�i PARKING SEE NOTE 1 I 3 B6 PERMIT # BID 04-0148 JEFFERSON COUNTY DCD NOTES: 1. CONTRACTOR WILL LOCATE, CUT, AND PLUG EXISTING SEWER LINE AS SHOWN. CONTRACTOR TOR ELL INSTALL NEW SEWER LINE CONNECTIONS AS SHOWN. TY PREFABRICAE JAN 29 199 2 SEPCONTICACTOR WILL INSTALL THREE TANNKS AS SHOWN. BAFFLES IN2FIRST00 ATWO TANKIS (TO EAST) WILLD �(yUi ( BE REMOVED. T. HEALTH G 3. CONTRACTOR WILL INSTALL 135't NEW 4" DIA. PVC SEWER TIGHTLINE FROM SEPTIC TANKS TO EXISTING 4" DIA. SEWER PIPELINE AS SHOWN. NEW PIPELINE WILL BE TIED INTO EXISTING PIPELINE WTH A 4" DIA. PVC LONG TURN TEE WYE. ACAD DIRECTORY PATH & DRAWING NAME (JFB)C:\ NACOWEST\DISCOVER\300\304\C-1.DWG GRAPHIC SCALE 0 100, 150' 200' FEET DATE PRINTED APRIL 30,1992 LICENSE STAMP SCALE DATE SURVEYED BY DESIGNED BY DRAWN BY _ wola f �s PRO:" RTY LINE-- CLEANOUT PUMP STATION �z (SEE DE ,11 555't DIA. PVC ® 2L(Ml ��c- � 60 145' T ' �41 TWO-WATWO-WAYROAD 7W0�O I I I I I I I I I I I I I I I i I I I I SEWER COLLECTOR TIGHTLINE (TYP.) I I I A PROPERTY LINE RESTROOM 2 EA. 1200 GAL SEPTIC TANKS WITH BAFFLES REMOVED ��•`r,1 SEE NOTE 1� 1 10' (MIN.) 162' � - - - - - - 1 11104111111011111 r-"I I I111411111 r _ I I1111111111111. I I ION I I I I I•I I I I I I I PLAY 1 AREA co I I I 15� I I I I I I I I 1 1 I I I I I I 1101 1 1 1 1 L - d Ie I I I I I I I I P I I I I I I•IIIIIIIIIIII I 80' , � I PVC BALL VALVE ON EACH LINE 14 - IN-UNE FILTER 1" = 50' REVISIONS JAN., 1993 N0. DESCRIPTION 1 REVISED TO SHOW AS -BUILT CHANGES & ADDITIONS J.J.J. TNT/JFB y I I I 9' TYP.) o 6 7 MONITORING I 4LAC�. DRAINFIELD "B" SEE DETAIL 12 F OF °�° 15 ZO 16 1 SURVEY POINT ELEVATIONS 1. 97.8 2. 95.3 3. 90.8 4. 96.5 (SOIL LOG) 5. 93.4 6. 91.8 SOIL LOG) 7. 90,5 (TOP BANK) 8. 98.8 9. 98.3 (SOIL LOG) 10. 95.7 (SOIL LOG) 11. 91.8 (SOIL LOG) 12. 90.0 (TOP BANK) 13, 100.0 14. 97.4 (TOP BANK) 15. 93.7 (TOP BANK) 16. 91.0 (TOP BANK) I I I I I I I I I I I / I EXISTING DRAINFIELD (TO REMAIN) I I I I I I I 1 JEFFERSON DEPT. OF CJ,L1Nf SIGNATURE: r� � I Tgaik5A O BNORTHEAST LOTH PLACE (pouscomd ELLEELLEVUE, WASHINGTON 98005 TELEPHONE: (206) 455-3155 CONSTRUCTION ENGINEERING GROUP PRE DATE APP. IDISCOVERYJAN/93 JJJ BAY PROJECT SEWER RENOVATION DRAWING SUBJECT SITE FLAN - AS BUILT SHEET OF 2 DWG. NO. C-1